UPON REN VAL OF ENCLOSURES
Approved For Release 2000/08/08 : CIA-RDP96-00789R093000440001-9MES UNCLASSIFIED
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
4
1
2. AMENDMENT/MODIFICATION NO.
P00002
3. EFFECTIVE DATE
07/17/92
4. REQUISITION/PURCHASE REQ. NO.
330/025Z/92
5. PROJECT NO. (if applicable)
CODE
S0514A
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
SCIENCE APPLICATIONS
10260 CAMPUS POINT DRIVE
INTERNATIONAL CORP
SAN DIEGO CA 92121-
Vendor ID: 00002520
(X)
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
MDA908-91-C-0037
10B. DATED (SEE ITEM 13)
02/01/91
CODE
52302
FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Is extended,
is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer
submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or
letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
SEE ATTACHED
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
(x)
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
X
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FAR 43.103(a)
.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT:
Contractor
is not,
X
is required to sign this document and return
1
copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this modification is to extend the work and services for CLINs 0001 and 0002 of
contract MDA908-91-C-0037. Accordingly contract MDA908-91-C-0037 is modified as shown on page
2, 3, and 4 of this modification.
SG1J
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A, NAME AND TITLE OF SIGNER (Type or print)
C. DIANE ARCHER
VICE PRESIDENT.
MANAGER OF CONTRACTS
15B. CONTRACTOR/OFFEROR
C. Diane Archer
15C. DATE SIGNED
7/23/92
16B. UN
BY
(Signature of person authorized to sign)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
Approved For Rele Of(2+/08 : CIA"BP 96-60789R00800 04406ORE)
(48 CFA) 53.243
THIS DOCUMENT BECOMES UNCLASSIFIED
16C. DATE SIGNED
7/23/97
6. ISSUED BY
CODE
HHQ402
SG1J
Virginia Contracting Activity
P.O. Box 46563
Washington, D.C. 20050-6563
S12(202) 373-8388
7. ADMINISTERED BY (If other than item 6)
DCMAO SAN DIEGO
7675 DAGGET STREET
SUITE 200-300
SAN DIEGO, CA 92111-2241
x
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
SGFOIA2
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
Next 2 Page(s) In Document Exempt
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
MDA908-91-C-0037
MOD P00002
ATTACHMENT 2
3 July 1992
Page 1 of 5
SECRET
STATEMENT OF WORK
FOR
PHENOMENOLOGICAL RESEARCH AND ANALYSIS
1.0
(S/NF) PURPOSE: The purpose of this effort is to conduct research and
perform select analyses of anomalous phenomena.
2.0 (U) BACKGROUND:
2.1 (C) Phenomenological research and analysis as intended by this
contract refers to anomalous phenomena associated with human abilities.
Investigations in this area have sometimes been referred to as Remote
Viewing (RV), Extrasensory Perception (ESP), and recently Anomalous
Cognition (AC) or Anomalous Phenomena (AP). Foreign researchers have also
used the term psychoenergetics to describe aspects of these areas.
SG1B
2.2 (S/NF) Over the past sixteen years DIA has followed the field of
psychoenergetics for two basic reasons:
2.4 (S/NF) In 1983 a report with project findings was sent to
congressional intelligence and appropriation committees.
The report
affirmed the existence of remote viewing phenomenon and recommended that
additional research for quantifying and developing remote viewing as an
intelligence collection tool be pursued. This recommendation was endorsed
by a special Science Panel that met to review the project findings. This
panel also affirmed that the contractual research was scientifically sound
and urged that basic and applied research in psychoenergetics be continued,
its scope expanded, and that other laboratories be involved.
..... . ... . ...
SECRET/NOFORN
Classified By: DIA/DT
Declassify On: QADR
Enclosure 3
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
-
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
MDA908-91-C-0037
MOD P00002
ATTACHMENT 2
3 July 1992
Page 2 of 5
0
SECRET
2.5
(S/NF)
The first opportunity to expand this research scope
occurred in 1985. The Department of the Army's Surgeon General Office for
Research and Development (DASGRD) initiated a five year research and
development program. The SGRD program centered on two main aspects: basic
anomalous phenomena understanding, and applications-oriented research. DIA
established close ties with this R/D effort to ensure that applications
research would be adequately pursued.
