Project Interloper

CIA STARGATE release

CIA-RDP96-00788R002000180006-6

Opens with: STATEMENT OF WORK: NOVEL INTELLIGENCE

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

19 pages, machine transcribed from the CIA’s released scan.

Approved For Release 2003/09/0
SEORET
P96-00788R002000180006-6
?
STATEMENT OF WORK: NOVEL INTELLIGENCE
COLLECTION TECHNIQUES (PSYCHOENERGETICS-
THREAT TO US AND POTENTIAL APPLICATIONS)
2
.
Classified by
DIA/DT-1
Doclassify on
Review on
14 November 2000
Extended by DIA/DT
2-301-C-3, 5 & 6
Approved For Release 2003/09/09
CA-RDP96-00788R002000180006-6
Approved For Release 2003/001095 CJA-DP96-00788R002000180006-6
STATEMENT OF WORK: NOVEL INTELLIGENCE
COLLECTION TECHNIQUES (PSYCHOENERGETICS-
THREAT TO US AND POTENTIAL APPLICATIONS)
1. General
The objective of this effort is to investigate in detail certain
psychoenergetic phenomena that have potential military applications.
Emphasis will be on evaluating application potential and limitations of
such phenomena, and to provide such knowledge as gained under this
contract to appropriate DoD agencies who will evaluate the significance
of foreign work, particularly as it may pose a threat to the US.
Major emphasis will be on evaluating remote viewing phenomena and
in particular, targeting aspects, via coordinate or other methods.
Related to this are training methods, methods of enhancing reliability
and repeatability of the phenomena.
2.0 Specific Tasks (FY 81)
2.1 Develop audio/semantic analysis techniques to separate correct
from incorrect data available from taped viewer descriptions of remote
viewing sites and to provide selective editing under operational conditions.
2.2
Determine what is required for target acquistion (names, maps,
coordinates, pictures, arbitrary labelings, simply the word "target",
etc.)
2.3 Evaluate threat potential of foreign remote viewing - type
investigations :
2.3.1 Simulate experimental results for which there is data to
assess validity of the foreign research.
2.3.2 Assess military applications potential of the foreign research
(or claims), particularly where a threat to US security is possible.
2.3.3 Assess feasibility of the most significant applications and
evaluate limitations.
Approved For Release 2003/09/09 - CIA-RDP96-00788R002000180006-6
SAURET
Approved For Release 2003/09/0
SECRET
96-00788R002000180006-6
2.4 The following task will be undertaken to explore the applications
potential of remote viewing. It will specifically undertake the task of
developing and evaluating a training program designed to increase the
reliability of remote viewing and seek to gain better data on operational
targets.
2.4.1
Evaluate the use of remote viewing to locate target objects or
people.
2.4.2 Evaluate the use of remote viewing for event detection and to
locate events.
2.4.3 Evaluate the use of remote viewing to detect the presence or
absence of targets.
2.4.4 Evaluate the potential of various camouflage, concealment and
deception as countermeasures to remote viewing.
2.4.5
Investigate the effects of the following variables on the remote
viewing phenomena, (a) accuracy,
(b) degree of resolution, (c) affect on the
sensory inputs (feel, smell, touch, etc).
2.4.6 Determine potential of remote viewing to assess other types of
information, such as specific S&T data, or function/purpose of facilities or
activities.
2.5
It is anticipated that during the contract period there will be
quick reaction tasks approved by the Grill Flame Committee, passed through
the COTR and levied on the contractor.
These will be of high priority and
will require prompt attention.
2
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
3,
Security Requirements: It is expected that a maximum of six
SI/SAO billets will be required to properly support the program. If and
when SRI International commences work on operational situations, it is
required that all personnel connected with operational matters possess the
necessary clearances.
4. Deliverables: The contractor shall provide the following:
4.1 Quarterly Reports to highlight accomplishments and resource
expenditures (by specific tasks the amount of funding, equipment used,
Professional/Support man hours). Detailed progress on each subtask
designated for examination during the quarter will be completed by the
contractor.
4.2 Draft Final Report using the same format as the Quarterly Reports
but covering the entire contract period.
4.3 A Final Report based on the Draft Final Report and the
comments made by the COTR.
4.4 Program progress briefing shall be of an informal nature
and shall be held at the end of each quarter. The contractor shall
furnish copies of informal charts, viewgraphs and other aids as may
be needed. The informal briefings shall consist of a contractor
presentation and informal discussion among contractor, funding
agencies and other government personnel as appropriate.
