Project Interloper

CIA STARGATE release

CIA-RDP96-00789R000100280001-0

Opens with: PROJECT SUN STREAK (U)

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

2 pages, machine transcribed from the CIA’s released scan.

Approved For Release 2000/08/08 : CIA-RDP96-00789R00010028000140
SLUTET NOFORN-SKEET CHANNELS ONLY
PROJECT SUN STREAK (U)
WARNING NOTICE:
INTELLIGENCE SOURCES AND METHODS INVOLVED
CRV Session Procedures Report (S/NF/SK)
IControl Number
: 8609
IDate of Session
: 09Dec86
IDate of Report
: 10Dec86
==
ISession Number
CRV-06
ISource Identifier: RV-018
099
1032
1211
1.
(S/NF/SK)
Tasking: See original tasking data, attached.
No
change, intel question remains unanswered (per discussion with ops
officer).
2.
(S/NF/SK)
Session:
Virtually no time was spent in S1/S2;
after
describing a land/land interface, source was moved directly to S4 where
he was directed to place his pen in the S2 column and resume describing
the site. Shortly thereafter, source was instructed to draw a S6 time
line encompassing the decade 1971-1980; (while the tasking instructions
specified a different time line, monitor split this up with the intent
that source would not recognize the site as the same one which he had
worked during the last three sessions successively. Despite this effort
at concealment, source recognized the site almost immediately and was
provided confirmation by the monitor). Source description of what
appeared to be much underground activity was the topic of discussion
between monitor and ops officer during a break in session. Later, ops
officer suggested that, since source had only been provided with the
first part of the time line, perhaps source had been describing
construction of the target facility. Monitor feels that this assessment
is probably correct.
Source was given a number of movement exercises
before he actually began perceiving/describing the target.
(Monitor was
convinced that the source was on site but not picking up on the target).
Source was instructed, at one point, to move to the "director's office"
and into the "project files". This movement exercise was an experiment
on the part of the monitor, the results of which can not be determined.
3. (S/NF/SK) Summary: Site is a semi-isolated place; flat.
Target
is both abouve and below ground.
Site seems to have "lines" radiating
NOFORN-SKEET CHANNELS ONLY
CLASSIFIED BY: DIA-DT
DECLASSIFY
: OADR
Approved For Release 2000/08/08 : CIA-RDP96-00789R000100280001-0
Approved For Release 2000/08/08 : CIA-RDP96-00789R000100280001-0
NOFORN-SKEET CHANNELS ONLY
from it. The lines were composed of a series of "dots".
These dots
were seemed to relate to the idea of a long, round, pointed object
covered with some type of "concealing" material.
4. (S/NF/SK) Feedback:
Source was informed that he had probably
perceived the target during its construction, (ergo, the repeated
descriptions of digging, etc., activities), and that next session he
would be asked to move forward in time for other target-related data.
SG1J
.
NOFORN-SKEET CHANNELS ONLY
Approved For Release 2000/08/08 : CIA-RDP96-00789R000100280001-0

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.