Project Interloper

CIA STARGATE release

CIA-RDP96-00789R000300520001-1

Opens with: PROJECT SUN STREAK (U)

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

22 pages, machine transcribed from the CIA’s released scan.

4.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
2
SECRET/NOFORN - SKEET CHANNELS ONLY
PROJECT SUN STREAK (U)
CRV SESSION PROCEDURES REPORT
0855
1017
WARNING NOTICE:
INTELLIGENCE SOURCES AND METHODS
INVOLVED
CONTROL NUMBER: 8708
NICKNAME: None
DATE OF SESSION:
5 Jun 87
TARGET COUNTRY:
UNK
REFERENCES:
None
SESSION NUMBER: 01
DATE OF REPORT: 8 Jun 87
MISSION STATUS:
Continuing
TECHNIQUE UTILIZED: CRV
SOURCE
IDENTIFIER:
003
....
SG1A
1.
(S/NF/SK)
TASKING:
The Monitor was provided a sheet of bond
paper on
which the following tasking
had been prepared:
"Proiect
8708.
SG1A
Additionally, Source was
provided the encrypted coordinates listed above, as per Coordinate
Remote Viewing (CRV) protocols, to preclude even inadvertent
geographic cuing.
No other descriptive data or cuing except that
stated above was provided to Source prior to this session.
2.
(S/NF/SK)
SESSION:
There were not reportable incidents or
anomalies which may have affected or influenced that data provided by
Source in this report.
3.
(S/NF/SK)
SUMMARY:
(S/NF/SK)
Source required only one series of IABs before
progressing into Stage III sketching and Stage IV/VI matrices.
The
initial IABs were perceived by Source as a, "solid ... structure".
Thé
subsequent Stage II word list further described the "structure" in
terms of various colors and, "dusty, gritty. .. bumpy ... thick",
and
"dense" all of which may have represented early impressions of a
granular surface on the "packing box" or perhaps the existence of a
SECRET /NOFORY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
0
:
2
052
5
0
SG1A
.
. Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
4
/NOFORN - SKEET CHANNELS ONLY
reinforcing
(thick, dense) aspect of this box.
Sketches at this
stage were essentially geometric shapes with a predominantly square
or rectangular motif which also closely approximates the general
gestalt of the object in the photograph.
b.
(S/NF/SK)
Source's initial Stage VI matrix described a,
"cement structure, thick ... quadrangular ... flat ... difficult
access ... protective ... ", with an AOL of, "like a bunker".
This may
have been a perception of the facility housing the object in the
photograph.
Source was told that the actual structure was of little
interest to the actual intelligence question but something in the
structure was of greater interest.
With this cuing, Source began
describing an, "object" at this site as, Smooth, shiny, cylindricalį
heavy. . .
The object continued to draw Source's attention with
further descriptive words and phrases, (S4 1/2 concepts) such as,
" (a) plate, ring, inside (something) , minute, intricate, complex ,
high tensile strength, integral, interlocking, dense, locking, an
"einsatzstellen (position of readiness) " ... it has a dormant mode but
can be put into operational status - "Stand-by mode" - (it is) to be
actually put into operation upon command".
Source then drew an
extremely detailed sketch of the object He was perceiving which
resembled a cylindrical object with several stages or components.
Each stage of this object was labeled by Source beginning at the top
and progressing down through the five distinct components sketched by
Him. These stages are as follow:
"a. locking mechanism
b. control
mechanism
c. bulk material
d. separator
e. (more) bulk material.
Source then finished this sketch phase with an S4 1/2-description of,
" (a) sense (that) it's a weapon or at least weapon associated".
(SEE
PAGES 5-7 of SOURCE NOTES) .
1
L
V
C.
(S/NF/SK)
Source moved forward in the session but continued
to focus His attention on the object by describing in greater detail
its various components, i.e. ,
" (Some of the components) are different
but the same.
The two bulk materials must be kept separate.
When
( they are) together a third thing happens and they could lose control
of the it.
(It's)like they catalyze or combine into volatile
things, "explode" or become extremely corrosive".
This narrative was
followed by single word discriptives of, "flash, burn, bright ... very
hot, instantaneous ... expanding, bursting, intense. .. "
and an AOL of
D
SADM, (Special Ammunition and Demolitions Material) a short title
referencing man-portable low yield nuclear devices to be utilized by
Special Forces units on sensitive targeting in time of war or
imminence of hostility.
(SEE PAGE 10 OF SOURCE NOTES) .
This
