Project Interloper

CIA STARGATE release

CIA-RDP96-00789R000300030001-5

Opens with: PROJECT SUN STREAK (U)

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

5 pages, machine transcribed from the CIA’s released scan.

Approved For Release 2000/08/08 : CIA-RDP96-00789R00030003000135, 5
=/NOFORN - SKEET CHANNELS ONLY
PROJECT SUN STREAK (U)
ERV SESSION PROCEDURES REPORT
3 g
WARNING NOTICE:
INTELLIGENCE SOURCES AND METHODS INVOLVED
------------
-----------------------------------
CONTROL NUMBER: 8701
DATE OF SESSION: 17,30 Dec 86 %
8 Jan 87
NICKNAME:
TARGET COUNTRY: Unknown
REFERENCES: None
SESSION NUMBER: 01,02,03
DATE OF REPORT: 9 Jan 87
MISSION STATUS: Initial
TECHNIQUE UTILIZED: ERV & CRV
SOURCE IDENTIFIER: 101
-----------
1. ( S/NF/SK ) TASKING: Prior to the initial session, the
Interviewer was provided with a sheet of bond paper on which the
following handwritten note had been prepared:
"Interviewer/Monitor
tasking:
1) Describe the structure vic:
NOTE:
SG1B
Coordinates are "Center of Mass" for rather large area with several
sets/groups of structures". Prior to the second session the
Interviewer was made knowledgeable of other key aspects of the
target including a group of photographs of the site under
construction.
The actual location or suspected function of the
site was not made known.
At this time, the Interviewer was
instructed to concentrate efforts on determining the planned
purpose of this site in the future.
Source was provided the same
set of encrypted coordinates prior to each session, as per Extended
Remote Viewing protocols.
This was done to prevent inadvertent
geographic cuing.
Source was provided no other descriptive data
pertaining to this site.
2. ( S/NF/SK )
SESSION:
During each of the cited sessions in
this report, there were no reportable incidents or unusual
occurrences.
The first session was conducted entirely utilizing
ERV protocols.
The subsequent two sessions were conducted
utilizing Coordinate Remote Viewing Stage VI protocols during the
post-session interviews on key facilities reported upon in the
actual ERV session.
3. ( S/NF/SK )
SUMMARY :
a.
( S/NF/SK ) Following each of the three sessions described
in this report, Source prepared a post-session written summary of
his impressions.
These actual summaries, along with any other
TTO-P/NOFORN - SKEET CHANNELS ONLY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300030001-5
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300030001-5
"/NOFORN - SKEET CHANNELS ONLY
material produced during the sessions, i.e., sketches, notes, etc. ,
are maintained in the mission field dossier located at this office.
Much of the information in these post-session summaries was
redundant or not relevant to the ultimate target. To facilitate
analysis of Source's perceptions as described during and in post-
session interviewer, the major gestalts have been summarized with
explanatory Interviewer notes, when appropriate.
(1)
( S/NF/SK ) The site is located near a large industrial
based city built next to a dirty (polluted?) river.
There are
numerous separate structures at the site and a feeling that major
construction is on-going throughout the site.
In the first
session, Source concentrated on two types of buildings located at
the site.
The first was a large square-looking building giving an
impression of being almost modular in construction. A complex
series of scaffolding was located around the building giving a
further impression that construction or large scale modification
was on-going.
Internally, there appeared to be some sort of
incongruity.
Source stated that the exterior configuration was one
of a multi-storied, multi-tiered building similar to the DIAC
building.
Inside, however, Source was unable to perceive the
separate floors.
It was as though the building were a large shell
or hollow box.
The flooring appeared to be decorator stone, tile
or expensive marble.
Construction or modification work was also in
wide evidence throughout the interior.
(2)
( S/NF/SK ) A smaller building, the second type of
building at this site, appeared to be more rectangular or oblong in
shape than the larger building.
This building had a large amount
of glass fronting permitting a maximum amount of natural light to
enter the building.
Again this building, like the larger building,
appeared to be a large hollow shell, several stories high with
perhaps construction also on-going.
(3)
( S/NF/SK )
In this initial session, and the subsequent
two sessions, Source referenced, "cylindrical objects, tall, thin
and perhaps curving in the middle like an hour glass", which Source
labelled, "smokestacks".
These objects were further described as
being, "free standing and separate from each other". Again, in
conjunction with these objects there was a parallel impression of
construction on-going, i.e., "a welding smell, metallic, heat,
