Project Interloper

CIA STARGATE release

CIA-RDP96-00789R000300200001-6

Opens with: PROJECT SUN STREAK (U)

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

5 pages, machine transcribed from the CIA’s released scan.

Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6
2009-12
SECRET/NOFORN - SKEET CHANNELS ONLY
PROJECT SUN STREAK (U)
SRV
SESSION PROCEDURES REPORT
WARNING NOTICE:
INTELLIGENCE SOURCES AND METHODS INVOLVED
CONTROL NUMBER: 8702
NICKNAME: None
DATE OF SESSION: 25, 27 Mar 87
TARGET COUNTRY: UR
REFERENCES: SPR-001-87 Dated
SESSION NUMBER: 02, 03
25 March 1987, SAB
DATE OF REPORT:
1
April
1987
MISSION STATUS: Closed
TECHNIQUE UTILIZED:
SRV
SOURCE IDENTIFIER: 101
SG1A
1.
(S/NF/SK)
TASKING:
On 25 March 1987, Source was provided a
small opaque envelope which had been prepared for him by hand
lettering the number, "8702", (the mission reference number) ,
across the front of the envelope.
Additionally, a penciled, "due
date", of 26 March 1987 was included on the envelope.
Sealed
inside the envelope was a small sheet of notebook paper on which
was written the following tasking:
"Project FY8702.
Tasking for
Remote Viewer.
1) Describe: Personnel, activity,
and equipment relevant to recent construction of
SG1A
SG1A
2)
Refute or verify suspected purpose of
construction efforts.
On 26 March 1987, as directed Source
provided the results of His impressions on this tasking.
After a
review of these results it was decided to instruct Source to retain
the same envelope, i.e., the same tasking with a new suspense date
of 30 March 1987.
This "new" tasking was provided to Source
Verbally on 27 March 1987 which was a Friday, thus necessitating
the longer suspense period.
Source was told at that time that His
results had come close to answering some of the tasking but certain
key elements were missing and therefore the tasking, as it stood,
would still be valid.
Source was not told specifically what
elements of His previous reporting was correct.
In each of the two
tasking sessions included in this report, Source was told to keep
the envelope in his possession and to provide a written summary of
His Remote Viewing perceptions pertaining to the tasking sealed
within the envelope on the suspense date indicated on that
envelope.
No other cuing or restriction/guidance were provided to
Source except to remind him not to unseal the envelope and to
provide His written results by close of business on the suspense
date indicated.
SECRET/NOFORN - SKEET CHANNELS ONLY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6
SECRET/NOFORN - SKEET CHANNELS ONLY
2.
(S/NF/SK)
SESSION:
Source did report any unusual anomalies or
incidents which may have influenced the data provided in His
summaries. No assistance, interviewing or prompting was provided
by any other individuals.
3.
(S/NF/SK)
SUMMARY:
a.
(S/NF/SK)
The following narratives, contained within
quotation marks, are an abridged copy of Source's written
impressions pertaining to the taskings provided to Source as
explained above.
These summaries have been editorialized, (as
indicated) , by the undersigned for clarity, grammar and structure.
The actual unabridged summaries are maintained in the mission field
dossier at this location along with all other material relevant to
these taskings, i.e., the envelopes, tasking sheets, sketches, etc.
25 MARCH 1987 - BEGIN SUMMARY: "Inside (the) large building
(there) is less activity than yesterday.
Outside (it is) still
damp .
(On) the upper floors (there) is a woman briefing a chart.
(accompanying sketch depicted a standard bar graph with the
notations: "Old, New, and Distribution of Resources/Allocation to
Projects or Areas.
Under the five double (comparison)
bars were
the alphabetic notation A through E). You can see into the room
from (the) hallway or maybe (from) another room.
(The) woman is
explaining - (an improper reference) - "relating" a shift in
resources and allocations.
Some projects or areas will be
receiving less or (be) cancelled entirely. This will mean a lot of
these (projects) will be extended over (a longer period of) time.
(The) area on the far right will have increased resources because
of (its) demonstrated success potential.
This area project will
still extend several
years
(into the future, perhaps) two or three
(years) ? All milestones ... are important and are not arbitrary and
will occur earlier (than projected) .
There is a very clear,
uncomplicated, uncluttered plan here (which) surprises me but I do
not know why.
(The) people (here)
are being given direction and
guidance.
Different roles will intermesh at different points in
time.
enter another room.
This room has an "L" shaped table
(which) is set ... facing a desk.
I check out for a second
(momentarily leave the target) and see (a member of my unit) .
He
tells me,
"Now go and find out what is going on in this
room! ! ... They are planning a budget, but it really is not
important. It is like the budget is just eyewash or if the man
needs more money (there will be) no problem. This (tasking) has to
do (in some) way with construction. They are (in) a building
program.
Part
of this has to do with the physical movement of
a group of
earth or dirt.
I
(get) a symbolic (impression)
or
civilians in a large hall clapping and giving a standing ovation.
(I also sense that) the decision to redistribute the resources came
from outside the building in some way.
(A final impression is) in
SECRET/NOFORN - SKEET CHANNELS ONLY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6
SECRET/NOFORN - SKEET CHANNELS ONLY
one of the rooms
there was a large white box that was like a sand
table in a way.
People would reach in and move things (object?)
around inside. "
END 25 MARCH 1987 SUMMARY
