CIA STARGATE release
CIA-RDP96-00789R003000450007-3
Opens with: Form Approved
Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.
4 pages, machine transcribed from the CIA’s released scan.
Approved For Release=2290/090 SAPR999007898003000450007-31 Form Approved OMB No. 0704-0188 2. TITLE Technical Report - Study/Services 1. IDENTIFICATION NUMBER DI-MISC-80508 3. DESCRIPTION/PURPOSE 3.1 A technical report provides fully documented results of studies or analyses performed. 4. APPROVAL DATE ( YYMMDD) 880115 5. OFFICE OF PRIMARY RESPONSIBILITY (OPR) G/T2137 6a.DTIC APPLICABLE X 6b. GIDEP APPLICABLE 7. APPLICATION/INTERRELATIONSHIP 7.1 This data item description contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract. 7.2 This DID supersedes DI-A-5029. 7.3 Defense Technical Information Center (DTIC), Cameron Station, Alexandria, VA 22314. 8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER G4291 10. PREPARATION INSTRUCTIONS 10.1 Format. (a) The report and all attachments shall be typewritten, or otherwise clearly lettered, and shall be duplicated using non-fading ink. (b) Text shall be prepared on standard letter size paper (8 1/2" X 11"). (c) When attachments are included, they shall be fully identified, referenced in the text, and folded to conform to the size paper used in the report. (d) Security classification and distribution markings shall conform to the requirements of the contract, purchase description and security requirements checklist, as applicable. 10.2 Content. (a) Title Page - Identifies the report by providing contract number, project name or purchase description title, task number, and reporting period. (continued on page 2) 11. DISTRIBUTION STATEMENT DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Fore 1664, JUN 86 (FACSIMILE) Previous editions are obsolete. Approved For Release 2000/08/08 : CIA-RDP96-00789R00300045060795 1 of 2 Pages
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000450007-3 DI-MGMT-80508 Block 10. Preparation Instructions (Continued) (b) Table of Contents (c) Section I - Includes the following: (1) Introduction (2) Summary - A brief statement of results obtained from the analytic effort. (3) Conclusions and their condensed technical substantiations. (d) Section II - A complete and detailed description of the analytic results which led to the conclusions stated in Section I above. ... .. . : .. . . Page 2 of 2 Pages Approved For Release 2000/08/08 : CIA-RDP96-00789R003000450007-3
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000450007-3 DEFENSE INTELLIGENCE AGENCY STAFF SUMMARY SHEET SG1A 1 ROUTE TO ACTION SIGNATURE (Grade and Surname) 1 RSQ Coord GG-15 ORIGINATOR (Symbol) DT-S DATE 10 Jan 91 2 OC Coord 1/17/91 ACTION OFFICER 4 ED Approve SIGNATURE SG1J SG1J TYPED GRADE AND SURNAME TYPIST'S INITIALS JB SUBJECT SG1J REMARKS 1. PURPOSE: Waiver of Senior Review Board (SRB) Process for Advanced Acquisition Planning (AAP) to procure external phenomenological research and analysis. 2. BACKGROUND: a. DIA first learned of the possibility of receiving Congressionally directed funds for conducting phenomenological research and analysis in mid-October 1990. Actual funding levels were not known until late November and the funds were not received in DIA until December 1990. b. Since this activity was not originally planned by DIA, there was no way to initiate an AAP package as required by February 1990. Consequently, due to the unexpected nature of this Congressional action, the resulting late timing of contract package initiation, and the need to expedite procurement to facilitate time critical research and planning actions, it is essential that a waiver for SRB involvement in processing this purchase request be granted. 3. RECOMMENDATION: ED approve waiver of SRB process for purchase request 330/0012Z/91 signing endorsement on this Staff Summary Sheet. 1 ENCLOSURE Procurement Request 330/00127/91 1/20/91 Approved Disapproved: SG1J Joh T Bubnil JOHN T. BERBRICH Assistant Deputy Director for Scientific and Technical Intelligence DIA FORM 1 OCTOBER 1962 (Previous edition will be used until exhausted) DIAR 12-0 Approved For Release 2000/08/08 : CIA-RDP96-00789R003000450007"3"ent Printing Office: 1983-418-630/6009 3 ESO