4.5 Quick reaction reports as required by the COTR. They
will be of limited scope and deal with subjects of especially high
interest and/or critical timeliness.
3
Approved For Release 2003/09/09: CIA-RDP96-00788R002000180006-6
SECRET
Approved For Release 2003/09/094 CIA-RDP96-00788R002000180006-6
4.6 All supporting material, i.e. notes, maps, tapes for this
contract will be made available by the contractor to the COTR
and no such material will be destroyed without written permission.
5.
Delivery Schedule: The COTR will insure members of the
Grill Flame Committee receive copies of all deliverables.
5.1
Quarterly Reports: Five copies to the COTR. The first
report is due 100 days after the contract award date and will
cover the first 90 days of the contract. Subsequent reports
will be due each 90 days thereafter, i.e., 190 days after contract
award, 280 days, 370 days, etc.
5.2
Draft Final Report: Five copies to the COTR within 30 days
of completion of the contract. Comments will be returned to the
contractor within 45 days of receipt of the draft.
5.3
Final Report: Ten copies and a camera ready master to
the COTR within 45 days of receipt of the comments made en the Draft
Final Report.
5.4 Program Progress Briefings: Approximately 4 per year are
anticipated. Specific times and places will be established by the
COTR. Some briefings will occur in the Washington, DC area and may
involve more than one presentation by the contractors.
5.5 Quick Reaction Reports :
Number of copies, place and time
of delivery to be determined by the COTR ..
5.6 Supporting Materials: Provided to the COTR when requested
during the period of contract performance. All such material will
be finally delivered to the COTR at the same time as Final Report.
(5.3 above).
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
SECRET
Approved For Release 2003/001090
SECRET
RDP96-00788R002000180006-6
MILESTONE CHART:
NOVEL INTELLIGENCE TECHNIQUE
FY-81 ($420K)
2.0 Tasks for FY 81
2.1
$ 65K
2.2
$ 55K
2.3
$150K
2.4
,
$140K
2.5
$ 10K
SECRET
Approved For Release 2003/09/09 . CIA-RDP96-00788R002000180006-6
SECRET
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
GOVERNMENT FURNISHED PROPERTY/EQUIPMENT
Government furnished property or equipment to be provided to the
contractor will primarily consist of reports, data, and documents
which will be provided on a loan basis. Contractor access to other
DIA facilities as may be necessary will be arranged by the DIA contract
monitor.
INSPECTION AND ACCEPTANCE
Inspection, acceptance, and delivery of reports, will be at the
Defense Intelligence Agency, ATTN: DT-1A, Washington, D.C., 20301.
Acceptance will be based on a determination by the COTR with the
approval of the Grill Flame Committee that the contractor is performing
in accordance with the tasks specified in the Statement of Work.
TECHNICAL PROPOSALS
Requires the contractor to provide information which details his
methodology. schedule, and manpower loading in meeting the contractual
requirements. Such information should be submitted to DIA/DT-1A for
evaluation by the Grill Flame Committee prior to negotiations.
OTHER
The classification of the contract is SI/SAO.
Reports issued under
this contract shall contain the following acknowledgements:
This study was supported and monitored
by the Defense Intelligence Agency of
the Department of Defense under Contract No.
4
Approved For Release 2003/09/09 .: CIA-RDP96-00788R002000180006-6
SECRET
Approved For Release 2003/09/09 . CIA-RDP96-00788R002000180006-6
GOVERNMENT FURNISHED DATA
1
Data required by the contractor will be requested in writing from
the COTR. The COTR will maintain a record of all government documents
transferred to the contractor and will ensure their return when the
contract terminates.
SG1J
-
CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE (COTR)
2
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
SECRET
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
REPORTS
1.
These reports will present a concise and factual discussion
of findings and accomplishments during the period and must include
appropriate references.
2.
Each report will include a report summary. This summary.
prominently identified, should normally not exceed a few pages. The
purpose of the projects must be specified, together with a description
of important equipment purchased or developed, if any, and the
conclusions reached by the contractor. The most important single
feature of this summary is that it must be meaningful to readers who
are not specialists in the subject matter of the contract.
3. The requirement for careful preparation cannot be overemphasized
as this summary will often provide the basis for decision on the
continuity of the project. The contractor must recognize that his
achievements are quite often surveyed by Department of Defense staff
who function at a level that precludes a thorough review of detailed
reports.
4. When appropriate, references should be made to more detailed
sections of the report in order to guide those who may be prepared to
spend the additional time required to develop a more complete and
professional understanding of the accomplishments.
