Project Interloper

CIA STARGATE release

CIA-RDP96-00789R000100550001-0

Opens with: PROJECT SUN STREAK

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

2 pages, machine transcribed from the CIA’s released scan.

Approved For Release 2000/08/08 : CIA-RDP96-00789R000100550001-0
18
T/NOFORN-SKEET CHANNELS ONLY
PROJECT SUN STREAK
(U)
WARNING NOTICE:
INTELLIGENCE SOURCES AND METHODS INVOLVED
CRV Session Procedures Report (S/NF/SK)
IControl Number
8609
IDate of Session
03Feb87
= ==
IDate of Report
03Feb87
1
ISource Identifier: 003
199
1634
1154
1.
(S/NF/SK)
Tasking:
Original tasking data sheet attached.
This
source had worked the target four times previous to this session.
Ops
officer and monitor discussed several different approaches to this
session;
it was left to the monitor to decide upon a method of attack.
Monitor created a Stage 6 worksheet (see attached) from which source
began session.
2. (S/NF/SK)
Session:
Began by monitor instructing source to place
a S6 matrix on the top of his page.
Source was uncomfortable with this
procedure, until he was informed (in response to his query) that he had
already worked the site four times.
Monitor then passed the Stage 6
worksheet to source and explained that the dark figure beneath the time
line was symbolic of the site.
Another S6 tool employed in this session
was the use of a group of symbols (representing disparate elements of a
project) placed within a circle (representing the "whole project") .
When source objectified "things" as a general term for what this site
was all about, monitor used it as a entree into the problem, (where,
when and what) .
3.
(S/NF/SK)
Summary:
Site is located on flat, barren, northern
terrain.
It consists of many diverse elements;
structures, things and
activities,
which are all related to or support a common military
defense project. A large industrial-type facility is present on the
site to support the project.
There is a person here in charge who is
very impatient by nature and frustrated at what he perceives to be the
slow pace of progress on the project.
(Refer to source 56
worksheet/time line): At the points (times) indicated on the time line,
"sub-trials" of project (device) "sub-elements" were tested.
In the
near future, a "main trial phase" will be undertaken which will submit
the device to limited operational
testing.
In this regard, source
perceived that great care will be taken to prevent too great a
NOFORN-SKEET CHANNELS ONLY
CLASSIFIED BY: DIA-DT
DECLASSIFY
OADR
Approved For Release 2000/08/08 : CIA-RDP96-00789R000100550001-0
Approved For Release 2000/08/08 : CIA-RDP96-00789R000100550001-0
www"/NOFORN-SKEET CHANNELS ONLY
"signature".
Monitor directed the source to place his pen on the word
"signature" in an attempt to evoke more data. This produced associated
ideas of: indicator, envelope, leakage, odd frequency, bandwidth, and
color spectrum.
Similarly, "indicator" evoked the ideas of 1)
relevant/significant people gathering, 2) change in security patterns,
3) RF shielding, 4) equipment reference patterns, 5) power shifting, and
6) aircraft operation in vicinity,
A S5 of "trial phase" produced the following:
Objects - (source was instructed to turn his attention to
attributes) .
Attributes - highly technical, complex, metal, plastic, hot, cold,
smooth, burnished, heavy duty, meticulously constructed, large, rounded,
wired, irregularly shaped, angles, curved, dished, slanted, adjustable,
electronic, powerful, black, dangerous, "soundy" (vs. noisy) , high-
pitched, low-pitched, steady, clear, shiny, flat, intricate,
microengineered, elliptical, and charged.
Subjects - evaluation, verification, assessment, calibration,
matriculated, projection, power, "weapon", effects, radiating,
emanations/emissions, demonstration, convincing, introducing, coercing,
stifling, technology, physics, and alternating.
Topics - controlling, curiosity, anticipation, justification,
satisfaction, and culmination.
Other perceptions of the device were that it requires high levels of
voltage and amperage to accomplish its purpose.
Also, the device is
associated with a structure that is rounded, large, solid as well as a
part that is rectangular.
There is an old part and a new part.
Levels
and wings are present;
as parts were added, aesthetics were not
considered-functionality was the only consideration with regard to
construction.
There is "roof clutter"; functional things which may
include RF radiators.
4. (S/NF/SK) Feedback:
Monitor informed source that he has done a
superb job.
SG1J
CPT, USA
/NOFORN-SKEET CHANNELS ONLY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000100550001-0

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.