men's voices working on the outside, scaffolding." The cylindrical
objects are only one element of this site which Source described as
a "loose knit complex", which Source clarified by an analogy of a
key structure located on a large military installation which may
have other facilities related or unrelated to each other. Located
near one of the cylindrical objects or groupings of cylindrical
objects, (a reference by Source that the cylindrical objects may be
located in small groups of two or more cylinders), there is another
NOFORN - SKEET CHANNELS ONLY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300030001-5
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300030001-5
W /NOFORN - SKEET CHANNELS ONLY
type of building.
This building was described by Source as being,
"hard, very hard, with an impression (AOL) of a bunker with no
windows, a generally squared shape and built of stone or cement and
only one or two stories high.
(4)
( S/NF/SK )
To overcome some of the confusion stemming
from parallel images of structures and on-going construction,
during the second and third sessions Source was directed to, "move
ahead in time to a point when the construction is finished".
At
this time Source initially began by describing the "smokestack-
like" objects as being, "lighter in color, finished now and perhaps
covered with another substance". The grounds around the objects,
previously described as being, "rough, gravel, stones" are now
perceived as, "smooth, constructed and covered over now".
Anı
examination of the interior of the "smokestacks" caused Source to
experience an uneasiness and feeling of revulsion and anxiety. The
cause of this feeling could not be objectified. On this occasion
while describing these cylindrical objects, Source used the
following descriptives: "charging, semaphore, culminating,
collapsing, protection, safeguarding, cancelling, channeling, send-
forth/bounce back, toxic, terminal, surreptitious, and "canvasary
(sic)." Later in the second session, Source described the
associative aspects of these objects as follows:
"fraternal, a
visual of space, dark skies. Objects floating in it (space) and an
impression of stars.
(The phrase) "back-up" comes to mind but
that's (imprecise) .
(Other phrases are) , safeguard, crossover, and
switchback.
(I also perceive) the concepts of sending, shuttling,
proportional, structural and "in-series"
,
a direct one to one
relationship. One action here is (felt elsewhere). A one fourth
turn here is a one fourth turn there.
A subservience and a control
function."
At the core of the cylindrical objects, Source
perceived the impression of a "blast furnace, a drafting table,
devices used to measure the location of stars, head, a laboratory
and asbestos clothing." When queried about the activity at this
area of the site, Source reported the people here were very
cautious alert, "like loading tear gas rounds. Everything is
carefully pre-planned and rehearsed. The lightest error is greatly
magnified at the terminus in the same manner that a mil offset at a
mortar aiming stake will translate to a wide margin of error at the
target". While in operation, the site is characterized by, "a hum,
a sizzle, a very, very bright light requiring people to wear
goggles.
There is emitting of light and radiation, a rythmatic
clanking sound. "
(5)
( S/NF/SK ) In the third, (and final session covered in
this report), Source was again moved forward in time to a point
when the site was fully operational. At this time Source began by
stating that the "smokestack-like" objects were not actually
smokestacks but rather large metal cylindrical structures,
C 0 D/NOFORN - SKEET CHANNELS ONLY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300030001-5
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300030001-5
"/NOFORN - SKEET CHANNELS ONLY
"clustered together in groups" located on a larger fenced in
complex .
In the future the security of the complex increases
dramatically compared to the real-time construction period.
There
are other buildings at this site which may or may not be directly
related to the cylindrical structures.
One building, the largest,
was described as generally square shaped and performing operational
functions as well the inevitable bureaucratic/administrative duties
of the site.
A second type is more closely related to the actual
cylindrical structures and may actually be co-located near the
objects.
This second type of building is described as not as tall
as the main building but nevertheless it may be two or three
stories high. It has no windows, a sloping or angular roof and
large entry ways at the end. The overall impression is a lower
profile rectangular building, perhaps partially subterranean,
resembling a hardened military bunker.
The cylindrical objects at
this point in the future are seen as having curved sides, generally
resembling elongated hour glasses.