. Approved For Release 2000/08/08 : CIA-RDP96-00789R003000450007-3 CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of Information, Including suggestions for reducing this burden, to Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. A. CONTRACT LINE ITEM NO. 0002 B. EXH PATCH XOX C. CATEGORY: TDP TM OTHER X D. SYSTEM/ITEM Phenomenological Research and Analysis E. CONTRACT/PR NO. 330/0012Z/91 F. CONTRACTOR SAIC 1. DATA ITEM NO. A001 s progress, status, and management report 3. SUBTITLE Periodic Status Reports 4. AUTHORITY (Data Acquisition Document No.) DI-MGMT-80227 S. CONTRACT REFERENCE Para C.6.2, C.6.3. 6. REQUIRING OFFICE DIA/DT-5A 7. DO 250 REQ 9. DIST STATEMENT REQUIRED 10. FREQUENCY BI-MO- 12. DATE OF FIRST SUBMISSION 5 DARC 14. DISTRIBUTION b. COPIES .. ADDRESSEE Final Draft Reg Repro DT-5A 1 2 16. REMARKS Ref block 12: Contractor will provide draft report 3 DARP. Draft will be returned within 5 working days. 1. DATA ITEM NO. 2. TITLE OF DATA ITEM A002 Technical Report-Study/Services 3. SUBTITLE Interim Technical Reports 4. AUTHORITY (Data Acquisition Document No.) DI-MISC-80508 5. CONTRACT REFERENCE (S.O.W. ) 6. REQUIRING OFFICE DIA/DT-5A 7. DD 250 REQ 9. DIST STATEMENT REQUIRED 10. FREQUENCY 4TIME. 12. DATE OF FIRST SUBMISSION 5 DARC 14. DISTRIBUTION b. COPIES Final Draft 'Repro 2 Reg 2 DATA ITEM NO. A003 2. TITLE OF DATA ITEM 3. SUBTITLE : Special Report 4. AUTHORITY (Data Acquisition Document No.) DI-MISC-80508 5. CONTRACT REFERENCE Para C.6.1 6. REQUIRING OFFICE DIA/DT-5A 7, DO 250 REQ 9. DIST STATEMENT REQUIRED 10. FREQUENCY ONE/R" 12. DATE OF FIRST SUBMISSION See block 16 14. DISTRIBUTION b. COPIES .. ADDRESSEE Final ... Draft Reg Repro DT-5A 2 4 ; DATA ITEM NO. 2. TITLE OF DATA ITEM A004 3. SUBTITLE Final Technical Report 4. AUTHORITY (Data Acquisition Document NO.) DI-MISC-80508 5. CONTRACT REFERENCE Para C.6.2, C.6.3 (S.O.W. ) 6. REQUIRING OFFICE DIA/DT-5A 14. DISTRIBUTION b. COPIES I. ADDRESSEE »Final Reg Repro DT-5A. 6 15. TOTAL 2 6 J. DATE 23 JAN 91 DD Form 1423, APRxgg 1131/122 Previous editions are obsolete, Page of Pages Approved For Release 2000/08/08 : CIA-RDP96-00789R003000450007-3 ENCLOSURE 9 17. PRICE GROUP 18. ESTIMATED TOTAL PRICE 17. PRICE GROUP 18. ESTIMATED TOTAL PRICE 17.2PRICE: GROUP 18. ESTIMATED TOTAL PRICE 17. PRICE GROUP 16. ESTIMATED URA TOTAL PRICE 7. DO 250 REQ DIST STATEMENT REQUIRED 10. FREQUENCY ONE/R 12. DATE OF FIRST SUBMISSION "See block 16 C. APP CODE * A 11. AS OF DATE 0 13. DATE OF SUBSEQUENT SUBMISSION 16. REMARKS Ref block 12: Contents of this report will. encompass A004 plus any remaining contract_period. Contractor will provide draft report 5 DARP .! Draft will be returned within 7 working days H. DATE 7 JAN. 91 1. APPROVED BY DMO 1 2 &. APP CODE 11. AS OF DATE : 0 13. DATE OF SUBSEQUENT SUBMISSION 16. REMARKS Ref Block 12: Contractor will provide draft report 5 DARP. Draft will be returned within 7 working days. 15. TOTAL 2. 16. REMARKS Ref block 12: COTR will advise contractor on specific date for this Congressional support item. Estimated date is 1 May 1991. 15. TOTAL 2 4 L. APP CODE 11. AS OF DATE 0 13. DATE OF SUBSEQUENT SUBMISSION DT-5A a. ADDRESSEE 11. AS OF DATE 0 (S.O.W. ) 8. APP CODE A 13. DATE OF SUBSEQUENT SUBMISSION 15. TOTAL Para C. 6.2, C.6.3., C.6.5 (S.O.W.)