2.6 (S/NF) In 1987, it became apparent that SGRD funding might not be
available to carry through to the end of the five year period. Consequently,
additional funding was sought by DIA and acquired through funding transfer
action by the House Appropriations Committee (HAC). This funding was
provided to DIA; MIPR action to the SGRD contract was the most expeditious
method of allocating this funding.
2.7
(S/NF)
Results of this effort yielded several findings of
breakthrough potential.
Subsequently, follow on research support was
provided to DIA by Congressional action for FY91; DIA was identified as the
executive agent due to long-standing knowledge and expertise in this area.
Both R&D and O/M funds were allocated for continuing basic and applied
research, for applied investigation and for assisting in assessment of
relevant foreign research.
Additional funds were also provided by
congressional action in FY92 to continue this effort and to start new
research.
3.0 (S/NF) OBJECTIVE: The objective of this contract is to continue the
most promising basic and applied research in this area that resulted from
the FY 1991 effort. It also includes follow-on to exploratory work in order
to demonstrate statistical significance and identify underlying parameters.
4.0 (S/NF) SCOPE: Basic research, applied research and threat assessments
will be accomplished for this phenomenological area.
5.0 (S/NF) TECHNICAL/OTHER CONSIDERATIONS:
5.1
(S/NF) All research activities and findings resulting from
previous programs in psychoenergetics shall be brought to bear on this
effort. In addition, expertise in multidisciplinary areas throughout SAIC
shall be made available as consultants or for special support as required.
5.2 (U) Specialized support, if not available at the contractor, can
be obtained via consultant or subcontract efforts with prior approval by the
COTR. Every effort should be made to insure such support is from the
recognized experts in the field. Some of the specific tasks in section 6.0
can be performed in unclassified facilities.
5.3 (S/NF) This effort will utilize a technical review group (e.g., a
Scientific Oversight Committee, a Human Use Review Panel and a Policy
Board) that was established in the previous effort.
SECRET/NOFORN
2
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
MDA908-91-C-0037
MOD P00002
ATTACHMENT
2
3 July 1992
Page 3 of 5
SECRET
5.4 (S/NF) Some of the experiments/investigations required to fulfill
this contract may require participation of select government personnel. All
such investigations will be fully planned and coordinated with the COTR and
will be under the purviews of the SOC and the Human Use Review Committee.
5.5 (U) Should unforseen schedule of other issues arise concerning
any of the specific tasks identified in section 6.0, the COIR will be given
immediate notice. If necessary, adjustments to priorities and schedules can
be approved by the COIR if there is no cost or other impact on the over-all
program.
The CIR will also review/approve all anticipated research
protocols.
5.6
(U) All items in sections 6.0 and 7.0 will be funded from R&D
funding provided by this contract, and shall be expended NUT 18 months after
contract award.
Accounting procedures to clearly identify the R&D
expenditures shall be implemented by the contractor.
5.7 (U) Terms of reference and additional task details are on file by
the CIR and will be provided to the contractor to insure adequate task
understanding. This material is contained in DIA publication DT-S-1007-S,
29 NOV 1990.
6.0 (S/NF) SPECIFIC TASKS:
6.1 (U) Basic Research:
6.1.1 (U) Biophysical Measurements (Follow-on to SOW 6.3.1 in
PR 330/012Z/91) :
6.1.1.1 (S/NF) Determine how magnetoencephalograph (MG)
measurements correlate with counterpart electroencephalograph (EEG) data.
This effort will assist in simplifying over all brain wave measurement
activity, will form the initial phases of the larger data base required for
establishing statistical significance, and will assist in screening/
selection.
6.1.1.2
(C)
Perform refined MEG data analysis for
individuals involved in the previous effort for the purpose of isolating
neurophysical parameters that correlate with anomalous performances. This
analysis will use new/improved statistical procedures not available in
previous efforts.