BEGIN 30 MARCH 1987 SUMMARY:
" (The) building is secure.
(There
is) a "checker" (control guard) on (the) right side as you enter
the building.
(The) area around (the) building is also casually
patrolled (with people) like police in vehicles.
(The) floors are
ridged somehow, running parallel to the ground.
(The) sky is
overcast and it is rainy.
(I) move to an upper floor, perhaps the
2nd or 3rd (floor), where I was before (in the previous tasking
summary) .
(I am in the) room with an "L" shaped table.
( I) looked
for a man who would know what is going on. He was considering a
matrix.
( I) had to remember that (the) matrix looked two
dimensional but was really three dimensional, (an accompanying
sketch depicted two sketches.
The first resembled a normal cross
hatched grid pattern.
The second resembled a cubed grid pattern
similar to a rubiks cube) .
in what was being planned (here) .
Construction and movement was involved
People were hoping that the
expectations of the others would be reasonable and realistic.
Water may be involved in some way with what they are doing.
I
found myself in another part of the building with a girl who showed
me a picture on a machine, (an accompanying sketch depicted a
curved excavation, size unknown, with a dome like structure over
the excavation.
The interior of the excavation seemed to contain a
multi-level construction of some sort with a central vertical core
leading from the base of the excavation to the surface) .
(The
picture shown to me by the woman) was of a structure sloping down
and then up below the surface.
(The) structure had a central core
and several horizontal floors or braces.
It was covered by a very
low sloping top or roof.
The session was very confused.
I kept
bouncing around and had to keep coming back to the building ... there
is much that I do not remember.
The word, "O LIG RA" (phonetic)
may possibly be (of some) importance.
As
I was losing the site, I
asked for the answer's to (the Operations Officer 's) question (and
received the following impressions) : A. Yes, B.
In two or three
years, C.
On a reduced scale." END 30 MARCH 1987 SUMMARY
b.
(S/NF/SK)
A review of both written summaries revealed
several references to known or suspected aspects of the target
site.
Although Source's impressions did not positively answer
the
tasking as provided to Him, many of His descriptions were
considered relevant and are provided herewith in raw unevaluated
form:
(1) (S/NF/SK)
In both summaries, Source made continued
reference to on-going construction project of apparent large
magnitude in that it will take two to three years for completion.
Although the time frame for completion is not known, the magnitude
SECRET/NOFORN - SKEET CHANNELS ONLY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6
SECRET/NOFORN - SKEET CHANNELS ONLY
of the construction project is and it is entirely conceivable that
it could take as long as two to three years to complete.
The key
phrase however, is not the length of the project, but the fact that
Source was able to perceive the fact of a large scale construction
project which was a key element of the tasking.
(2)
(S/NF/SK)
In apparent response to the tasking to "Describe
personnel /activity .... relevant to recent construction ... " Source
seems to have focused on the more senior levels of management in
charge with overseeing the completion and/or funding of this
project. If this is the fact, then it would seem that the
overseeing functions are perfunctory at best and that fiscal
support for this project will be forthcoming even at the expense of
other projects.
Carried one step further, that would seem to lend
some credence to the concept that what is being done at this
project has some
degree of immediate importance and priority not
indicative of a simple expansion plan.
(3) (S/NF/SK)
As to the actual purpose of the construction,
Source was unable to positively provide any insights into this
aspect of the tasking.
However, several concepts and phrase did
provide some indications that may be of analytic importance.
Specifically, Source was able to perceive a facility that will be
partially subterranean in nature with a multiple levels.
The
words, "central core", "three dimensional matrix" and "the
involvement of water" could be powerful indicators of the presence
of some type of nuclear activity.
When compared to the known data
on the target, the customer tasking and the other data provided by
the Source, this concept seems even more valid. Although not, in
itself a positive reply, it is the opinion of the Task Monitor (the
undersigned) , that Source's descriptions, sketches, etc., were
lucid enough to indicate that the strong possibility exist that
this site construction is designed to house nuclear materials.
The
purpose or nature of those nuclear materials is unknown however,
the presence of such materials in close proximity to a populated
area would seem to indicate more benign plans vice the concept of
weapons or hazardous experimentation.
4.
(S/NF/SK)
OPS FEEDBACK:
Source was told that his material was
extremely interesting and in some cases, apparently quite relevant.
He was told, however, that no further taskings would be conducted
on this target by Him and that future taskings would pertain to
other unrelated targets.
SG1J
GS-12, DAC
SECRET/NOFORN - SKEET CHANNELS ONLY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6
PROJECT FY 8702
TASKING FOR REMOTE VIEWER
SG1A
1)
DESCRIBE: PERSONNEL/ACTIVITY
EQUIPMENT RELEVENT
TO RECENT CONSTRUCTION
SG1B
2) REFUTE OR VERIFY SUSPECTED
PURPOSE OF CONSTRUCTION EFFORTS.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300200001-6

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.