CIA STARGATE release
CIA-RDP96-00789R000500200018-6
Opens with: PROJECT SUN STREAK
Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.
6 pages, machine transcribed from the CIA’s released scan.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200018-6 NOFORN 8 Juni 89 PROJECT SUN STREAK WARNING NOTICE: INTELLIGENCE SOURCES AND METHODS INVOLVED --------- PROJECT NUMBER: 8915 SESSION NUMBER: 04 DATE OF SESSION: 08 JUN 89 DATE OF REPORT: 08 JUN 89 START: 0907 END: 0922 METHODOLOGY: CRV VIEWER ID: 095 ------- ------------------------- -- ------------ 1. (S/NF/SK) MISSION: To determine and describe the key functions and supporting activities of a target consisting of structures represented in overhead photography. 2. (S/NF/SK) VIEWER TASKING: Encrypted coordinates 623826/696347 only. 3. (S/NF/SK) COMMENTS: a. Inclemencies: Tired. b. 095 continued in Stage 4, concentrating on the activities and functions within the "smaller structures". C. Summary of Information enclosed. 4. EVALUATION: 5. SEARCH EVALUATION: N/A 3 encl: Viewer's summary Session transcript Tasking sheet HANDLE VIA SKEET CHANNELS ONLY NOFORN CLASSIFIED BY: DIA (DT) DECLASSIFY: OADR NOFORN Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200018-6
1 Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200018-6 € WORKING PAPER P: 89 15 V: 095 D: 890608 S: 4 SUMMARY OF INFORMATION The inside of the small building is long when compared to width. Every 10-15 feet are metal beams running widthwise across the ceiling. There are metal things (A/S: hooks or clamps) hanging from the beams. The floor is shiny, polishy cement. The building is 40-80 feet wide and the ceiling is 20-30 feet high. Teams of 6-8 men are working on the vehicles (mobile weapon systems) . They are wearing old, worn out clothing. The turn around time for each team on a vehicle is 2 weeks. The vehicles are brought in 10-20 at a time on something flat A/S 'like' a flatbed railroad car or truck. The workers here are efficient and surprisingly serious and committed about their work. This is not a slack operation -- things are done with precision and pride. HANDLE VIA SKEET CHANNELS ONLY Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200018-6
095 Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200018-65T Make Muito 18 6/8/89 0907-0922 PI Tired AV nue [623826/696347] 5-2 D . A1 13 T 2 AOU A/S [small 6/dg] white gray. log und wigh Sideview front view ferm. Smooth 1 Stil slick and floor . Polistry en face . cool [activity ] A/S. Swift St/2 working avchick things Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200018-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200018-6 9 20-30ft 1 = - 40-80 ft. 1 Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200018-6
3 Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200018-6 5-2 D AI 13 T - ALS St1/2 work is performed by teams of 6-8 men, Old won · out clothing. Turn mound time is 2 weeks. Sy/2 vehicles are brought in 1020 at a time On seth flut "like" A flatled railroad conn truck. workers have are surprisingly serious + committed . Not a slack operation. Things are the right. with precision + prideo 0922 Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200018-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200018-6 /NOFORN WORKING PAPER 08 JUN 89 TASKER 1. PROJECT : 8915 2. Encrypted coordinates: 623826/696347. 3. Tasking: "The target site consists of structures represented in overhead photography." 4. Required EEI: a .. Determine and describe the key function of the target site. b. Describe the activities taking place in support of the key function. Provide an overhead perspective of the target site; submit sketches in support of findings. (SEE OPS FOR THE CONDUCT OF A SEARCH IN THIS PROJECT ONCE 4A THROUGH 4C HAVE BEEN SATISFIED. ) /NOFORN Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200018-6