CIA STARGATE release
CIA-RDP96-00789R001900250002-3
Opens with: PROJECT SUN STREAK (U)
Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.
1 page, machine transcribed from the CIA’s released scan.
. Approved For Release 2002/11/18 : CIA-RDP96-00789R001900250002-3 11/NOFORN - SKEET CHANNELS ONLY PROJECT SUN STREAK (U) ERV SESSION PROCEDURE REPORT WARNING NOTICE: INTELLIGENCE SOURCES AND METHODS INVOLVED CONTROL NUMBER : NICKNAME : Other "A" DATE OF SESSION: 2-6 Jun 86 TARGET COUNTRY : Unknown 25UN 45UN 6JUN REFERENCES : None SESSION NUMBER : 01, 02, 03 DATE OF REPORT: 31 Jul 86 MISSION STATUS: Initial/complete TECHNIQUE UTILIZED: ERV SOURCE IDENTIFIER: 101 SG1A 1. V ) TASKING: Initially the interviewer was provided a 3x5 card on which the following tasking was typed: "Identify the main chane features and purpose of the structures at (coordinate) In the two Subsequent sessions the interviewer was provided further verbal tasking and directions, i.e., " site is accurate but focus attention on tunnel and rocket device, ""additional emphasis on purpose of rocket device and relation to site." Throughout sessions the intermewer was never told the exact nature of the site, its key facilities nor its mission. In the initial session, the Source: was simply given the coordinates of the site, (encrypted to preclude inadvertent geographic cueing as per Extended Remote Viewing (ERV) protocols) . In subsequent sessions, Source was again provided the coordinates and a general synopsis of previously reported data. No additional specific tasking emphasis or intentional cueing was provided to Source. 2. ( ) SESSION: During the initial session, Source took a "joyride" to an unspecified site whose descriptive data did not coincide with the known data on the site. Source was retargetted, (coordinates repeated) and successfully acquired the site. In subsequent sessions Source was encourage to initially take a "joy ride" to a site of his choosing, (later to be designated "'Sanctuary") and from that site, at the direction of the interviewer, he was to move to the target. This technique appeared to eliminate inadvertent reporting on non-related targets and was enjoyable to the Source, therefore, the use of "Sanctuary" targetting will continue on a trial basis to dtermine its affect on the Source's success rate. P 3. ( ) SUMMARY : The following is comilation of the raw and unevaluated data provided by Source during the total of three sessions conducted on this target. a. ( ) A fenced complex of buildings and facilities with a feeling of military involvement. There are numerous scientists and technicians working at the site. Some areas of the site are above ground, (builiungs and related facilities), while other areas are underagournd or at least partially under- ground. Mnay of the buildings appear to be abandoned completely including one building (next to a railroad track) which may have once been a depot. This building Approved Por Refedse 2002hp1/48mPCIA-RDP96100789R001900250002-Bt of