reinforcement of the earlier concept of a, "weapon or weapon
associated (object) ".
d.
(S/NF/SK)
Source was unable to "structure out" the concept
of a weapon and continued His Stage VI matrix with a long series of
S4 1/2 comments which have been combined as follows:
"Object is not
"00""" /NOFORN
SKEE
EET CHANNELS ONLY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
` Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
.
SECRET/NOFORN - SKEET CHANNELS ONLY
meant to be retained within (the) structure when (it is) time to be
used.
Storage, testing, protection, "hiding" (are all purposes)
of
the structure .... Object is too big and heavy for one or a few people
to lift and transport (it) .
Handling equipment is necessary ... One
end has projections perpendicular to , (the) main cylinder axis of (the
object) .
Internal components can be removed leaving (the) object as
(a) hollow shell ... Modularity.
Certain basic configuration (is)
necessary to get it to work but certain elements or "packages" can be
substituted to perform different functions.
These (elements) go in
first ... (A) hole in the middle ... Same approximate consistency and
rough shape of (a) fine grained grinding wheel . .
Source
supplemented His S4 1/2 comments with several more single word
descriptives such as, "hand, heavy, hot, fixed ... panels, access,
and another AOL of, "like a
"clean
electronic parts, intricate. ... "
room (nuclear or high tech assembly area) ".
Before terminating the
session, Source briefly accessed an individual He perceived as
working in the area whom He described as a man who gave the
impression, "like he routinely works with (the) object but doesn't
relish his involvement directly with it".
This individual worked
with, "non-conductive alloy (tools) " performing functions such as,
"adjusting, maintaining, fine tuning, stabilizing ... ".
When the
object is removed from this facility it is done so in, "covered
trucks ... to a place out in (the) field.
(The)
object is attached to
something else ... cables, controls, shielding ... ".
e.
(S/NF/SK)
Source completely an "end of session" summary
prior to termination which contained essentially all of the above
cited information in narrative form.
A follow up, non-session
summary completed independently by Source re-affirmed His previous
impressions with the notable exception that the Source perceived the
impression that the object, whatever it may be, is being readied for
operational use in the near future and people associated with this
object are feeling a considerable amount of anxiety and pressure to
the make certain that it is operational as soon as practical, "to
accomplish some immediately expedient policy or result".
4.
(S/NF/SK)
OPS FEEDBACK:
Source had a strong drive during the
session concerning His impression that the object was weapon related
in some way.
Source is, however, a well qualified and experienced
operative and believes that He was in control of the drive and
sincerely believes that the object is, indeed, probably a weapon or
Weapon component.
It cannot be determined from the data known about
the actual target whether Source's information is accurate, however,
the post-session independent summary did bear a somewhat dire warning
which may require another session to objectify and/or clarify.
SECRET /NOFORN
SKEF"
ET CHANNELS ONLY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
SG1J
-
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
Summary, 8 June 1987
Site involves a block-shaped structure, perhaps reinforced,
within which is a long, tapered, round, cylindrical object
supported on rectangular supports.
Object suggests AOL of
missile or rocket.
It is designed to be removed from the
structure, transported to a location out in the open, assembled
with some other component, then used -- perhaps launched. Various
optional configurations allow it to be employed in a fairly wide
number of roles or applications; general feeling is that the
object is some form of weapon.
Further impression is that it may
be put into operation in the near future; in fact, those that
employ it are feeling a considerable amount of anxiety and
pressure to get the thing operational as soon as practical, to
accomplish some immediately expedient policy or result.
POST - SESSION
INDEPENDENT SUMMARY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
SG1A
Paul
5 Jun 87
Ft. Meade, +1
Gene
0855
A. Que
B
law
A2 .Monis
mound
Solis
B. adults
A.
up any
here
dans
501,0
B. Stucture
52
brown
Whit
sives
blanke
red
Sworth
yellow
bright
dusty
Twitty
Approved For Release 2006/08/08 : CIA-RDP96-00789R000300520001-1
2