5. The report summary should include the following information for
each major portion of the work.
a. Problems.
b. General methodology (e.g., literature view, laboratory
experiment, survey, field study, etc. ).
c.
Results
d. Implications for further research (if any).
e. Special comments (if any).
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
SECREZ
SECRET.
Approved For Release 2003/09/09 . CIA HDP96-00788R002000180006-6
MIPR CONTROL PROVISIONS AND GUIDANCE
1. Funding cited may be used only for the project delineated in the
attached Statement of Work.
2. The total MIPR estimate shall not be exceeded by the purchasing
office.
3. Changes in purpose, scope or desired results from those delineated
in the attached Statement of Work must be approved by the COTR with the
approval of the Grill Flame Committee.
SG1J
Approved For Release 2003/09/09 - CIA-RDP96-00788R002000180006-6
.
,
.
SECRET
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
NOVEL INTELLIGENCE COLLECTION TECHNIQUE (U)
JUSTIFICATION FOR SOLE SOURCE PROCUREMENT WITH
SRI INTERNATIONAL
1
1. (C)
Sole source procurement must be initiated for the award of the
contract to SRI International of Menlo Park, CA, for FY 1981.
2. (S) In order to fulfill the objective of this Statement of Work,
the contractor is required to have a high degree of technical competence in
the analysis and evaluation of advanced threat techniques. There is
no doubt that SRI has the background and expertise desired for the
specific advanced threat of interest. SRI is a recognized leader in
this particular field of analysis and evaluation, and has performed
similar work for other US Government agencies over the past few years.
Their previous work, under Contract DNA 001-78-C-0274. will form a
highly meaningful data base which will greatly enhance the value and
effectiveness of this contractual effort.
3. (C) The effort involved for a new contractor to research the same
level of capability and expertise that SRI currently possesses for this
area of analysis and evaluation would be too time consuming and uneconomical
to acquire and develop. To acquaint a new contractor in this area of expertise
would require several years simply to achieve the present level of expertise
and competence possessed by SRI.
4. (C) The performance of SRI on similar government contracts since
1974 is judged as satisfactory, justifying them as a sole source. The
SRI researchers implemented numerous innovations to maximize output of
these prior year contracts, and were able to utilize additional resources
at SRI without added cost to the government.
5. (C)
The capabilities and characteristics delineated above,
especially the SRI-funded development of sources and data base, ensure
that SRI International alone has the qualifications to satisfy the
requirements set forth in the Statement of Work, expecially within the
compelling time frame of this contract.
.
JACK VORONA
Assistant Vice Director for
Scientific and Technical
Intelligence
Classified by
DIA/DT-1
Declassify on
Review on
27 February 2001
Extended by.
DIA/DT
Reason
2-301-C, 3, 5&6
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
DIA LOGISTICS/SUPPORT PLAN
SG1J
Novel Intelligence Collec-
PROJECT TITLE
tion Techniques
PROJECT SPONSOR
ELEMENT
DT-1A
TELEPHONE
SG1
A
A. EQUIPMENT MAINTENANCE PLAN, Support Element: RTS-6
1.
Internal Maintenance
a.
Personnel
b.
Training (No equipment required. This is exclusively a study
contract.)
c.
Spare Parts
d.
Maintenance Facilities
e.
Test and Support Equipment
f.
Technical Data
2.
Contractor Maintenance
a.
Periodic prevention maintenance and repair
b. On call maintenance only
B.
SUPPLY SUPPORT, Support Element: RTS-6 (No supply support required. )
1.
Consumables (Include complete description and estimated cost. )
a.
Source
b.
Expected Usage
c.
Lead Time
d. Cube of required stocks
2.
Equipment Storage
C. EQUIPMENT TRANSPORTATION HANDLING, Support Element :
RTS-6 (No equipment
required, this is exclusively a study contract. )
1.
Weight and dimensions of equipment/furniture
2.
Destination building and rooms
3.
Expected delivery date(s)
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
SECRET
Approved For Release 2003/09/09 . CIA RDP96-00788R002000180006-6
D. FACILITIES, Suport Element: RTS-6 (No Government facilities utilized. )
1. Utilities and dates required (power, water, air conditioning, telephone
other.)
2. Space and construction requirements and dates required
3. Location
4.
Physical security
5. Health. environmental and safety implications
E
PERSONNEL AND TRAINING. Support Element: RPM-1 (No DIA personnel involved
other than contract monitor. )
1.
