Project Interloper

CIA STARGATE release

CIA-RDP96-00789R000200200020-6

Opens with: HANDLE VIA SKEET CHANNELS ONLY

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

15 pages, machine transcribed from the CIA’s released scan.

Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
AWARE /NOFORN -
HANDLE VIA SKEET CHANNELS ONLY
0842
0945
PROJECT SUN STREAK (U)
WARNING NOTICE:
INTELLIGENCE SOURCES AND METHODS INVOLVED
PROJECT NUMBER :
8717
88
SESSION NUMBER:
1
88
DATE OF SESSION: 04 JAN 87
DATE OF REPORT:
05 JAN 87
START:
0842
END :
0933
METHODOLOGY:
CRV
VIEWER IDENTIFIER:
095
1. (S/NF/SK)
MISSION:
See attached tasking data sheet.
2. (S/NF/SK)
VIEWER TASKING:
Coordinates only.
3. (S/NF/SK)
COMMENTS:
095 is still undergoing Stage 4 training.
Upon completion of the session, 095 was informed that the site had
been an ops target.
SG1J
CPT, USA
CADORET /NOFORN - SKEET CHANNELS ONLY
CLASSIFIED BY:
DIA-DT
Approved For Release 2000/08/08 : CIARDP96-00789R000200200020-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
SESSION SUMMARY
4 NOVEMBER 1987
SOURCE 0095
Site is a interconnected structure (s) with a thin/ flimsy dome
like substructure on one end.
Site is under construction, and
workers are sliding long things into place.
There is additional
structure area underneath the bottom of the dome.
The dome is
open and airy inside.
The purpose of the structure is military.
In 1990, there are intermittent very loud (machine like?) noises
occurring, and there is a feeling that the structure is not yet
completed.
The dome is concealing something: angular/
rectangular objects.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R00020020
FtMende
PI-
AV: UFO stay -
SG1J
Monitor
7 Jan 87
0842
589281
856562
min 6k
589281
856500
·
A. arvinganos
B. -
auf.bk
matince
589281
856562
4, vertical up
had
5-2
home.
AULBK.
Luxe.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
2
589281
8565
589281
856546
mes bk
mis 6k
mis 6k.
589281
856562
589281
8565421
A. curving across
soft
589281
856562
589281
856267
anfbk.
any es fluity
us manide
hunbk
mus 6k
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
3
589281
856567
up Jouant
A. cursing arios
Rft
5-2
gray
Gume.
.
HOL BE
done
O'cun cta.
Ar-Bk
goldring
589281
856562
miss 6k
1
589281
856567
A. coving. any
5-2
.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
4
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
589281
856561
A. curving tp Men
Oui.
mui made
B. structure
5-2
high.
curved
AUL BK.
russinathody
catedral.
Spagy.
AOL BK
geodesic
June.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
5.
AOLBK
9.00 year
bling
: any
1
€
1
€
€
AOLBK
inflictedble
recreation
bubble .
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
6
1000 m North and 200m up]
.
589281
856562
589281
856502
A. curving
And
Bilad.
Grands,
[goom N/200mup Took south)
589281
856562
menbk
AMBL
06 Sati.
min ble
519281856561
589281
85656
A. acrossangle
verticalup curving
up overdown.
minnwo
B. strutve
5-2
6:4.
Approved For Release 2000/08/081CHA-RDP96-00789R000200200020-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
7
HOLBE
tut
rota
DOUBL
smy Shigh
-
-
4
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
8
7
1
7
3
.
.
3
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
AOV16
capital
Guido
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
9
5-2
white
D
AR ET
+ I AOL AOUS
-
[inside]
open
airy.
Gown.
dim
high.
AOLBK
capital.
[activity]
AOLBK.
restoration
06
Michaelagelis
[inside]
nanow.
1
[1990]
people. maring.
amaying
Slidingthings
intopeace-long.
[activity
inside
1000 nike
1
AOURK
missie
site.
HouBK
bunte
smeds
Felsite.
HOUBK.
construction
Storage.
Une.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
4
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
10.
5-2 0
At ET
T I
[1990]
Cactivity ]
Exemple]
HOL AoUS.
AOUBK
military.
white
black
glossy.
intermittent
machine
noises:
floor.
Emerson].
not complete.
[completion
[structure}
[activities]
Cintendeduse
done]
AOLBK
event,
Lent.
Site
an interconnected structure under construction
with a thin done like substructure wien
a partial the structure. Duved acer spiny.
W Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
.. .
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
5-2.
0
At ET
T
I
AvL
AOL/S !!
5 4/2
Jone
is exneeding.
angular
rectomytoly
objets.
high.
Smooth
ALL BE
Construction
mitaines.
1/2
construction/structie
Underthedome.
[Rupase]
Military
One
Structures.
1
.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
,
.
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
5 Oct's7
NOFORN
1.
PROJECT:
8717
2.
COORDINATES:
589281/856562
3.
BACKGROUND:
There are new structures under new or recent
construction
at the Target Site at 589281/856562.
These new
structures are of high interest to a US intelligence community
customer.
4.
ESSENTIAL ELEMENTS OF INFORMATION (EEI) :
Access the Target
Site at 589281/856562 and identify/describe the new structures of
high intelligence interest.
Address and respond to the following
EEI:
a.
Provide an overview of the Target Site and identify the
structure (s) of specific intelligence interest.
b.
Describe the purpose and actual or intended use of the
new/recent construction activities at the target Site.
C.
Provide conceptual drawings in support of your findings.
ENOTE:
IF THE NUMBER OF STRUCTURES AT THE TARGET SITE BECOME TOO
VOLUMINOUS AND THE CAUSE OF VIEWER CONFUSION, LIMIT THE INITIAL
COLLECTION EFFORT TO THE STRUCTURE OF HIGHEST INTELLIGENCE
INTEREST.
ADDITIONAL SITES WILL BE REVISITED FOLLOWING CUSTOMER
ASSESSMENTS OF THE INFORMATION PROVIDED BY INITIAL INTERIM
REPORTS.)
HANDLE VIA SKEET CHANNELS ONLY
VNOFORN
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6
/NOFORN
FOR VIEWER 095
6 Jan 88
1.
Provide an aerial view (overhead) of the target site.
Identify the target structure and place the target structure on
the sketch.
2.
Sketch :
the structure with the dome.
Indicate how much of the
dome structure is above
ground or underground.
3.
Viewer 095 Summary of 4 Jan 88 states, "The dome is
concealing something:
angular/rectangular objects. "
"""This data correlates with info provided by other viewers.
.... .... .
"Access, describe, and sketch the "angular/rectangular
objects, "
4.
Viewer 095 indicates the structure as having a military
purpose.
"""The structure does have a definite military purpose.
......
Describe the functional
purpose of the target
structure.
5.
The structure is part of a larger target area.
Identify and
describe the overall purpose of the overall target site.
6.
Following the above, re-access the general target area and
determine the presence (if any)O of any other target structures
of specific intelligence interest.
SG1J
wL.WITT/NOFORN
HANDLE VIA SKEET CHANNELS ONLY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000200200020-6

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.