CIA STARGATE release
CIA-RDP96-00789R000300200001-6
Opens with: PROJECT SUN STREAK (U)
Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.
5 pages, machine transcribed from the CIA’s released scan.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6 2009-12 SECRET/NOFORN - SKEET CHANNELS ONLY PROJECT SUN STREAK (U) SRV SESSION PROCEDURES REPORT WARNING NOTICE: INTELLIGENCE SOURCES AND METHODS INVOLVED CONTROL NUMBER: 8702 NICKNAME: None DATE OF SESSION: 25, 27 Mar 87 TARGET COUNTRY: UR REFERENCES: SPR-001-87 Dated SESSION NUMBER: 02, 03 25 March 1987, SAB DATE OF REPORT: 1 April 1987 MISSION STATUS: Closed TECHNIQUE UTILIZED: SRV SOURCE IDENTIFIER: 101 SG1A 1. (S/NF/SK) TASKING: On 25 March 1987, Source was provided a small opaque envelope which had been prepared for him by hand lettering the number, "8702", (the mission reference number) , across the front of the envelope. Additionally, a penciled, "due date", of 26 March 1987 was included on the envelope. Sealed inside the envelope was a small sheet of notebook paper on which was written the following tasking: "Project FY8702. Tasking for Remote Viewer. 1) Describe: Personnel, activity, and equipment relevant to recent construction of SG1A SG1A 2) Refute or verify suspected purpose of construction efforts. On 26 March 1987, as directed Source provided the results of His impressions on this tasking. After a review of these results it was decided to instruct Source to retain the same envelope, i.e., the same tasking with a new suspense date of 30 March 1987. This "new" tasking was provided to Source Verbally on 27 March 1987 which was a Friday, thus necessitating the longer suspense period. Source was told at that time that His results had come close to answering some of the tasking but certain key elements were missing and therefore the tasking, as it stood, would still be valid. Source was not told specifically what elements of His previous reporting was correct. In each of the two tasking sessions included in this report, Source was told to keep the envelope in his possession and to provide a written summary of His Remote Viewing perceptions pertaining to the tasking sealed within the envelope on the suspense date indicated on that envelope. No other cuing or restriction/guidance were provided to Source except to remind him not to unseal the envelope and to provide His written results by close of business on the suspense date indicated. SECRET/NOFORN - SKEET CHANNELS ONLY Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6 SECRET/NOFORN - SKEET CHANNELS ONLY 2. (S/NF/SK) SESSION: Source did report any unusual anomalies or incidents which may have influenced the data provided in His summaries. No assistance, interviewing or prompting was provided by any other individuals. 3. (S/NF/SK) SUMMARY: a. (S/NF/SK) The following narratives, contained within quotation marks, are an abridged copy of Source's written impressions pertaining to the taskings provided to Source as explained above. These summaries have been editorialized, (as indicated) , by the undersigned for clarity, grammar and structure. The actual unabridged summaries are maintained in the mission field dossier at this location along with all other material relevant to these taskings, i.e., the envelopes, tasking sheets, sketches, etc. 25 MARCH 1987 - BEGIN SUMMARY: "Inside (the) large building (there) is less activity than yesterday. Outside (it is) still damp . (On) the upper floors (there) is a woman briefing a chart. (accompanying sketch depicted a standard bar graph with the notations: "Old, New, and Distribution of Resources/Allocation to Projects or Areas. Under the five double (comparison) bars were the alphabetic notation A through E). You can see into the room from (the) hallway or maybe (from) another room. (The) woman is explaining - (an improper reference) - "relating" a shift in resources and allocations. Some projects or areas will be receiving less or (be) cancelled entirely. This will mean a lot of these (projects) will be extended over (a longer period of) time. (The) area on the far right will have increased resources because of (its) demonstrated success potential. This area project will still extend several years (into the future, perhaps) two or three (years) ? All milestones ... are important and are not arbitrary and will occur earlier (than projected) . There is a very clear, uncomplicated, uncluttered plan here (which) surprises me but I do not know why. (The) people (here) are being given direction and guidance. Different roles will intermesh at different points in time. enter another room. This room has an "L" shaped table (which) is set ... facing a desk. I check out for a second (momentarily leave the target) and see (a member of my unit) . He tells me, "Now go and find out what is going on in this room! ! ... They are planning a budget, but it really is not important. It is like the budget is just eyewash or if the man needs more money (there will be) no problem. This (tasking) has to do (in some) way with construction. They are (in) a building program. Part of this has to do with the physical movement of a group of earth or dirt. I (get) a symbolic (impression) or civilians in a large hall clapping and giving a standing ovation. (I also sense that) the decision to redistribute the resources came from outside the building in some way. (A final impression is) in SECRET/NOFORN - SKEET CHANNELS ONLY Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6 SECRET/NOFORN - SKEET CHANNELS ONLY one of the rooms there was a large white box that was like a sand table in a way. People would reach in and move things (object?) around