CIA STARGATE release
CIA-RDP96-00789R000400370001-7
Opens with: Session Summary
Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.
10 pages, machine transcribed from the CIA’s released scan.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7 Session Summary Viewer 095 19 July 88 Start: 1345 End: 1430 21 July 88 Start: 13.20 End: 1500 The site is flat, open, wide land with conduits/ channels running across it that are part above ground part below ground. At least one of the conduits terminates at a structure. The conduits are white inside and hollowed out. There are wires and metal things inside. On one of the conduits metal plates are inserted vertically. These are 21/2 to 3 feet wide and 1/4 -1/2 inches thick. They are pressed down into place and replaced at times. In front of one of the plates is a hollowed out area that leads back to a structure. The entire site has associated with it the idea of being partially above ground and partially underground. Associated with the site is the concepts of laid out, lines of energy and the concept of range. There is also something at the site that is black, ball -shaped and very, very dense. It's diameter is 4-5 inches. Heavy duty transportation has access to the site ( "like" a railhead of a major, large truck carrying road) . There are two major "purpose" concepts associated with the site. Since I was fluid in time and space during the sessions I could not determine whether each of these is associated with different parts of the site or the same site at different times in the future. The first of these purpose concepts is the idea of something large and stationary being tested. Associated with this is a large, massive room filled with equipment. The room has a dense, concentrated source of power/ contained energy in it. The second of these purpose concepts is the idea of the construction, assembly and testing of complex, heavy systems. The assembly involves integration and aiming and the result is system completion. The integration process is very complex and meticulous. Each system must be done one by one. Things are carefully put into place and tested. Associated with the idea of 'testing' are the concepts additions, military, integration, location and lay-out. This purpose gave me an AOL of mobile nuclear system which was caused by the concepts complexity, system, density, mass, length, and roll-out. Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7 Viewer 095 19 July 88 1345 PI- fired. AV - 5-2 D AI EI T I Ad AOUS [energy ] Gowns opturned dirt . flat. Aoals Will'indistra Silver vertical mehlplates # blue len. . lait out. livsofaring . range. 7 channels. Conduits. - . ANUBI center 01 a golf ball. Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7 .. Gallshaped denne. 4-5"dia black,
2 Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7 5-2 D AI EI T 2 AOL AOL/S. Emetrolplates . -- inserted Vertical 21/2-3ft wide thin 1/2- 1/2'' 1 hollow area. presseddown into place. HUUBK forget. AULAS liker pipe. replaced. [used one] Structur 84/2 hollow new leads back to structure. AO ABK charich Structure. AU-BECK live on Ac fiter. Aoc sk. Streakpete . Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
.5-6 Approved For Release 2000/08/08 +CIA-RDP96-00789R000400370001-7 Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
095 Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001788 1320 PI - AV - Nous 5-2 D AI EI AT I AOL SG1A Flut wire brown. . . 54/2 channels are raised above ground but go below sur fa insidechannels me white holland out Things inside Metal wire. Hou/s pipe. Aow/S. electrical. boxes. 54 1/2 String felling of things both above gards below ground. ·black/ / gray toprimnes Structure AOL BI Railroad tracks. 54h feeling that herog daty transportation his wiress to the site [ like a milhead or major lage truck carrying road ] Strip. AUc/S Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7 40/paracet/
2 5-2 Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7 D AI EI T I AOC AOL/S - festing. Aou/s >Strategic Hoursk. friabile sudary 5 Finire] futures Construction assembly grup. grens 1 Lemy · Systems. Complex coyletin. asmany integration. 54 1/2 ·Integration is very complex + meticulous needs to be done One by one. Things out carefully into place + tested. Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
ろ Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7 testing objects enportions. auditing. testing. attributs. ementsing 1. testing. Subjects emotions integration. military Testing - topics emputing Martin ling- out. Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
5-6 Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7 4 5-2 D AZ EI AOL AOL/S [location] operational 2 systems Rough dase. ALL Bruk Systeme [ power 1/2 mile Up] power .. dense concentrated power. . 1 Massive woon angetan lage equipe. AOUBE Hierning Contained everyy 1 Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
5 Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7 Kuchen mobilesyster prin enantino: complexity s System. density collant . Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
SECRET/NOFORN - HANDLE VIA SKEET CHANNELS ONLY
PROJECT SUN STREAK (U)
WARNING NOTICE:
INTELLIGENCE SOURCES AND METHODS INVOLVED
PROJECT NUMBER :
8809
SESSION NUMBER:
4 & 5
DATE OF SESSION:
19 & 21 JUL 88
DATE OF REPORT:
27 JUL 88
START:
19:1345
21:1320
END :
19:1430
21: 1500
SG1A
METHODOLOGY:
CRV
VIEWER IDENTIFIER:
095
1. (S/NF/SK)
MISSION:
Determine the function of the structure
SG1A
2. (S/NF/SK)
VIEWER TASKING:
19 July:
Initial
introduced cue of
[energy] and on 21 July:
initial cue of
The site was explored
in Stage 6 (spatially and temporally) in an attempt to pick up those
things pertinent to the EEI.
3. (S/NF/SK) COMMENTS:
A veritable 'basket' of percepts were
095
collected, any or none of which are relative to the task at hand.
will be tasked to model the site, for increased contact, in a
subsequent session. The 19 July session did not go well at all; 095's
PI ("tired") could not be worked around.
4.
(S/NF/SK)
EVALUATION:
E
4
SG1J
SECRET/NOFORN - SKEET CHANNELS ONLY
CLASSIFIED BY:
DIA-DT
DECLASSIFY
:
OADR
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7