Number of civilian and military personnel involved
2.
Type and explanation of changes desired
a.
New or revised civilian positions (No new positions required)
b.
New or revised military positions
3. . Required training civilian and military personnel
a. Internal
b. Contract
4.
Personnel relocations
a.
Work site locations involved
b. Travel and transportation (TDY/PCS)
F.
INFORMATION SYSTEMS, Support Element: RSO ( No ADP equipment required.)
1.
Systems concept including milestones
2.
Software requirements
a.
Systems design/development
b. System engineering
c. Data base/applications
2
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
SECRET
3.
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
Hardware
2
a.
Mainframes
b.
Front end processors
c.
Terminals
4.
Required funding
a.
Hardware
(1)
R&D
(2)
Procurement
(3)
0&M
b.
Software
(1)
R&D
(2)
0&M
g.
PUBLICATIONS AND GRAPHICS, Support Element :
RTS-5
1.
Publications (None required. All provided by contractor. )
a.
Number of publications and textual pages per publication needed.
b.
Processing time allowable for each publication.
c.
Number of maps, photographs, illustrations for each publication
2.
Briefings
a.
Number and length of separate briefings to support project
b.
Security classification of briefings
H.
COMMUNICATIONS, Support Element :
RCM (No communications equipment used. )
1.
System concepts
2.
Hardware requirements
a.
COMSCC equipment
b.
Communications equipment
c.
Installation materials
3
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
SECRET
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
.
3.
Responsibilities/tasks
4.
Funding
5.
Life cycle support
6.
Training requirements
7.
Tools and test equipment
8.
Manning
9.
Documentation
.10. Security classification
I.
PROCUREMENT PLAN, Support Element: RTS-6 ( Include complete description
and estimated cost.) No procurement required.
1.
Equipment, furniture, administrative equipment (copying equipment,
typewriters, etc.)
a.
Competitive sources
.
b.
Required delivery schedule
c.
Installation of equipment
d.
Initial spares and components
J.
SECURITY SERVICES, Support Element: RSS (It's expected that the contractor
will require six SI/TK billets.)
1.
Security clearances and security classification guidance
2.
Physical security
a.
Monitor security during developmental phases
b. Other physical security requirements
3.
Safeguarding information/documents (Material to be secured in existing
vaulted area by contractor. )
4.
Contractor security
a.
Required classification storage (SI/SAO vaulted area) (Existing)
b.
ARFCOS mailing address (N/A)
c.
Access to classified data files (to be furnished by COTR)
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
SECRET
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
d. Authority to publish codeword documents (Codeword studies to be
furnished by COTR. )
e.
Courier authority
f.
Required access to classified information by contractor personnel
not directly involved in program, e.g., management, marketing, purchasing
personnel
5.
TEMPEST Security (DIAR 50-31) (Not applicable. This is a study effort
only. )
a. Provide TEMPEST and RED/BLACK engineering guidance.
b.
Assist and support Directorates in developing TEMPEST requirements
for inclusion in procurement specifications
c.
Review equipment/system procurements to insure inclusion of TEMPEST
requirements
d. Arrange and monitor DIA TEMPEST tests
e.
Accredit equipment/systems which are in compliance with the National
Policy on Control of Compromising Emanation
K.
CENTRAL REFERENCE, Support Element :
RTS-2 (No effect on existing support
provided to DIA/DT.)
1.
Acquisition
2.
Storage and retrieval
3.
Translation
4.
Dissemination
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
DEPARTMENT OF DEFENSE
CONTRACT SECURITY CLASSIFICATION SPECIFICATION
1. THE REQUIREMENTS OF THE DOD INDUSTRIAL SECURITY MANUAL
APPLY TO ALL. SECURITY ASPECTS OF THIS
EFFORT. THE FACILITY CLEARANCE REQUIRED IS:
Top Secret
2.
THIS SPECIFICATION
IS FOR:
3. CONTRACT NUMBER OR OTHER
IDENTIFICATION NUMBER
(Prime contracts must be shown
for all subcontracta)
4.
DATE TO BE
COMPLETED
(Estimated)
5.
THIS SPECIFICATION IS:
(See "NOTE" below. If item b or c is "X'd"",
also enter date for item a)
DATE
X
PRIME CONTRACT
b. SUBCONTRACT (Use item
15 for subcontracting
beyond second tier)
b. FIRST TIER SUBCONTRACT NO.
b.
b. REVISED
(supersedes
all previous
specificationa)
REVISION
NO.
