Project Interloper

CIA STARGATE release

CIA-RDP96-00789R002500230012-7

Opens with: UNITED STATES GOVERNMENT

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

3 pages, machine transcribed from the CIA’s released scan.

Approved For Release 2000/08/08 : CIA-RDP96-00789R002500230012-7
UNITED STATES GOVERNMENT
memorandum
S-23,003/PAG-TA
DATE:
25 January 1995
REPLY TO
ATTN OF:
PAG-TA
SUBJECT:
PAG-TA Monthly Activity Report - December 1994 (U)
TO:
PAG
1.
(U) Personnel:
- Per NMIPC (P-AS1) our authorized strength remains at
Stwith seven personnel assigned.
-
was offered and accepted a position in
the NMISC (SV-3) .
23 Jan 95.
Effective date of the transfer is
2.
(U) Administration:
- PAG-TA move to Building 2845 is scheduled for 19 Jan 95.
- Clean up day at old facility was hedd jon 2 Dec 94.
- Gdypromotion packets provided to
for completion.
3. (U) Training:
- None.
4.
(C) Travel:
- None.
5.
(U) Transportation/Logistics:
- Dec 94 mileage report forwarded to DAL-2 on
on 4 Jan 95.
REPRODUCTION REQUIRES
APPROVAL OF ORIGINATOR
OR HIGHER DOD AUTHORITY
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DOD AUTHORITY
WARNING NOTICE-INTELLIGENCE
SOURCES OR METHODS INVOLVED
LIMITED DISSEMINATION
CLASSIFIED BY MULTIPLE SOURCES
DECLASSIFY ON OADR
Approved For Release Zone/DSAsAFIA-RPP95-0780R0025902001.3-7
STAR GATE
OPTIONAL FORM NO. 10
(REV. 1-80)
GSA FPMR (41 CFR) 101-11.6
5010-114
Approved For Release 2000/08/08 : CIA-RDP96-00789R002500230012-7
6.
(S/NF/WN/SG/LIMDIS) Operations:
- To date, we have completed six projects in support of
PAN/PAG. Additional requirements from PAG-1 are
anticipated.
SG1A
- Four projects were conducted in support of Joint
Interagency Task Force-West (formerly JTF-5)
requirements. Since 3 Mar 94 we have completed 33
projects.
- Four projects were conducted in support of Joint
Interagency Task Force-East (formerly JTF-4)
requirements. To date we have completed eight projects.
- Software and the optical disk drive for our foreign data
base management system installed. We are awaiting for
the contractor to install the program that will preclude
the data to be stored on the hard disk drive.
- 6 Dec 94: At our initiative we briefed key CIA/CMS reps
regarding our mission, functions and organization.
Memorandum forwarded as to results.
- 13 Dec 94:
Project STAR GATE status report provided to
PDO in respGeJto a SAPOC request for information.
- 14 Dec 94:
chaired the monthly STIC-C
meeting. MSG prepared as to results and sent to
STIC/STIC-C addressees.J
SG1A
- 15 Dec 95:
Messrs.
met with
at our location regarding mission
requirements.
has drafted protocols for our
follow-on support aSGvities.
SG1C
- 5/8/12/19 Dec 94:
attended Technical
Intelligence Collection Review (TICR) meetings.
He is
REPRODUCTION REQUIRES
APPROVAL OF ORIGINATOR
OR HIGHER DOD AUTHORITY
WARNING NOTICE-INTELLIGENCE
SOURCES OR METHODS INVOLVED
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DOD AUTHORITY
LIMITED DISSEMINATION
2
Approved For Release 2000/08/08 : CIA-
A:RUF 96-UU789R002500230012-7
NOT RELEASABLE TO FOREIGN NATIONALS
STAR GATE
Approved For Release 2000/08/08 : CIA RDP96-00789R002500230012-7
SG1C
7.
(S/NF/SG/LIMDIS) Future Highlights:
- 19 Jan 95: Move to Building 2845.
- Continued participation TICR participation through
Feb 95.
- CDA responseGOJSAC due.
- 11 Jan 95:
to@PolA3monthly STIC-C meeting.
8. (U) Other:
- None.
REPRODUCTION REQUIRES
APPROVAL OF ORIGINATOR
OR HIGHER DOD AUTHORITY
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DOD AUTHORITY
WARNING NOTICE-INTELLIGENCE
SOURCES OR METHODS INVOLVED
LIMITED DISSEMINATION
3
NOT RELEASABLE TO FOREIGN NATIONALS
Approved For Release 2000/08/08 : CIASRAR9819789R002500230012-7

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.