The tops are, "nub-shaped
resembling a Bishop on a chess board."
According to Source there
are more than one of these cylindrical structures but the exact
numbers were confusing.
Source perceived that these objects were
located in groups of two and may be operated in pairs.
The phrase,
"circular and roundness", interposed themselves in various forms
when Source attempted to describe major components of the site.
Source's "interest", continued to center around the cylindrical
objects so Source was tasked to focus all of his attention of these
objects.
(6)
( S/NF/SK )
The interior of the cylindrical objects
contain tubes or wiring along the walls.
These tubes or wiring are
coated with colored, sheath-like covering. The predominant color
is yellow of the tube/wiring is yellow, although green, blue and
black are also present.
The top of the cylinder has a metallic
ring which is constructed in a manner that would permit something
else (NFI) to be clamped and secured over the top. In the bottom
of the cylinders are two mirror-like objects, perhaps made of
highly polished metal. The mirrors are arrayed to resemble an
inverted "A" or tepee.
The opposing angles of these two mirrors
are carefully controlled to insure that the one mirror is exactly
the same angle as the other. The mirrors are moveable to the point
that the upside down "A" affect can be completely reversed to form
a proper right side up "A" or triangle. During this movement
process the mirrors stay in contact with each other along a mutual
edge and the preciseness of the opposing angle is carefully
maintained. The movement serves a purpose similar to the aperture
setting in a camera lens.
The interior walls of the cylinder also
seem to contain grooves or lines resembling the lines/grooves found
on an engine piston (piston ring seats). Words perceived by Source
concerning these cylinders during the third session included:
"transferring, shuttling, orbiting, cyclonic, rushing, cooling,
NOFORN - SKEET CHANNELS ONLY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300030001-5
. ...
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300030001-5
wwww I/NOFORN - SKEET CHANNELS ONLY
"crux (sic) ", chambering, debilitating, defusing, delinquent,
crowded and deception".
(7) ( S/NF/SK )
Source was queried concerning the operation
and functioning of the cylindrical objects and/or any related
facilities at the site. Some of the key aspects of the site were
as follows: "propulsion, a directed force possibly even a directed
ray, a "corellis (sic) affect", an image of counter-clockwise
turning, alternating current, a crossover and a the concept of
linkage of some type". A typical sequence of events when this site
is being utilized was described as, "the entire concrete structure
(the bunker type building) moves, however the cylindrical objects
do not in themselves operate alone. The cylindrical structures,
(or at least some of these structures may actually be located
within the concrete building). There is a sense of shared
responsibility.
There is a lot of movement and a lot of people
running around.
There is an impression (AOL) of a large, thick,
grey cloud. Smaller cylindrical objects, possibly lined up in a
row and also possibly located within the concrete structure,
operate in unison and in conjunction with instructions from
another place.
In another location there are two large bowls
(dishes as in microwave or radar dishes) on poles. There is a
very, very bright violet light and a strange shade of blue light
either being transmitted from these bowls or being sucked into them
at an angle equal to what ten o'clock would be on a watch face.
I
get an !AOL of a hugh saucer shaped object associated with the
thick grey smoke. The light is no longer being reflected.
The is
a smell of ammonia in the air but no sulphur - no smell of rotten
eggs.
The thick cloud has thickness like you could actually cut a
piece of it off and eat it.
There is a sizzling, crackling, static
sound. The concept of electromagnetism is important.
Surprisingly
the cloud is cool . . . . '
b.
( S/NF/SK ) The data provided by Source, although
enlightening and informative still failed to adequately explain the
purpose of the construction at the target site. In post-session
CRV Stage VI exercises, Source reinforced descriptives provided
above and provided several clarifying sketches which tended to
place some of the descriptives in proper perspective.
4. ( S/NF/SK ) OPS FEEDBACK: No further feedback from the
Operations Officer has been provided to the Interviewer concerning
this site.
It is planned to continue to target Source to this site
to attempt to answer in more detail the actual Intelligence
question.
SGFOIA3
GS-12, DAC
Interviewer
### ### OFORN
· SKEET CHANNELS ONLY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000300030001-5

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.