DATE
C. REQUEST FOR BID.
REQUEST FOR PROPOSAL
OR REQ FOR QUOTATION
C. IDENTIFICATION NUMBER
C. DUE DATE
c.
FINAL
DATE
6. Is this a follow-on contract?
DNA001-78-C-0274
Yes
No.
If YES, complete the following:
b.
c. Accountability for classified material on preceding contract
PRECEDING CONTRACT NUMBER
DATE COMPLETED
.
7a. Name, Address & Zip Code of Prime Contractor *
SRI International
333 Ravenswood Ave
Menlo Park, CA
b. FSC Number
c. Name, Address & Zip Code of Cognizant Security Office
San Francisco, Defense Contract
Administration Services Region
866, Malcolm Road
Burlingame, CA
Ba. Name, Address & Zip Code of First Tier Subcontractor *
b. FSC Number
c. Name, Address & Zip Code of Cognizant Security Office
9a. Name, Address & Zip Code of Second Tier Subcontractor, or
facility associated with IFB, RFP OR RFQ *
b. FSC Number
c. Name, Address & Zip Code of Cognizant Security Office
*
When actual performance is at a location other than that specified, Identify such other location in Item 15.
108. General identification of the Procurement for which this specification applies
S&T Intelligence Study/Analysis
c. Are there additional security requirements established in accordance with paragraph 1-114 or 1-115, ISR?
pertinent contractual documents in Item 15.
d. Are any elements of this contract outside the inspection responsibility of the cognizant security office ?
Item 15 and identify specific areas or elements.
11.
ACCESS REQUIREMENTS
YES
NO
ACCESS REQUIREMENTS (Continued)
NO
YES
8. Access to Classified Information Only at other
contractor/Government activities.
X
k. Access to other Special Access Program information
(Specify in item 15).
1
c. Receipt and generation of classified documents
or other material.
X
m. Defense Documentation Center or Defense information
Analysis Center Services may be requested.
X
d. Fabrication/Modification/Storage of classified hardware.
X
e. Graphic arts services only.
f. Access to IPO information.
g. Access to RESTRICTED DATA.
X
h. Access to classified COMSEC information.
X
1. Cryptographic Access Authorization required.
X
12. Refer all questions pertaining to contract security classification specification to the official named below (NORMALLY, thru ACO (item 16e);
EMERGENCY, direct with written record of inquiry and response to ACO) (thru prime contractor for subcontracts).
a. The classification guidance contained in this specification and attachments referenced herein is complete and adequate.
b. Typed name, title and signature of program/project manager or other
Deputy Directorate for Scientific and
Technical Intelligence
Defense Intelligence Agency
c. Activity name, address, Zip Code, telephone number and office symbol
Defense Intelligence Agency
ATTN: DT-1A
Washington, D.C. 20301
SG1
NOTE:
Original Specification (Item 5a) is authority for contractors to mark classif
tur opberncutions (Items 5b 'and c) are
authority for contractors to remark the regraded classified information. Such actions by contractors shall be taken in accordance with the provisions
of the Industrial Security Manual.
FORM
DD 1 JAN 78 254
Approved For Release 200
EDITION OF 1 APR7/19989-FLIA-DP6-00788R082000 f8006616OBSOLETE
Yes
No. If YES, explain in
j. Access to SENSITIVE COMPARTMENTED INFORMATION.
×
b. Receipt of classified documents or other material
for reference only (no generation).
X
1. Access to U. S. classified information outside the U. S.
Panama Canal Zone, Puerto Rico, U. S. Possessions
and Trust Territories.
n.
Classified ADP processing will be involved.
X
0. REMARKS:
DOD DIR 5200.17
DOD DIR 5200.1R
SG1J
a.
8. PRIME CONTRACT NUMBER
8.
a.
ORIGINAL (Complete
date in all cases)
X
b. DoDAAD Number of Procuring Activity
identified in Item 16d.
Yes
No.
If YES, Identify the
[.] Is not, transferred to this follow-on contract.
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
13g. Information pertaining to classified contracts or projects, even though such information is considered unclassified, shall not be released for public
dissemination except as provided by the Industrial Security Manual (paragraph 50 and Appendix IX).
b. Proposed public releases shall be submitted for approval prior to release !" ] Direct
Public Release of SCI is not Authorized.
] Through (Specify):
to the Directorate For Freedom of Information and Security Review, Office of the Assistant Secretary of Defense (Public Affairs) * for review in
accordance with paragraph 50 of the Industrial Security Manual.
