Project Interloper

CIA STARGATE release

CIA-RDP96-00789R003500850002-9

Opens with: PROJECT SUN STREAK

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

9 pages, machine transcribed from the CIA’s released scan.

Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
Disjon 90
NOFORN
PROJECT SUN STREAK
WARNING NOTICE: INTELLIGENCE SOURCES AND METHODS INVOLVED
PROJECT NUMBER: 8937
SESSION NUMBER: 002
DATE OF SESSION: 04 Jan 90
DATE OF REPORT: 23 Jan 90
START: 1434
END: 1519
METHODOLOGY: Solo
VIEWER IDENTIFIER: 018
------
1.
(S/NF/SK)
MISSION:
Describe physical characteristics,
interior, and purpose of a target structure, and its
surroundings, designated by encrypted coordinates 893292/733830.
2.
(S/NF/SK)
VIEWER TASKING:
Encrypted coordinates, plus
describe interior and purpose of mission-important structures at
site.
3.
(S/NF/SK)
COMMENTS:
Viewer reported no PIs.
Accuracy of
information is unknown, but may be plausible.
4.
(S/NF/SK)
EVALUATION:
5.
(S/NF/SK)
SEARCH EVALUATION:
N/A
HANDLE VIA SKEET CHANNELS ONLY
NOFORN
CLASSIFIED BY:
DIA
(DT)
DECLASSIFY:
OADR
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
-
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
WAPRILIED
WORKING PAPER
Project:
8937
Date:
900104
Time:
1434-1519
Viewer:
018
Session:
02
SUMMARY OF INFORMATION:
1.
(S/NF/SK)
-
Describe the interior of the site structure:
The
structure, at least every part I saw of it, was virtually windowless.
In
the upper portion, there were empty hallways, painted off-white and trimmed
in blue. In a below-ground level, there was an area of pipes, machines,
lab-type equipment, and a tall cylindrical "tank" which held a very slick
liquid (this slick liquid was what I saw first upon entering the structure).
The liquid had a very slight smell which reminded me of liquid fertilizer.
The liquid was very slick low in the tank, but also covered the sides (which
felt like fiberglass). High on the sides, the liquid became sticky (see
sketch, page 3).
2.
(S/NF/SK) Describe the purpose of the structure: I found no activity
in the building at the time for viewing. Was working under a heavy PI, and
found it impossible to move off present time. Perceptions of purpose were:
storage, service, and "civil".
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9 , 8
4 JAN 89
1434 HUS
FT. MEADE
SOLO
SESSION 2
P.I.
YES.
A.V.
Provisus SESSION
AOL JUK
NUCLEAR REACTOR.
SITE IS INTERIOR OF STRUCTURE.
893292
733830
Lool Swe
Aans55
SOFT
SmarTH
B:
GOTTALIQUID
893292
733830
2
e
A. ACROSS
LOOPING
1movou
B: LIQUID
893292
733838
-
ACROSS
suoont
BREAK ( MIDPOINT)
ACROSS
SMOOTH
B.
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
. .
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
2)
893292
83
ABOUT
893292
73383
:
2
IRREGULAR
B: LIQUID
52: SLICKy Fool
A:
RISING
ANGIE
RESISTANCE
B:
STRUCTURE
52: Brown
SEAT SOLID
HAND
THIN.
U/I FEELING
OF RESISTANCE
Az MK
FOOLS LIKE PRESSING
ON A SHOOT OF
FIBERGLASS/PLASTIC.
MOLDED
(STANO 4)
nousH
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
"JUTTING det .
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
3
52:
Brown
ROUGH
TEXTURED
JUTTING OUT
53:
SOLID, BROWN
"MOLDED" WALL
1
SLICK FOOLING
LIQUID
:
SLICK LIQUID
ALSO BE
ForLOVERS TatIS
PART OF THE
WALL,
54:
52
(LIQUID)
1
BOTTOM
1
SLICK
WARM
Approved Før Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
54/2
11
THE LIQUID
WHICH FOOLS
vony SLICK" DOLOW, FEELS "STICKY" ON
THE WALLS, OP HIGHOU.
52
D
...
1 = An A/S.
LIQUID)
SALTY TASTE
MUSKY SMOLL
AOL MK
CRUDE OIL.
Azr MK
SMELL OF
LIQUID FOUTILIZA,
CRACKLING SOUND
NO / on SLIGHT smoLL
1
MUSKY, THICK "FOOL" TO BREATHED AIR.
DIRTY, SALTY JASTS
-
VonY SLICK FOOL
A/S
MONELIKE SOAPY LIQUID
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
5
52
D
57
V
on Als .
1 AM
1
A/SiVISUAL:
TALL VAT w/ PIPOS
STANDING IN A
BASEMENT CONNOR.
....
. .
.
(STRUCTURE)
BUILDING )
-
(INSIDE)
54/2
DEFINITO
"Y" CLUTTER
01
1
52
D
Al OI
WINDOWSSS
1
MACHINES
B16
PIPOS
HEAVY-DUTY
TODAS ACCELERATOR.
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
T
1
to ats .
52
0
m
5
(BLOG )
54/2
IMPRESSION THAT THE BLOG'S
15
PROSENT STRUCTURES OF BLOG
"SOMEBODYS
1
IDEA OF A PATCH-JOB.
CIVIL
STORAGE
SonVICE
PASTOR
OFF -toITS
HALLUM,
P.1. LeLAMING HOT IN BLDG ( THIS OND)
SESSION SND 1519
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
.
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9
UNCLASSIFIED
WORKING PAPER
TASKER Source no. 018
1.
PROJECT:
8937
2.
ENCRYPTED COORDINATES:
893292/733830
3,
TASKING:
Site description may be accurate; report of accident at site
is either innacurate or not presently relevant to site.
Access
interior of whichever of those structures you reported present at
the site is/are most important to satisfying 8937 mission
requirements and describe interior and purpose.
PROVIDE SKETCHES PRODUCED IN SUPPORT OF YOUR FINDINGS
:
UNCLASSIFIED
Approved For Release 2000/08/09 : CIA-RDP96-00789R003500850002-9

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.