Project Interloper

CIA STARGATE release

CIA-RDP96-00788R001800040001-9

Opens with: SRI International

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

45 pages, machine transcribed from the CIA’s released scan.

1
SRI International
pproved For Release 2000/08/08 : QT
BR001800040001-9
1
Final Report
Covering the Period October 1981 to September 1982
December 1982
RV RELIABILITY, ENHANCEMENT, AND
EVALUATION (U)
TABG
RI
ational
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
1
Approved For Re
A-RDP96 0788R001800040001-9
Final Report
December 1982
RV RELIABILITY, ENHANCEMENT, AND
EVALUATION (U)
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
S
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
UNCLASSIFIED
CONTENTS (U)
LIST OF ILLUSTRATIONS (U)
V
LIST OF TABLES (U).
vii
I
OBJECTIVE (U).
1
II
INTRODUCTION (U)
3
III
RV ENHANCEMENT TASK (U) .
7
A.
Tasking (U)
7
B.
Six-Stage RV Enhancement Procedure (U).
7
c.
FY 82 Progress (U).
9
IV OPERATIONAL RV TASKS (U)
18
A.
Operational RV Tasking
18
B.
RV Session Format (U)
18
c.
Pre- and Post-Operational Task Calibration (U).
18
D.
FY 82 Operational RV Sites (U).
19
E.
Evaluation of the Operational RV Task (U)
19
V
SUMMARY OF THE FY 82 RV ENHANCEMENT TASK (U)
21
APPENDICES
A
TECHNOLOGICAL SITES USED IN STAGE IV RESEARCH (U)
23
B
OPERATIONAL TASK SUMMARY SHEETS (U)
29
iii
UNCLASSIFIED
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
UNCLASSIFIED
1
ILLUSTRATIONS (U)
1
RV Enhancement Program (U)
4
1
2
Glen Canyon Dam (U).
10
3
Radio Telescope Array; Socorro, New Mexico (U)
11
4
Sahara Oilfields (U)
12
5
Antenna Array; Lost Hills, California (U)
13
6
Copper Mine; Silver City, New Mexico (U)
14
7
Horizon National Wildlife Refuge; Wisconsin (U).
15
8
Monument Valley; Arizona/Utah (U).
16
9
Macdill Air Force Base; Florida (U).
17
V
UNCLASSIFIED
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
Approved For Release 2000/08/08 : GIA RDP96-00788R001800040001-9
UNCLASSIFIED
TABLES (U)
1
Stages in Remote Viewing (U)
8
2
Operational Remote Viewing Tasks (FY 82) (U)
20
A-1
Technological Sites Used in Stage IV Research (U).
25
1
vii
UNCLASSIFIED
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
I
OBJECTIVE (U)
The objective of the Remote Viewing (RV) Reliability, Enhance-
ment, and Evaluation Task is to develop remote viewing techniques,
Isto
enhance the potential for
applications
(U) RV (remote viewing) is the acquisition and description, by mental
means, of information blocked from ordinary perception by distance or
shielding.
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
II
INTRODUCTION (U)
SRI International is tasked with assessing the potential of RV
In this task, as defined for fiscal years
(FY) 1981 through 1983, special emphasis is placed on the possibility that
enhancement techniques can be developed that will significantly increase
levels of accuracy and reliability.
The three-year effort focuses on (1) the development of techniques
to enhance the accuracy and reliability of RV, (2) the application of RV
(3) the evaluation of such techniques and applica-
tions, and (4) the integration of RV
The apportionment of these efforts over the three-year period
is shown in Figure 1.
Investigation of the RV phenomenon at SRI International over the
past decade has ranged from basic research, where proof of the existence
of the phenomenon was at issue, to
applications, in which the
existence of the phenomenon is assumed. The present study emphasizes
applicability -- proof of the phenomenon is not explicitly pursued here.
Some pragmatic measure of demonstration of existence is provided, however,
by assessment of the quality of results obtained in
tests
carried out under the double-blind conditions.
