CIA STARGATE release
CIA-RDP96-00789R002500230042-4
Opens with: ACTIVITY REPORT FOR NOVEMBER 1993
Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.
1 page, machine transcribed from the CIA’s released scan.
Approved Fordes Chain 2/08 GRDP96-00789R002500230042-4 OLURL 1 TO: PA SG1J FROM: THRU: PAG-TA SUBJ: ACTIVITY REPORT FOR NOVEMBER 1993 DATE: 2 DECEMBER 1993 . 1. (U) The following activities were accomplished by myself during the month of November 1993. - 2. (U) Move to Building 2845: 7 - Conducted office space survey within Building 2845; final office and administrative space selection and assignments completed with PAG-TA personnel. - Cost Estimate for theconstruction upgrading of Room 111 received from Ft. Meade Engineers. Cost Estimate packet hand carried to Mr. DAL-2A, for processing. - Face-to-face meeting with SPAC-2 (Physical Security) , to discuss requirements necessary to upgrade Room 111 to a SCIF-level facility. Provided with a courtesy copy of cost estimate packet. in turn, provided me with copies of the new DCID 1/21 regulation as well as the updated supplement to DCID 1/21 covering the physical security standards for SCIFs and the latest version of the Fixed Facility Check List. 3. (S/NF) Projects: Conducted 5 operational projects involving ten sessions. - Included a face-to-face meeting with costumer which involved 4 of the aforementioned projects. 4. (U) Foreign Assessments: day - Attended a two'conference on Non-Lethal Warfare at the Johns Hopkins Applied Physics Lab 16-17 November 1993. - Ongoing evaluation of material collected by former branch chief. 5. (U) Training: Participated and completed a "Q-Sort" personality examination as part of the SAIC R&D portion of our mission. 6. (U) Other: On Annual Leave from 22 to 26 November 1993. CLASSIFIED BY Multiple Sources: DECLASSIFY ON OADR Approved 1 PT DEGRUPO/0608 : NACHBP96-00789R002500230042-4 Enclosure 2 .