Project Interloper

CIA STARGATE release

CIA-RDP96-00789R001900250001-4

Opens with: OFORN - SKEET CHANNELS ONLY

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

3 pages, machine transcribed from the CIA’s released scan.

Approved For Release 2000/08/08 : CIA-RDP96-00789R001900250001-4
OFORN - SKEET CHANNELS ONLY
PROJECT SUN STREAK (U)
ERV SESSION PROCEDURE REPORT
WARNING NOTICE:
INTELLIGENCE SOURCES AND METHODS INVOLVED
CONTROL NUMBER :
NICKNAME:
Other "A"
DATE OF SESSION: 2-6 Jun 86
TARGET COUNTRY :
Unknown
2JUN
45 UN
6JUN
REFERENCES :
None
SESSION NUMBER :
01, 02, 03
DATE OF REPORT:
31 Jul 86
MISSION STATUS:
Initial/complete
TECHNIQUE UTILIZED:
ERV
SOURCE IDENTIFIER:
101
-
nowe
052
SG1A
1.
(
)
TASKING:
Initially the interviewer was provided a 3x5 card
on which the following tasking was typed:
"Identify the main shape, features and
In the
purpose of the structures at (coordinate)
two Subsequent sessions the interviewer was provided further verbal tasking
and directions, i.e., " site is accurate but focus attention on tunnel and
rocket device," "additional emphasis on purpose of rocket device and relation to
site." Throughout sessions the interviewer was never told the exact nature
of the site, its key facilities nor its mission. In the initial session, the
Sourceewas simply given the coordinates of the site, (encrypted to preclude
inadvertent geographic cueing as per Extended Remote Viewing(ERV) protocols).
In subsequent sessions, Source was again provided the coordinates and a general
synopsis of previously reported data.
No additional specific tasking emphasis or
intentional cueing was provided to Source.
2.
(
)
SESSION:
During the initial session, Source took a "joyride"
to an unspecified site whose descriptive data did not coincide with the known
data on the site. Source was retargetted, (coordinates repeated) and
successfully acquired the site. In subsequent sessions Source was encourage
to initially take a "joy ride" to a site of his choosing, (later to be designated
"Sanctuary") and from that site, at the direction of the interviewer, he was
to move to the target. This technique appeared to eliminate inadvertent
reporting on non-related targets and was enjoyable to the Source, therefore,
the use of "Sanctuary" targetting will continue on a trial basis to dtermine
its affect on the Source's success rate.
(
P
3.
)
SUMMARY :
The following is comilation of the raw and unevaluated
data provided by Source during the total of three sessions conducted on this
target.
a.
(
)
A fenced complex of buildings and facilities with a feeling
of military involvement. There are numerous scientists and technicians working
at the site. Some areas of the site are above ground, (builidngs and related
facilities), while other areas are underagournd or at least partially under-
ground. Mnay of the buildings appear to be abandoned completely including one
building (next to a railroad track) which may have once been a depot. This
building appears to be outside the compound perimeter but the concept of
Approved For Release 2000/08/08 : CIA-RDP96-00789R001900250001-4
1
Approved For Release 2000/08/08 : CIA-RDP96-00789R001900250001-4
a railroad has some importance to the site.
a building
b.
(
)
Among the many buildings on the site is newer than many
of the other buildings and appears to be used in some type of technical
maintenance or construction activity. There were impressions of metallic and
machine noices, soldering, suspense dates, assembly line operations, blue
overalls. There was an emotional sense of stress, danger, time constraints.
c.
(
)
A Key facility centered around an object, described as
a metallic device, large enough to require scaffolding to perform maintenance
and preparatory activity. The device is sectionalized and reconstituted at
this site. The device travels very fast (perhaps straight into the air) with
an impression of the device resembling a ship. The device is transported from
its building (site) through huge doors. A smell of menthol in the air.
d.
(
) The device is surrounded by a metal scaffolding device made
of a red colored metal framework. Tracks (railway tracks) are in the general area
of the device further described as cylindrical and resting on a platform several
feet off the ground. In the near vicinity of the device is a domed structure
(not a building) which is related to the functioning of the divice.
e.
(
)
Workers in the vicinity of the device are tense and
nervous and fearful of the ramifications of a failure. These outcomes include
destruction, loss of face, threat to security. The purpose of the device
in conjuntion with the facility is to modify and test "tensil strength",
"variances," "sensing systems," "monitoring" and "insure stability."
f.
)
The cylindrical device is designed to fit within
a tube or launching device where one tolerance is very exact and requires
very exacting measurements and control when "loading." A typical "firing"
displays great "heat, " "energy," "pressure," "speed" and potentials for danger.
During such a "firing". thousands of variables are monitored on numerous electronic
devices whose sensors are located both on the device and within the "tube."
g.
-
)
The "tube is segmented andjoined by securing rings.Within the
tube there are numerous electronic sensor devices for measuring "pressure,"
"molecular change, " "heat," "speed," "tensil strength," "gyroscopic effect"
and "inertia." Devices are monitored from central control facility.
1
h.
(
)
Human labor, assisted by scaffolding device is used to line
up lands and grooves of tube and device. Each movement is guided by a human
viewing the precise and slow "lowering" of the device into the tube.
A
"motor" powers the device in the tube but only after each phase of fitting and
checking is carefully completed. An impression of great amounts of steam and
heat during "firing." The ultimate purpose of the device could not be discerned.
4.
)
OPS FEEDBACK:
Source has successfully acquired the target
site and has describe some of the general gestalts of the main target.
However, the actual tasking has not been adequately fulfilled by this Source
although his data did provide certain confirmatory insights. It should be
noted that an inexperienced RV interviewer was utilized on this target to provide
Approved For Release 2000/08/08 : CIA-RDP96-00789R001900250001-4
2
.
.
Approved For Release 2000/08/08 : CIA-RDP96-00789R001900250001-4
training not only to the Source but to the newly assigned Interviewer.
This inexperience in the arena of RV could have been influential in not
acquiring sufficient descriptive data to adequate describe the site and its
activities.
SG1J
Approved For Release 2000/08/08 : CIA-RDP96-00789R001900250001-4
3

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.