In this report we discuss the effort for FY 1982. This effort
consisted of :
(1)
Continued development of a six-stage RV training
procedure, hypothesized to lead to improved RV
performance. Special emphasis was placed on
developing tools that were useful in differentiating
and identifying technological facilities.
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
Approved For Release 2000/08/08 + CIA-RDP96-00788R001800040001-9
INTEGRATION OF RV
-
1
EVALUATION
TASKING
DEVELOPMENT OF ENHANCEMENT TECHNIQUES
1
1981
1982
1983
FISCAL YEAR
FIGURE 1 (U) RV ENHANCEMENT PROGRAM
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
UNCLASSIFIED
10
CPYRGHT
4
2
N
Canyon downs
4
road on cliff.
aol damar
wa to gesamte
Brech
partical 5-4
UNCLASSIFIED
(a) SITE
(b) RV RESPONSE
FIGURE 2
(U) GLEN CANYON DAM, UTAH
Approved For Release 2000/08/08
UNCPA'S S973PEPS 1800040001-9
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
UNCLASSIFIED
34º 4' 43 . 497 " N
1070 37" 3.819 " W
desert. - C
aols: Hoover Dam _
Break
1
1
A tall
B Structure
5
Aangles
B Building.of.
aal dish antemas -
huge ---
1
-
#-
7
-
- +
rows of them
(b) RV RESPONSE
FIGURE 3
CPYRGHT
11
UNCLASSIFIED
(a) SITE
(U) RADIO TELESCOPE ARRAY; SOCORRO, NEW MEXICO
UNCLASSIFIED
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
... ..
.. .. .... . ... .........
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
UNCLASSIFIED
buildings -
Nor.
oil well.
ot fuld
C
5
Several wells C
Pumping- C
aof typical oil
fuld.
/ tower
1
1
1
1.
-1-
1-
+
1-
5.6 libya. and
Break
not very good
stage 45
(b) RV RESPONSE
.
SAHARA OILFIELDS
CPYRGHT
UNCLASSIFIED
(a) SITE
FIGURE 4
(U)
Approved For Release 2000/08/08
UNCLASSIFIED
A-RDP96-00788R001800040001-9
12
1
1
1
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
UNCLASSIFIED
CPYRGHT
13
--
UNCLASSIFIED
(a) SITE
liebe radio tower a. S
Hat area C
sn Stamps
(b) RV RESPONSE
FIGURE 5
(U) ANTENNA ARRAY; LOST HILLS, CALIFORNIA
UNCLASSIFIED
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
UNCLASSIFIED
CPYRGHT
32º 38'45"N
108º 21" 30'UN
14
A Lui
A flat-down flat dow flot
B- -
5-2 Barn A
County Pc
bright Of
white Pc
Gran c
Aol Buck
.
mine
/Bisbee az.
UNCLASSIFED
(a) SITE
(b) RV RESPONSE
.
