UNITED STATES GOVERNMENT
memorandum
S-23,011/PAG-TA
DATE:
9 February 1995
REPLY TO
ATTN OF:
PAG-TA
SUBJECT:
PAG-TA Monthly Activity Report - January 1995 (U)
TO:
PAG
1.
(U) Personnel:
i
- Per NMIPC (P-AS1) our authorized strength remains at
11 with six personnel assigned.
-
SIO, PAG-TA, was offered and accepted
a position in the NMISC (SV-3) .
transfer was 23 Jan 95.
Effective date of the
2.
(U) Administration:
- PAG-TA move to Building 2845 was effected on 19 Jan 95.
A superb team effort by all our personnel. Special
thanks to DAL for their logistical/manpower support.
Especially commendable was the effort of
as our POC for this move; it would not have been
accomplished without his effort.
SG1J
- Removal of excess property from former facility
scheduled for 9 Feb 95.
3. (U) Training:
- None.
4.
(C) Travel:
- None.
5.
(U) Transportation/Logistics:
- Jan 95 mileage report forwarded to DAL-2 on
on 8 Feb 95.
REPRODUCTION REQUIRES
APPROVAL OF ORIGINATOR
OR HIGHER DOD AUTHORITY
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DOD AUTHORITY
WARNING NOTICE-INTELLIGENCE
SOURCES OR METHODS INVOLVED
LIMITED DISSEMINATION
CLASSIFIED BY MULTIPLE SOURCES
DECLASSIFY ON OADR
OPTIONAL FORM NO. 10
Approved ForRelease:3093191117 Clf/2596 0078AR0A250823001=8. 1-80)
STAR GATE
GSA FPMR (41 CFR) 101-11.6
8010-114
SG1J
-
SG1J
-
Approved For Release 2003/01/17 : CIA-RDP96-00789R002500230011-8
6.
(S/NF/WN/SG/LIMDIS) Operations:
- To date, we have completed six projects in support of
PAN/PAG. Additional requirements from PAG-1 are
anticipated.
SG1A
- No projects were conducted in support of Joint
Interagency Task Force-West (formerly JTF-5)
requirements during Jan 95. Since 3 Mar 94 we have
completed 33 projects.
- One project was conducted in support of Joint
Interagency Task Force-East (formerly JTF-4)
requirements. To date we have completed nine projects.
- One project was conducted in support of ONI requirements
(counterdrug) during Jan 95. Operations initiated in
support of briefings conducted at the NMIC during
Dec 94.
- Software and the optical disk drive for our foreign data
base management system installed. We are awaiting for
the contractor to install the program that will preclude
the data to be stored on the hard disk drive during the
early part of Feb 95.
is our focal
point for this effort.
SG1J
- 11 Jan 95:
chaired the monthly STIC-C
meeting. MSG prepared as to results and sent to
STIC/STIC-C addressees.
SG1J
- 26 Jan 95:
Patricia Keith, Ocean Resources Branch, and Lynn Wright,
Ocean Web Production, ONI.
Requirements to follow.
briefed
- 3/10/13/17/20/24/31 Jan 95:
Technical Intelligence Collection Review
(TICR) /Community Steering Group meetings. He is
attended
SG1J
REPRODUCTION REQUIRES
APPROVAL OF ORIGINATOR
OR HIGHER DOD AUTHORITY
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DOD AUTHORITY
WARNING NOTICE-INTELLIGENCE
SOURCES OR METHODS INVOLVED
LIMITED DISSEMINATION
2
Approved For Release 2003/01/17 CIA-RDP96-00789R002500230011-8
RELEASABLE TO FOREIGN NATIONALS
STAR GATE
SG1J
SG1C
:
Approved For Release 2003/01/17 : CIA-RDP96-00789R002500230011-8
DUCKUT
SG1C
7.
(S/NF/SG/LIMDIS) Future Highlights:
- 6 Feb 95: Meeting set with
ORD/CIA, new
Project STAR GATE program manager.
- Continued participation TICR participation through
Feb 95.
- CDA response to SAC due to GS.
- 8 Feb 95:
to chair monthly STIC-C meeting.
- 15 Feb:
Meeting scheduled with
ORD/CIA.
SG11
8. (U) Other:
- None.
SG1J
Chief, PAG-TA
REPRODUCTION REQUIRES
APPROVAL OF ORIGINATOR
OR HIGHER DOD AUTHORITY
FURTHER DISSEMINATION
ONLY AS DIRECTED BY PAG
OR HIGHER DOD AUTHORITY
WARNING NOTICE-INTELLIGENCE
SOURCES OR METHODS INVOLVED
LIMITED DISSEMINATION
3
Approved ForRelease-2092BLETAPP96-09789R802500230011-8
STAR GATE
SG11
SG1J

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.