6.2 (U) Data Patterns/Correlations (Follow-on to SOW 6.3.2 of
PR 330/012Z/91) :
6.2.1
(C)
Extend analysis of sender/no sender analyses to
include new statistical evaluation methods involving artificial intelligence
procedures for high performance candidates identified during the previous
effort. Develop implications regarding target-individual match.
SECRET/NOFORN
3
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
MDA908-91-C-0037
MOD P00002
ATTACHMENT 2
3 July 1992
Page 4 of 5
SECRET
6.2.2
(U)
Examine all relevant MEG/EEG data and worldwide
anomalous cognition research to identify performance testing/patterns and to
help isolate key physical/psychological/biophysical parameters.
6.3 (U) Applied Research (Follow-on to SOW 6.2.3.3 in PR 330/012Z/91) :
6.3.1
(S/NF)
Conduct long distance anomalous communication
experiments that involve leading candidates identified in previous research.
The key variable will be location, and will involve controlled sites
selected by the COIR.
6.4 (U) Theoretical Issues (Follow-on to SOW 6.2.5 in PR 330/012Z/91) :
6.4.1
(U)
Perform anomalous phenomena experiments in the
presence of select sensitive instrumentation that may help identify
underlying physical parameters.
Pilot work should include an off-the-shelf
Mossbaur device.
6.4.2
(U)
Identify physical mechanism models for anomalous
cognition and develop protocols for testable experiments using select
individuals.
6.5
(U) Research Methodology (Follow-on to SOW 6.4 of PR 330/012Z/91) :
6.5.1
(U)
Provide appropriate research methodology support to
include reviews/approvals by the established Scientific Oversight Committee,
the Policy Board and the Human Use Review Panel for the follow-on activity.
6.5.2
(S/NF)
Provide appropriate management support and
appropriate project research support activity to include document
preparation, administration, and all project associated travel for
contractor personnel, consultants, and other experts. This task includes
research methodology assessment of related worldwide activity to search for
new scientifically-sound approaches.
Select conference attendence or
sponsorship may also be required to identify new methodologies.
7.0 (U) QUICK REACTION CAPABILITY (ORC): The contractor will maintain a
quick response capability and be prepared to respond in less than 24 hours
to problems or unexpected demands for brief technical papers that may be
developed during the term of this project.
SECRET/NOFORN
4
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
1
MDA908-91-C-0037
MOD P00002
ATTACHMENT 2
3 July 1992
Page 5 of 5
SECRET
8.0 (0)
ALLOCATION OF EFFORT: The level of effort to be applied to each
basic task category is shown in the following paragraphs.
8.1 (U) R & D:
Basic Task No.
Allocation of Effort/ & Funding (R&D)
6.1
30
6.2
20
6.3
10
6.4
10
6.5
25
7.0
5
.
SECRET/NOFORN
5
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
·
Approved For Release 2000/08/08: CIA-RDP96-0073920030004400018
CONTRATTI JATA REQUIREMENTS LIST
OMB No. 0704-0188
Public reporting burden for this collection . if information is estimated to average 440 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this
burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington
Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send
completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0002
B. EXHIBIT
B
C. CATEGORY:
TOP
TM
OTHER
X
D. SYSTEM/ITEM Phenomenological |E. CONTRACT/PR NO.
Research and Analysis
330/025Z/92
F. CONTRACTOR
SAIC
1. DATA ITEM NO. 2. TITLE OF DATA ITEM Contractor's progress,
B001
status and management report
3. SUBTITLE
Periodic Status Reports
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80227
5. CONTRACT REFERENCE
C.6.1, C.6.2, C.6.3, C.6.4
6. REQUIRING OFFICE
DIA/ODT-S
7. DD 250 REQ
9.