* In the case of non-DoD User Agencies, see footnote, paragraph 50, Industrial Security Manual.
14. Security Classification Specifications for this solicitation'contract are identified below ("X" applicable box(es) and supply attachments as required).
Any narrative or classification guide(s) furnished shall be annotated or have information appended to clearly and precisely identify each element of
Information which requires a classification. When a classification guide is utilized, that portion of the guide(s) pertaining to the specific contractual
effort may be extracted and furnished the contractor. When a total guide(s) is utilized, each individual portion of the guide(s) which pertains to the
contractual effort shall be clearly identified in Item 14b. The following information must be provided for each item of classified information identified
in an extract or guide:
(I) Category of classification. (II) Date or event for declassification of review for declassification, and (III) The date or event for downgrading
(If applicable).
The official named in Item 12b, is responsible for furnishing the contractor copies of all guides and changes thereto that are made a part of this
specification. Classified information may be attached or furnished under separate cover.
a. A completed narrative is (1)
attached, or (2)
transmitted under separate cover and made a part of this specification.
b. The following classification guide(s) is made a part of this specification and is (1)
attached, or (2)
transmitted under separate
cover. (List guides under Item 15 or in an attachment by title, reference number and date).
[_] c. Service-type contract/subcontract. (Specify instructions in accordance with ISR/ISM, as appropriate.).
d. "X" only if this is a final specification and Item 6 is a "NO" answer. In response to the contractor's request dated
retention of the identified classified material is authorized for a period of
e. Annual review of this DD Form 254 is required. If "'X'd", provide date such review is due:
15. Remarks (Whenever possible, illustrate proper classification, declassification, and If applicable, downgrading instructions).
a.
This contract requires access to SCI.
The Defense Intelligence Agency has exclusive
security responsibility for such information released to the contractor or developed
under this contract. DIAM 50-5 provides the necessary guidenace for physical, personnel
and information security measures and is a part of the security specifications for this
contract. DCASR is relieved of responsibility for all SCI material or information
released to the contractor under this contract.
b. Foreign national employees of the contractor or subcontractor(s) are not authorized
access to classified information resulting from or use in the performance of this
Contract.
c. The Contractor shall notify the COTR in writing no later than five (5) days after
receipt of the contract of the following information regarding the individuals assigned
to work on this contract.
(1)
Name
(2)
Date and Place of Birth
(3)
Social Security Number
(SEE CONTINUATION SHEET)
16 a. Contract Security Classification Specifications for Subcontracts issuing from this contract will be approved by the Office named in Item 16e below, or
by the prime contractor, as authorized. This Contract Security Classification Specification and attachments referenced herein are approved by the User
Agency Contracting Officer or his Representative named in Item 16b below.
REQUIRED DISTRIBUTION:
Prime Contractor (Item 7a)
Cognizant Security Office (Item 7c)
Administrative Contracting Office (Item 16e)
Quality Assurance Representative
Subcontractor (Item 8a)
Cognizant Security Office (Item 8c)
Program/Project Manager (Item 12b)
U. S. Activity Responsible for Overseas Security Administration
ADDITIONAL DISTRIBUTION:
17
b. Typed name and title of approving official
c. Signature
d. Approving official's activity address and Zip Code
e. Name, address and Zip Code of Administrative Contracting Office
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6
DD Form 254 (Continued)
(4) Certification of clearance investigation and clearance,
date clearance granted, and name of agency granting clearance.
c.
Final classification of the information generated under this
Contract is the responsibility of DIA (DT-1A). Information generated
under this Contract is subject to the guidelines contained in DoD
Regulation 5200.1R, dated 2 November 1978, which implements EO 12065
which became effective 1 December 1978. Technical reports classified
as high as TOP SECRET SI/SAO will be provided the Contractor by DIA
and other DoD activities, and other DoD contractors for use in
connection with this Contract. These reports may be retained for the
duration of this Contract unless no longer needed. Upon termination of
this Contract, the reports shall be returned to the sender ( if required)
or destroyed in accordance with current security regulations. If these
documents are to be retained beyond the ending date of this Contract,
written justification must be forwarded to and authorization given by
the Contracting Officer.
e.
All copies of final documents generated by the Contractor
under this Contract will be transmitted to DIA (DT-1A) for
dissemination to the Grill Flame Committee. No other distribution
is authorized.
f.
Use of the ARFCOS system is required.
Approved For Release 2003/09/09 : CIA-RDP96-00788R002000180006-6

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.