inside. " END 25 MARCH 1987 SUMMARY BEGIN 30 MARCH 1987 SUMMARY: " (The) building is secure. (There is) a "checker" (control guard) on (the) right side as you enter the building. (The) area around (the) building is also casually patrolled (with people) like police in vehicles. (The) floors are ridged somehow, running parallel to the ground. (The) sky is overcast and it is rainy. (I) move to an upper floor, perhaps the 2nd or 3rd (floor), where I was before (in the previous tasking summary) . (I am in the) room with an "L" shaped table. ( I) looked for a man who would know what is going on. He was considering a matrix. ( I) had to remember that (the) matrix looked two dimensional but was really three dimensional, (an accompanying sketch depicted two sketches. The first resembled a normal cross hatched grid pattern. The second resembled a cubed grid pattern similar to a rubiks cube) . in what was being planned (here) . Construction and movement was involved People were hoping that the expectations of the others would be reasonable and realistic. Water may be involved in some way with what they are doing. I found myself in another part of the building with a girl who showed me a picture on a machine, (an accompanying sketch depicted a curved excavation, size unknown, with a dome like structure over the excavation. The interior of the excavation seemed to contain a multi-level construction of some sort with a central vertical core leading from the base of the excavation to the surface) . (The picture shown to me by the woman) was of a structure sloping down and then up below the surface. (The) structure had a central core and several horizontal floors or braces. It was covered by a very low sloping top or roof. The session was very confused. I kept bouncing around and had to keep coming back to the building ... there is much that I do not remember. The word, "O LIG RA" (phonetic) may possibly be (of some) importance. As I was losing the site, I asked for the answer's to (the Operations Officer 's) question (and received the following impressions) : A. Yes, B. In two or three years, C. On a reduced scale." END 30 MARCH 1987 SUMMARY b. (S/NF/SK) A review of both written summaries revealed several references to known or suspected aspects of the target site. Although Source's impressions did not positively answer the tasking as provided to Him, many of His descriptions were considered relevant and are provided herewith in raw unevaluated form: (1) (S/NF/SK) In both summaries, Source made continued reference to on-going construction project of apparent large magnitude in that it will take two to three years for completion. Although the time frame for completion is not known, the magnitude SECRET/NOFORN - SKEET CHANNELS ONLY Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6 SECRET/NOFORN - SKEET CHANNELS ONLY of the construction project is and it is entirely conceivable that it could take as long as two to three years to complete. The key phrase however, is not the length of the project, but the fact that Source was able to perceive the fact of a large scale construction project which was a key element of the tasking. (2) (S/NF/SK) In apparent response to the tasking to "Describe personnel /activity .... relevant to recent construction ... " Source seems to have focused on the more senior levels of management in charge with overseeing the completion and/or funding of this project. If this is the fact, then it would seem that the overseeing functions are perfunctory at best and that fiscal support for this project will be forthcoming even at the expense of other projects. Carried one step further, that would seem to lend some credence to the concept that what is being done at this project has some degree of immediate importance and priority not indicative of a simple expansion plan. (3) (S/NF/SK) As to the actual purpose of the construction, Source was unable to positively provide any insights into this aspect of the tasking. However, several concepts and phrase did provide some indications that may be of analytic importance. Specifically, Source was able to perceive a facility that will be partially subterranean in nature with a multiple levels. The words, "central core", "three dimensional matrix" and "the involvement of water" could be powerful indicators of the presence of some type of nuclear activity. When compared to the known data on the target, the customer tasking and the other data provided by the Source, this concept seems even more valid. Although not, in itself a positive reply, it is the opinion of the Task Monitor (the undersigned) , that Source's descriptions, sketches, etc., were lucid enough to indicate that the strong possibility exist that this site construction is designed to house nuclear materials. The purpose or nature of those nuclear materials is unknown however, the presence of such materials in close proximity to a populated area would seem to indicate more benign plans vice the concept of weapons or hazardous experimentation. 4. (S/NF/SK) OPS FEEDBACK: Source was told that his material was extremely interesting and in some cases, apparently quite relevant. He was told, however, that no further taskings would be conducted on this target by Him and that future taskings would pertain to other unrelated targets. SG1J GS-12, DAC SECRET/NOFORN - SKEET CHANNELS ONLY Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6 PROJECT FY 8702 TASKING FOR REMOTE VIEWER SG1A 1) DESCRIBE: PERSONNEL/ACTIVITY EQUIPMENT RELEVENT TO RECENT CONSTRUCTION SG1B 2) REFUTE OR VERIFY SUSPECTED PURPOSE OF CONSTRUCTION EFFORTS. Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6