Project Interloper

CIA STARGATE release

CIA-RDP96-00789R003000450007-3

Opens with: Form Approved

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

4 pages, machine transcribed from the CIA’s released scan.

Approved For Release=2290/090 SAPR999007898003000450007-31
Form Approved
OMB No. 0704-0188
2. TITLE
Technical Report - Study/Services
1. IDENTIFICATION NUMBER
DI-MISC-80508
3. DESCRIPTION/PURPOSE
3.1 A technical report provides fully documented results of studies or
analyses performed.
4. APPROVAL DATE
( YYMMDD)
880115
5. OFFICE OF PRIMARY
RESPONSIBILITY (OPR)
G/T2137
6a.DTIC
APPLICABLE
X
6b. GIDEP
APPLICABLE
7. APPLICATION/INTERRELATIONSHIP
7.1 This data item description contains the format and content preparation instructions
for the data product generated by the specific and discrete task requirement as
delineated in the contract.
7.2 This DID supersedes DI-A-5029.
7.3 Defense Technical Information Center (DTIC), Cameron Station, Alexandria, VA 22314.
8. APPROVAL LIMITATION
9a. APPLICABLE FORMS
9b. AMSC NUMBER
G4291
10. PREPARATION INSTRUCTIONS
10.1
Format.
(a) The report and all attachments shall be typewritten, or
otherwise clearly lettered, and shall be duplicated using non-fading
ink.
(b) Text shall be prepared on standard letter size paper
(8 1/2" X 11").
(c)
When attachments are included, they shall be fully
identified, referenced in the text, and folded to conform to the size
paper used in the report.
(d) Security classification and distribution markings shall
conform to the requirements of the contract, purchase description and
security requirements checklist, as applicable.
10.2
Content.
(a) Title Page - Identifies the report by providing contract
number, project name or purchase description title, task number, and
reporting period.
(continued on page 2)
11. DISTRIBUTION STATEMENT
DISTRIBUTION STATEMENT A:
Approved for public release; distribution
is unlimited.
Fore 1664, JUN 86 (FACSIMILE)
Previous editions are obsolete.
Approved For Release 2000/08/08 : CIA-RDP96-00789R00300045060795
1 of
2 Pages
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000450007-3
DI-MGMT-80508
Block 10.
Preparation Instructions (Continued)
(b)
Table of Contents
(c)
Section I - Includes the following:
(1)
Introduction
(2)
Summary - A brief statement of results obtained
from the analytic effort.
(3)
Conclusions and their condensed technical
substantiations.
(d)
Section II - A complete and detailed description of the
analytic results which led to the conclusions stated in Section I above.
...
.. . :
..
. .
Page 2 of
2
Pages
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000450007-3
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000450007-3
DEFENSE INTELLIGENCE AGENCY STAFF SUMMARY SHEET
SG1A
1
ROUTE TO
ACTION
SIGNATURE (Grade and Surname)
1
RSQ
Coord
GG-15
ORIGINATOR (Symbol)
DT-S
DATE
10 Jan 91
2
OC
Coord
1/17/91
ACTION OFFICER
4
ED
Approve
SIGNATURE
SG1J
SG1J
TYPED GRADE AND SURNAME
TYPIST'S
INITIALS
JB
SUBJECT
SG1J
REMARKS
1.
PURPOSE:
Waiver of Senior Review Board (SRB) Process for Advanced
Acquisition Planning (AAP) to procure external phenomenological
research and analysis.
2.
BACKGROUND:
a.
DIA first learned of the possibility of receiving
Congressionally directed funds for conducting phenomenological research
and analysis in mid-October 1990. Actual funding levels were not known
until late November and the funds were not received in DIA until
December 1990.
b.
Since this activity was not originally planned by DIA, there was
no way to initiate an AAP package as required by February 1990.
Consequently, due to the unexpected nature of this Congressional
action, the resulting late timing of contract package initiation, and
the need to expedite procurement to facilitate time critical research
and planning actions, it is essential that a waiver for SRB involvement
in processing this purchase request be granted.
3.
RECOMMENDATION:
ED approve waiver of SRB process for purchase