FIGURE 6
(U) COPPER MINE; SILVER CITY, NEW MEXICO
Approved For Release 2000/08/08 :
UN'CLA'S'SITTER 01800040001-9
:
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
CPYRGHT
43º 34' 32 " N
A fect
Bland
5- 2 - have aFB
Green A
Cool Pc
Vast Pc
streckes cit
White CFB
Viet c
Pately c
stumpfB
Marshy area S
UNCLASSIFIED
(a) SITE
(b) RV RESPONSE
FIGURE 7
(U) HORIZON NATIONAL WILDLIFE REFUGE; WISCONSIN
UNCLASSIFIED
Approved For Release 2000/08/08 - CIA RDP96-00788R001800040001-9
UNCLASSIFIED
15
Approved For Release 2000/08/08[PS-57201800040001-9
CPYRGHT
Buttes e
tall skinny sites
large flat botond
Valley C
UNCLASSIFIED
16
UNCLASSIFIED
(a) SITE
A- flat top
down
B-large Valley
5-2 deep cFB
ande c
longa
emenge
(b) RV RESPONSE
FIGURE 8
(L) MONUMENT VALLEY; ARIZONA/UTAH
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
UNCLASSIFIED
17
CPYRGHT
27º 5%' 9'N
82° 29' 10 " W
A
Conf Breck
A long
B-
5-2
lange
flet c
hande
directionale
manmadec
Concrete c
loudnoises
HJ Bick Amelia
Blah
Morsay smelly
Busy Place
airport
UNCLASSIFIED
(a) SITE
(b) RV RESPONSE
FIGURE 9
(U) MACDILL AIR FORCE BASE, FLORIDA
UNCLASSIFIED
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
Table 2
REMOTE VIEWING TASKS (FY 82) (U)
Target
Date
Viewer
IS #23;
10/26/81
#009
J.S. #24;
10/27/81
#009
10/29/81
#009
J.S. #26;
12/7/81
#009
J.S. #27;
12/10/81
#009
J.S. #28;
12/13/81, 12/14/81,
#009
12/15/81, 12/16/81
J.S. #29;
12/14/81
#002
J.S. #30;
12/14/81
#002
J.S. #31;
12/15/81
#002
J.S. #32;
12/18/81, 1/10/82
#009
12/21/81, 1/17/82
#009 (Group)
J.S. #33;
1/7/82
#002, #622
J.S. #34;
3/1/82, 3/2/82, 3/24/82,
#002
5/5/82, 5/6/82, 5/7/82,
5/11/82, 5/18/82, 5/19/82
(U)
date, site, viewer, and so forth, along with the capability of yielding
trend analysis functions.
Approved For Release 2000/08/08 : CIA-RDA96-00788R001800040001-9
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
V SUMMARY OF THE FY 82 RV ENHANCEMENT TASK (U)
Progress in the FY 82 RV Enhancement Task can be summarized as
follows:
· RV enhancement procedure further developed.
- Special emphasis on procedures applicable to
identification of technological facilities.
- 75 RV research/training practice trials with
I. Swann.
.
Procedure transfer begun to five novice SRI staff
members and consultants.
- Orientation and practice through various levels
of Stage II.
. Procedure transfer begun to two novice
personnel.
- One RVer mid-Stage II; 53 RV training trials.
- One RVer nearly complete on Stage II; 77 RV
training trials.
· Data obtained on
Sites J.S. #23 through
J.S. #34.
· RV evaluation protocols developed.
· Computerized RV data-base management system developed
to completion (LSI 11/23 stand-alone microcomputer).
*
(U) E. C. May, "RV Evaluation Protocol (U)," Final Report, SRI Project
4028-5, SRI International, Menlo Park, CA (December 1982)
1
Approved For Release 2000/08/0821CIA-RDP96-00788R001800040001-9
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
UNCLASSIFIED
Appendix A
TECHNOLOGICAL SITES USED IN STAGE IV RESEARCH (U)
23
UNCLASSIFIED
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
UNCLASSIFIED
4
Appendix A
Table A-1
(U)
TECHNOLOGICAL SITES USED IN STAGE IV RESEARCH (U)
Date
(1982)
Site
13 Jan
Socorro, Radar Site, NM
13 Jan
Indian Point Nuclear Plant, NY
13 Jan
Cape Kennedy, FL
13 Jan
Warm Springs Dam, CA
14 Jan
Chatanika Radar, AK
14 Jan
Russellville Nuclear Plant, AK
20 Jan
Coyote Dam, CA
20 Jan
Los Banos Radar Site, CA
20 Jan
Conn-Yankee Nuclear Plant, NY
20 Jan
Lost Hills Antenna Array, CA
21 Jan
Arecibo Dish, Puerto Rico
21 Jan
Panama Canal Locks
22 Jan
Stanford Radiotelescope, CA
22 Jan
Navaho Generating Station, AZ
22 Jan
Kariba Dam, Zimbabwe/Zambia
22 Jan
Air Force Academy, CO
25 Jan
DSN Antenna, Goldstone, CA
26 Jan
Glen Canyon Dam, UT
26 Jan
DSN Antenna, Spain
26 Jan
Algeria Oilfields
27 Jan
Hebgen Dam, MT
27 Jan
Oconee Nuclear Plan, SC ...