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
hand
Smooth
rush
Cool
bumpy
Open
Solid
will
tay
dans
think
A2
BK
infarst slight
approbation
-
1
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
3
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
1
1
L
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
. .
52
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
A1
4
£1
T
1
Aux
Als
event
people
cit in
movement
Stundas
Cement
thick
Quadrangular
AI BK
pension
light
Squarish
flat
Stunter
Se/2 difficult anos
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
.
52
SVJ
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
E1
5
AOL
Als
Open
Ochre
remin
Boulay
City
morning
looking
Spread out
Vehicle
Inside
Stunter
kim
Ausfare
functional
AO LIK
Bunker
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
1
protective
Javain
Sans
bushes
rocky
Degry
: :
52
D
# 2
.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
ET
SVI
T
object
I
POL
6
ALS
Vounder
Smart
Shiny
polished
FOL Ble
stal
Staiwan
hary
Curving
like
brusho
Aluminum
other
metal
fed
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
SVI
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
AI
A02
object
bolts
Circle
plat
ring
Inside
Parts
-
complex
Minute
intricat
machined
9-1/2 high tensile Strength
integral
in tequal
interlocking
dance
turning
locking
formans
Su/2 im einzatz Stalen
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
7
.
52
D
.
SUI
8
Als
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001
54/2 - has "dormant" mode, but can be but i 'to operational
Status - "Stand-by" made- to be actually put into
operation typon command .
Concentric
rings
matching
locking
STE sophisticated technology;
precise fit + tolerances;
high grade materiale
Insall
object
Blocking
mecanism
Control medianisu
-
a
balk material
OJ
separator
Bulk matural
b
Sections
componenti
54/2 Sauce it's a weapon or at least weapon- associates
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
: .
52:
SUI
9
52
Approved For/ Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
2
Als
a :
Lense
granular
Speckled
brownish
parked
b
"Solider
bluish
svagiol
blackish
Stb different but same; two bulk unterids wast he
Kept separate; when together a 3d things happens
and they love wanted of it. Like they catalyse a
Combine inte volatile thing; a "explode" or
become extremely constive .
flash
bum
Ir igut
very
gluesence
very hot
Instantaneous
rapid
expanding
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
SVI
10
52
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
bursting
ALL
Ab
Intense
explos
bomb
AOL BK
SADM
ALL BK
depthchange
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
100
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
AOL SADm
priv emanation?
rounded
metal
intrat
turning
locking
velence
actor
weapon
heavy
materiale
Closely enginemed
moveable
cadas
Chamber
explosive
munitions
Military
Special handling
Safeguarding
Security
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
SUI
11
.
52
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
AZ
F
1
AOL Als
I
nonles
32
world
non
Ersten
BGC
54/2 Object is not meant to be retained w/in Structure
when time to be used. Storage , testing, protection,
"hiding" is purpose of Stucture .
54/2
Objet is too big + heavy for one on a few
people to lift + transport.
Handling equipment ,,
necessary.
Shing
Silverz
syl% me and has projections perpendicular to main cylindvind
axis of object.
Informal components can be removed
leaving object
as konlow shell.
541/2 modularity; certain basic configuration necessary
to get
it to work; but certain elements of
packages ' can be Substituted to perform different
functions.
These go in five
hard
Shaped
hole in middle
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
SVI
12
1
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-140L
A/s
52
542
Same
approximate
Consistent rough shape of fine-grains
grinding wheels
hand
learn
varandas
grainy
Fixed
material
gun
yellow/
real
White
Sworth
Obino
Supporter
-
Space
-4/2 in center of room; other objets, task, equipment
around outside allowing plants of room wound object .
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
52
D
SVI
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
AZ
T
I
Av.
13
Als
Propeller
panels
electionvi
Parts
Inticrate
Clear
MARI
pasar
working
Slighth
5-1/2
like he routinely works ofob jest but doesn't relish
his involved directly with it .
tools
non conductive
allay
Small
precise
adjusting
maintainos
" fine. taming "
Stabilizing
technician
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
'52.
D