DIST STATEMENT
REQUIRED
10. FREQUENCY
BI-MO
12. DATE OF FIRST SUBMISSION
5 DARC
1. APP CODE
A
11. AS OF DATE
0
13. DATE OF SUBSEQUENT
SUBMISSION
16. REMARKS
Ref Block 12:
Contractor will provide draft report
5 DARP. Draft will be returned within 7 working days.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
B002
Technical Report-Study/Services
3. SUBTITLE
Interim Technical Reports
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508
5. CONTRACT REFERENCE (S.O.W. )
C.6.1, C.6.2, C.6.3, C.6.4
6. REQUIRING OFFICE
DIA/ODT-S
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
4TIME.
12. DATE OF FIRST SUBMISSION
5 DARC
14.
DISTRIBUTION
b. COPIES
.. ADDRESSEE
Final
Draft
Reg
Repro
ODT-S
2
2
15. TOTAL
-
212
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
B003
3. SUBTITLE
Final Technical Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508
(S.O.W.)
5. CONTRACT REFERENCE
C.6.1, C.6.2, C.6.3, C.6,4
6. REQUIRING OFFICE
DIA/ODT-S
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
See block 16
11. AS OF DATE
0
13. DATE OF SUBSEQUENT
SUBMISSION
ODT-S
2
6
15. TOTAL
2
6
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
B004
3. SUBTITLE
Special Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508
5. CONTRACT REFERENCE
SOW Para C.6.1
6. REQUIRING OFFICE
DIA/ODT-S
7. DD 250 REQ
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
5TIME
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14.
DISTRIBUTION
b. COPIES
: :
a. ADDRESSEE
Final
Draft
Reg
Repro
2
4
16. REMARKS
Ref Block 12: COR will advise contractor on
specific date for this congressional support item.
SG1J
15. TOTAL
2
4
J. DATE
24 Jun 92
001 0
1
of
1
Pages
Enclosure 9
·
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
SG1J
DD Form 1423. JUNchoveu For Release 2000/68/0
1161/183
H. DATE
10 FEB 92.
Previous canyons ure vosvit,
14.
DISTRIBUTION
b. COPIES
a. ADDRESSEE
Final
Draft
Reg
Repro
ODT-S
1
2
DPP-2B
1
8. APP CODE
A
11. AS OF DATE
0
13. DATE OF SUBSEQUENT
SUBMISSION
16. REMARKS
Ref Block 12: Contractor will provide draft report
5 DARP. Draft will be returned within 7 working days.
16. REMARKS
Ref Block 12: Contents of this report will
encompass A002 plus any remaining contract period.
Contractor will provide draft report 5 DARP. Draft
will be returned within 7 working days.
14.
DISTRIBUTION
·. ADDRESSEE
Final
Draft
Reg
Repro
8. APP CODE
11. AS OF DATE
0
13. DATE OF SUBSEQUENT
SUBMISSION
ODT-S
b. COPIES
6. APP CODE
A
3
15. TOTAL
(S.O.W.)
Approved For Release 2060/fog ARASQUA5 :- 56/GRBP500044608433
(See DoD 5010.12-M for detailed instructions.)
-9
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TOP - Technical Data
Package; TM - Technical Manual; Other - other category of data, such
as "Provisioning," "Configuration Management", etc.
ttem D. Enter name of system/item being acquired that data will
support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
ttem H. Date CDRL was prepared.
Item 1.
Signature of CDRL approval authority.
Item J. Date CDRL was approved.
ttem 1. See DoD FAR Supplement Subpart 4.71 for proper
numbering.
ttem 2. Enter title as it appears on data acquisition document cited
in Item 4.
Item 3. Enter subtitle of data item for further definition of data
item (optional entry).
Item 4. Enter Data Item Description (DID) number, military
specification number, or military standard number listed in DoD
5010.12-L (AMSDL), or one-time DID number, that defines data
content and format requirements.
ttem 5. Enter reference to tasking in contract that generates
requirement for the data item (e.g., Statement of Work paragraph
number).
ttem 6. Enter technical office responsible for ensuring adequacy of
the data item.
Item 7. Specify requirement for inspection/acceptance of the data
item by the Government.