request 330/0012Z/91 signing endorsement on this Staff Summary Sheet.
1 ENCLOSURE
Procurement Request 330/00127/91
1/20/91
Approved
Disapproved:
SG1J
Joh T Bubnil
JOHN T. BERBRICH
Assistant Deputy Director
for Scientific and
Technical Intelligence
DIA FORM 1 OCTOBER 1962
(Previous edition will be used until exhausted)
DIAR 12-0
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000450007"3"ent Printing Office: 1983-418-630/6009
3
ESO
. Approved For Release 2000/08/08 : CIA-RDP96-00789R003000450007-3
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this
burden estimate or any other aspect of this collection of Information, Including suggestions for reducing this burden, to Washington Headquarters Services.
Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and
Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503.
A. CONTRACT LINE ITEM NO.
0002
B. EXH PATCH XOX
C. CATEGORY:
TDP
TM
OTHER
X
D. SYSTEM/ITEM
Phenomenological
Research and Analysis
E. CONTRACT/PR NO.
330/0012Z/91
F. CONTRACTOR
SAIC
1. DATA ITEM NO.
A001
s progress, status, and
management report
3. SUBTITLE
Periodic Status Reports
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80227
S. CONTRACT REFERENCE
Para C.6.2, C.6.3.
6. REQUIRING OFFICE
DIA/DT-5A
7. DO 250 REQ
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
BI-MO-
12. DATE OF FIRST SUBMISSION
5 DARC
14.
DISTRIBUTION
b. COPIES
.. ADDRESSEE
Final
Draft
Reg
Repro
DT-5A
1
2
16. REMARKS
Ref block 12: Contractor will provide draft report
3 DARP. Draft will be returned within 5 working
days.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
A002
Technical Report-Study/Services
3. SUBTITLE
Interim Technical Reports
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508
5. CONTRACT REFERENCE
(S.O.W. )
6. REQUIRING OFFICE
DIA/DT-5A
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
4TIME.
12. DATE OF FIRST SUBMISSION
5 DARC
14.
DISTRIBUTION
b. COPIES
Final
Draft
'Repro
2
Reg
2
DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
3. SUBTITLE :
Special Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508
5. CONTRACT REFERENCE
Para C.6.1
6. REQUIRING OFFICE
DIA/DT-5A
7, DO 250 REQ
9.
DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R"
12. DATE OF FIRST SUBMISSION
See block 16
14.
DISTRIBUTION
b. COPIES
.. ADDRESSEE
Final ...
Draft
Reg
Repro
DT-5A
2
4
; DATA ITEM NO. 2. TITLE OF DATA ITEM
A004
3. SUBTITLE
Final Technical Report
4. AUTHORITY (Data Acquisition Document NO.)
DI-MISC-80508
5. CONTRACT REFERENCE
Para C.6.2, C.6.3
(S.O.W. )
6. REQUIRING OFFICE
DIA/DT-5A
14.
DISTRIBUTION
b. COPIES
I. ADDRESSEE
»Final
Reg
Repro
DT-5A.
6
15. TOTAL
2
6
J. DATE
23 JAN 91
DD Form 1423, APRxgg
1131/122
Previous editions are obsolete,
Page
of
Pages
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000450007-3
ENCLOSURE 9
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17.2PRICE: GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. ESTIMATED
URA TOTAL PRICE
7. DO 250 REQ
DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
"See block 16
C. APP CODE
* A
11. AS OF DATE
0
13. DATE OF SUBSEQUENT
SUBMISSION
16. REMARKS
Ref block 12: Contents of this report will.
encompass A004 plus any remaining contract_period.
Contractor will provide draft report 5 DARP .!
Draft will be returned within 7 working days
H. DATE
7 JAN. 91
1. APPROVED BY
DMO
1
2
&. APP CODE
11. AS OF DATE :
0
13. DATE OF SUBSEQUENT
SUBMISSION
16. REMARKS
Ref Block 12: Contractor will provide draft report
5 DARP. Draft will be returned within 7 working
days.
15. TOTAL
2.
16. REMARKS
Ref block 12: COTR will advise contractor on
specific date for this Congressional support item.
Estimated date is 1 May 1991.
15. TOTAL
2
4
L. APP CODE
11. AS OF DATE
0
13. DATE OF SUBSEQUENT
SUBMISSION
DT-5A
a. ADDRESSEE
11. AS OF DATE
0
(S.O.W. )
8. APP CODE
A
13. DATE OF SUBSEQUENT
SUBMISSION
15. TOTAL
Para C. 6.2, C.6.3., C.6.5
(S.O.W.)

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.