Project Interloper

CIA STARGATE release

CIA-RDP96-00789R000400370001-7

Opens with: Session Summary

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

10 pages, machine transcribed from the CIA’s released scan.

Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
Session Summary
Viewer 095
19 July 88
Start: 1345
End:
1430
21 July 88
Start:
13.20
End:
1500
The site is flat, open, wide land with conduits/ channels
running across it that are part above ground part below ground.
At least one of the conduits terminates at a structure.
The
conduits are white inside and hollowed out.
There are wires and
metal things inside.
On one of the conduits metal plates are
inserted vertically. These are 21/2 to 3 feet wide and 1/4 -1/2
inches thick.
They are pressed down into place and replaced at
times.
In front of one of the plates is a hollowed out area that
leads back to a structure.
The entire site has associated with it the idea of being
partially above ground and partially underground.
Associated
with the site is the concepts of laid out, lines of energy and
the concept of range. There is also something at the site that
is black, ball -shaped and very, very dense.
It's diameter is 4-5
inches.
Heavy duty transportation has access to the site ( "like" a
railhead of a major, large truck carrying road) .
There are two major "purpose" concepts associated with the
site.
Since I was fluid in time and space during the sessions
I
could not determine whether each of these is associated with
different parts of the site or the same site at different times
in the future.
The first of these purpose concepts is the idea of
something large and stationary being tested.
Associated with
this is a large, massive room filled with equipment.
The room
has a dense, concentrated source of power/ contained energy in
it.
The second of these purpose concepts is the idea of the
construction, assembly and testing of complex, heavy systems.
The assembly involves integration and aiming and the result is
system completion.
The integration process is very complex and
meticulous.
Each system must be done one by one.
Things are
carefully put into place and tested. Associated with the idea of
'testing' are the concepts additions, military, integration,
location and lay-out. This purpose gave me an AOL of mobile
nuclear system which was caused by the concepts complexity,
system, density, mass, length, and roll-out.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
Viewer 095
19 July 88
1345
PI- fired.
AV -
5-2
D
AI
EI
T
I
Ad
AOUS
[energy ]
Gowns
opturned dirt
.
flat.
Aoals
Will'indistra
Silver
vertical mehlplates
#
blue
len.
.
lait out.
livsofaring
.
range.
7
channels.
Conduits.
-
.
ANUBI
center
01 a golf ball.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
..
Gallshaped
denne.
4-5"dia
black,
2
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
5-2
D
AI
EI
T
2
AOL
AOL/S.
Emetrolplates
.
--
inserted
Vertical
21/2-3ft wide
thin 1/2- 1/2''
1
hollow area.
presseddown
into place.
HUUBK
forget.
AULAS
liker
pipe.
replaced.
[used one]
Structur
84/2
hollow new leads back to structure.
AO ABK
charich
Structure.
AU-BECK
live on
Ac fiter.
Aoc sk.
Streakpete .
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
.5-6
Approved For Release 2000/08/08 +CIA-RDP96-00789R000400370001-7
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
095
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001788
1320
PI -
AV -
Nous
5-2
D
AI
EI
AT
I
AOL
SG1A
Flut
wire
brown.
.
.
54/2 channels are raised above ground but go below sur fa
insidechannels
me white
holland
out
Things
inside
Metal
wire.
Hou/s
pipe.
Aow/S.
electrical.
boxes.
54 1/2
String felling of things both above gards
below ground.
·black/
/ gray
toprimnes
Structure
AOL BI
Railroad tracks.
54h feeling that herog daty transportation his
wiress to the site [ like a milhead or major
lage truck carrying road ]
Strip.
AUc/S
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7 40/paracet/
2
5-2
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
D
AI
EI
T
I
AOC AOL/S
-
festing.
Aou/s
>Strategic
Hoursk.
friabile sudary
5
Finire]
futures
Construction
assembly
grup.
grens
1
Lemy
·
Systems.
Complex
coyletin.
asmany
integration.
54 1/2
·Integration is very complex + meticulous needs to be done
One by one. Things out carefully into place + tested.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
ろ
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
testing
objects
enportions.
auditing.
testing.
attributs.
ementsing
1.
testing.
Subjects
emotions
integration.
military
Testing
- topics
emputing
Martin
ling- out.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
5-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
4
5-2
D
AZ
EI
AOL
AOL/S
[location]
operational
2 systems
Rough
dase.
ALL Bruk
Systeme
[ power 1/2 mile Up]
power
..
dense
concentrated
power.
. 1
Massive
woon
angetan
lage
equipe.
AOUBE
Hierning
Contained
everyy
1
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
5
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
Kuchen mobilesyster
prin enantino:
complexity
s System.
density
collant .
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7
SECRET/NOFORN - HANDLE VIA SKEET CHANNELS ONLY
PROJECT SUN STREAK (U)
WARNING NOTICE:
INTELLIGENCE SOURCES AND METHODS INVOLVED
PROJECT NUMBER :
8809
SESSION NUMBER:
4 & 5
DATE OF SESSION:
19 & 21 JUL 88
DATE OF REPORT:
27 JUL 88
START:
19:1345
21:1320
END :
19:1430
21: 1500
SG1A
METHODOLOGY:
CRV
VIEWER IDENTIFIER:
095
1. (S/NF/SK)
MISSION:
Determine the function of the structure
SG1A
2. (S/NF/SK)
VIEWER TASKING:
19 July:
Initial
introduced cue of
[energy] and on 21 July:
initial cue of
The site was explored
in Stage 6 (spatially and temporally) in an attempt to pick up those
things pertinent to the EEI.
3. (S/NF/SK) COMMENTS:
A veritable 'basket' of percepts were
095
collected, any or none of which are relative to the task at hand.
will be tasked to model the site, for increased contact, in a
subsequent session. The 19 July session did not go well at all; 095's
PI ("tired") could not be worked around.
4.
(S/NF/SK)
EVALUATION:
E
4
SG1J
SECRET/NOFORN - SKEET CHANNELS ONLY
CLASSIFIED BY:
DIA-DT
DECLASSIFY
:
OADR
Approved For Release 2000/08/08 : CIA-RDP96-00789R000400370001-7

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.