Item 8. Specify requirement for approval of a draft before
preparation of the final data item.
ttem 9. For technical data, specify requirement for contractor to
mark the appropriate distribution statement on the data (ref. DoDD
5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
ttem 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when
applicable.
ttem 14. Enter addressees and number of draft/final copies to be
delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1
through 15. Examples are: Tailoring of documents cited in Item 4;
Clarification of submittal dates in Items 12 and 13; Explanation of
reproducible copies in Item 14 .; Desired medium for delivery of the
data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the
following groups of effort in developing estimated prices for each
data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential
to the contractor's performance of the primary contracted effort
(production, development, testing, and administration) but which
is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are
those applicable to preparing and assembling the data item in
conformance with Government requirements, and the
administration and other expenses related to reproducing and
delivering such data items to the Government.
b. Group Il. Definition . Data which is essential to the
performance of the primary contracted effort but the contractor
is required to perform additional work to conform to Government
requirements with regard to depth of content, format, frequency
of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are
those incurred over and above the cost of the essential data item
without conforming to Government requirements, and the
administrative and other expenses related to reproducing and
delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must
develop for his internal use in performance of the primary
contracted effort and does not require any substantial change to
conform to Government requirements with regard to depth of
content, format, frequency of submittal, preparation, control, and
quality of the data item.
Estimated Price - Costs to be included under Group Ill are
the administrative and other expenses related to reproducing and
delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the
contractor as part of his normal operating procedures and his
effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be
shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that
portion of the total price which is estimated to be attributable to
the production or development for the Government of that item
of data. These estimated data prices shall be developed only from
those costs which will be incurred as a direct result of the
requirement to supply the data, over and above those costs which
would otherwise be incurred in performance of the contract if no
data were required. The estimated data prices shall not include
any amount for rights in data. The Government's right to use the
data shall be governed by the pertinent provisions of the contract.
DD Form 1423 Reported #Ur Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
DATA ITEM DESCRIPTION
Form Approved
OMB No. 0704-0188
Exp. Date: Jun 30. 1986
1. TITLE
Contractor's Progress, Status and Management Report
2. IDENTIFICATION NUMBER
DI-MGMT-80227
3. DESCRIPTION/PURPOSE
3.1 The Contractor's Progress, Status and Management Report indicates the progress of
work and the status of the program and of the assigned tasks, reports costs, and
informs of existing or potential problem areas.
4. APPROVAL DATE
(YYMMDO)
860905
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
N/SPAWAR
6a. DTIC REQUIRED
66. GIDEP REQUIRED
7. APPLICATION / INTERRELATIONSHIP
7.1 This Data Item Description (DID) contains the format and content preparation
instructions for the data product generated by the specific and discrete task
requirement for this data included in the contract.
7.2
This DID may be applied in any contract and during any program phase.
7.3
This DID supersedes DI-A-2090A, DI-A-3025A, UDI-A-22050B, UDI-A-22052A, UDI-A-23960,
DI-A-30024, and DI-A-30606. (cont. on page 2)
8. APPROVAL LIMITATION
9a. APPLICABLE FORMS
9b. AMSC NUMBER
N3947
10. PREPARATION INSTRUCTIONS
10.1
Contract - This data item is generated by the contract which contains a specific and
discrete work task to develop this data product.
10.2
Format - This report shall be typewritten on standard size (e.g. 8 1/2" by 11") white
paper, and securely stapled. Pages shall be sequentially numbered. All attachments
shall be identified and referenced in the text of the report. The report shall be
prepared in the contractor's format and shall be legible and suitable for
reproduction.
10.3
Content - The report shall include:
a. A front cover sheet which includes the contractor's name and address, the
-
contract number, the nomenclature of the system or program, the date of the
report, the period covered by the report, the title of the report, either the
serial number of the report or the Contract Data Requirements List (CDRL)
· sequence number, the security classification, and the name of the issuing
Government activity;
b.
Description of the progress made against milestones during the reporting period;
Results, positive or negative, obtained related to previously-identified problem
c.
areas, with conclusions and recommendations;
d. Any significant changes to the contractor's organization or method of operation,
to the project management network, or to the milestone chart;
e. - Problem areas affecting technical or scheduling elements, with background and any
recommendations for solutions beyond the scope of the contract;
£.