A1
SVI
14
Als
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
Object
transformed
transported
assembled
Outile
541/2
Greed truck takes objet from Structure
to place out in
field. Object is attached to something else.
Cables
Shielding
Observing
liveting
Missile
adjusted
Convertis
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
15
1
c
·
Site Approved For Release/2000/08/08 /CIA-RDP96-00789R000300520061-1 du
-
Solid, block-shaped, comment banken- like structure.
Inside the
Structure is a smooth , shiny , rounded, cylindrical object
resting on superts in a large room in aned with
instruments + tools wound the wall of the room
leaving
a lot of space around the object. Some sort of mechanis.
win the object employer concentric vings which turn +
lock . Object employe sophisticated technology , precise
tolerance, highutensile, high- strength materials ; mayor systems
we mechanical, but intricate electing parts of systems
are also present. Non- conducted precision alloy took must
be used to work on it. Object insides employ
modular concept- can be returned leaving Shell; certade
Components always necessary to allow object to function.
But certain parts can be substituted to fulfill
different dijectives for the object. Object normally
exists in a dormant mode , but can be placed in a
stand-by state, to be used at a moment notice
operationaly.
Does not own win Structure , but is
transported in
a lowered truck to someplace out in
open, where it is assembled with something de.
Object is for large for one on a few people to unone, but
is relatively easily woved with lifting equipment. Access
one located in sides + towards front to make adjustments +
fine tunings " to the electric parts . Iden of stabilizing
is important Strong sauce that object is a weapon, an
at least very closely weapon- related.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-17
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
Paul -5 Jun 87 - Project 8708,- SESSION #1-CRV
1 Paul this is a new project - an operational
project with a fairly short fuse . We will
be Interrupting other operations to permit The
exploitation of this tasking.
SG1A
(3)
541/2 - DIFFICULT to ACCESS. "Paul , What is
difficult to access, the signal line on the
Structure" That's really an inappropriate
comment on my part - It's the structure.
Paul you are spending some effort to describe
the area and that is not the interest here-
4) Yw have moved inside the structure and
that's OK, but The structure is not my
preme interest - I want you to focus on something
in the structure That interest me.
€5
Paul start a new page that one is very
massy / confusing. Que the term object in your
MatRox. IT'S a word you used in the previous page.
(Replacement depot)
6
What do you mean by Einsatz stellung - " like its
In neutral and Then turned on- like being in as
dormant condition but not a stand by tode -
7) "Do you need to know about the inside "
Paul, I need to know everything you can tell me
about this object you are here describing.
8
The concept of rund Things happening when the
trek is brought together needs to be examined
doser. Please do it in a matex
----
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
-
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1
2
9 I think I have explosives on the mind " to
to I Pane and before we move on that concept
has to be resolved and objectified. I would
like you & Stage 5 it for me and maybe we
can see where it's coming from before we
an,
your interested in an object but I don't
know where my drive come. I don't know
if it's weapon related or not related
"Paul, you have ALL stom and
depth charge - Both cured be apoumons of you
consider they are relevant only in the degree of
power and deployment point - therefore choose
one and stage v it - " I hulk that's the beat
way to go - I'll choose SADM"
I still have a feelmy its a weapon - Paul 1
can't discount that , how can I land credence
to it- " I know
12
Paul-I thought you were moving along well
when you were describing the components. Inside.
maybe that would assist you in resolving the
nature.
3
See if you can't come back in structure to
acquire some mine descriptions before you ver-
utilize the 541/2 format - find some
buildmy blocks of you will."
(14)
Paul one of the Amal paths I would like
To move through wetter session in the purpose
behind thes objects you may access the workers
IN The object but the goal is to clarify and
objectify the purpose of the object-
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300520001-1

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.