Problem areas affecting cost elements, with background and any recommendations for
solutions beyond the scope of the contract;
g·
Cost curves showing actual and projected conditions throughout the contract;
h.
Any cost incurred for the reporting period and total contractual expenditures as
of reporting date;
1.
Person-hours expended for the reporting period and cumulatively for the contract;
1. Any trips and significant results; (cont. on page 2)
DO Form 1664, FEB 85
Prewous edition & obsolete.
PAGE
1
OF
2
CAGES
9-1
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
DI-MGMT- 80227
7.
APPLICATION/INTERRELATIONSHIP (Cont'd)
7.4 Paragraphs 10.3.f, 10.3.g, and 10.3.h herein should be tailored on DD Form 1423
· when such cost data is already submitted through a sophisticated cost reporting
system under the contract. .
10.
PREPARATION INSTRUCTIONS (Cont'd)
k.
Record of all significant telephone calls and any commitments made by
telephone;
1.
Summary of Engineering Change Proposal (ECP) status, including identification
of proposed ECPs, approved ECPs, and implemented ECPs;
m.
Contract schedule status;
n.
Plans for activities during the following reporting period;
o.
Name and telephone number of preparer of the report;
P·
Appendixes for any necessary tables, references, photographs, illustrations,
and charts.
*U.S. GOVERNMENT PRINTING OFFICE: 1986-704-037/50176
.
:
-
Page 2 of 2 Pages
9-2
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
AnBraved For Release 2000/9898 SARDAR097898993000440007-
.
Form Approved
OMB No. 0704-0188
2. TITLE
Technical Report - Study/Services
1. IDENTIFICATION NUMBER
DI-MISC-80508
3. DESCRIPTION/PURPOSE
3.1 A technical report provides fully documented results of studies or
analyses performed.
4. APPROVAL DATE
(YYMMDD)
880115
5. OFFICE OF PRIMARY
RESPONSIBILITY (OPR)
G/T2137
X
6a. DTIC
APPLICABLE
6b.GIDEP
APPLICABLE
7. APPLICATION/INTERRELATIONSHIP
7.1 This data item description contains the format and content preparation instructions
for the data product generated by the specific and discrete task requirement as
delineated in the contract.
7.2 This DID supersedes DI-A-5029.
7.3 Defense Technical Information Center (DTIC), Cameron Station, Alexandria, VA 22314.
8. APPROVAL LIMITATION
9a. APPLICABLE FORMS 9b. AMSC NUMBER
G4291
10. PREPARATION INSTRUCTIONS
10.1
Format.
(a) The report and all attachments shall be typewritten, or
otherwise clearly lettered, and shall be duplicated using non-fading
ink.
(b)
Text shall be prepared on standard letter size paper
(8 1/2" X 11").
(c)
When attachments are included, they shall be fully
identified, referenced in the text, and folded to conform to the size
paper used in the report.
(d) Security classification and distribution markings shall
conform to the requirements of the contract, purchase description and
security requirements checklist, as applicable.
10.2
Content.
(a) Title Page - Identifies the report by providing contract
number, project name or purchase description title, task number, and
reporting period.
(continued on page 2)
11. DISTRIBUTION STATEMENT
DISTRIBUTION STATEMENT A:
Approved for public release; distribution
is unlimited.
Form 1664, JUN 86 (FACSIMILE)
Previous editions are obsolete.
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0.
Page
1 of 2 Pages
-
Approved For Release 2000/08/08 : CIA-RDP96-00789R003000440001-0
DI-MGMT-80508
....
Block 10.
Preparation Instructions (Continued)
(b)
Table of Contents
(c)
Section I - Includes the following:
(1)
Introduction
(2)
Summary - A brief statement of results obtained
from the analytic effort.
(3)
Conclusions and their condensed technical
substantiations.
(d) Section II - A complete and detailed description of the
analytic results which led to the conclusions stated in Section I above.
+
..
Page 2 of