27 Jan
Kwajalein Radar, Marshall islands !!
22 Feb
Cheops Pyramid
25
UNCLASSIFIED 3-96-00788R001
Approved For Release 2000/001
Approved For Release 2000/08/08 : CJA-RDP96-00788R001800040001-9
UNCLASSIFIED
Table A-1 (continued)
Date
(1982)
Site
24 Feb
Lindheimer Observatory, IL
26 Feb
Standard Oil Refinery, Richmond, CA
1 Mar
Gavin's Point Dam, NE
1 Mar
Edwards AFB, CA
1 Mar
Golden Gate Bridge, CA
1 Mar
Stanford Radiotelescope, CA
2 Mar
Dulles Airport, VA
2 Mar
DSN Antenna, Australia
2 Mar
Gallup National Gas Plant, NM
2 Mar
Vandenberg AFB, CA
3 Mar
Mount Isa, Australia
5 Mar
Eiffel Tower
17 Mar
Gateway Arch, St. Louis, MO
17 Mar
Houston Astrodome, TX
17 Mar
Barre Quarry, VT
17 Mar
Kitt Peak Observatory, AZ
18 Mar
Hampton Roads Bridge-Tunnel, VA
18 Mar
Bennet Dam & Portage Mtn. Plant, Br. Columbia
18 Mar
Smith-Institute Aerospace Museum, DC
19 Mar
George Washington Bridge, NY
19 Mar
Johnston Power Plant, WY
19 Mar
Bell Labs Antenna, Crawford Hill, NJ
24 Mar
Pittsburgh Civic Center, PA
24 Mar
Kariba Dam, Zimbabwe/Zambia
24 Mar
Indian Point Nuclear Plant, NY
4 May
Rondo II Radar, Palo Alto, CA
26
UNCLASSIFIED
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
UNCLASSIFIED
Table A-1 (concluded)
Date
(1982)
Site
4 May
Verrazano-Narrows Bridge, NY
4 May
Belden Dam, CA
4 May
Space Needle, Seattle, WA
5 May
Steel Plant, Aliquippa, PA
5 May
O'Hare International Airport, IL
6 May
MacArthur Bridge, St. Louis, MO
6 May
Rock Creek Dam, CA
7 May
Moses Power Plant, Niagra Falls, NY
7 May
U.N. Building, New York, NY
7 May
Rondo I Radar, Palo Alto, CA
10 May
Cresta Dam, CA
10 May
San Jacinto Monument, TX
11 May
Pahlavi Dam, Iran
11 May
Pulp Plant, Newfoundland
12 May
Chesapeake Bay Bridge, MD
12 May
Decker Mine, MT
12 May
MIT Haystack Antenna, MA
14 May
Glen Canyon Dam, UT
14 May
Erie Mining Co., Hoyt Lakes, MN
18 May
Pit 6, Shasta County Dam, CA
18 May
Terrebonne Bay Oil Wells, LA
19 May
Puunene Mill, Maui
19 May
Pit 7, Shasta County Dam, CA
19 May
American Museum of Natural History, NY
19 May
Erie Mining Co., Hoyt Lakes, MN
27
UNCLASSIFIED
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
UNCLASSIFIED
Appendix B
OPERATIONAL TASK SUMMARY SHEETS (U)
-
29
UNCLASSIFIED
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
Approved For Release 2000/08/08 -CIA-RDP96-00788R001800040001-9
SRI
International
Date
26 October 1981; 0830
Series
Session No.
1
Target No.
J.S. #23
Target
Remote Viewer
#009
Interviewer
Beacon(s)
Abstract ("Target")
Comments :
1.
Session conducted by
2.
Remote viewer and interviewer blind as to target location and
activity of interest; interviewer knowledgeable only of broad
technologies of concern.
3. Viewer gives only general description of building layout.
N.c. Put
H. E. Puthoff, Ph.D. , Radid Physics Laboratory
SRI International
$31
33Approved For Release 2000/08/08 /CIA RDP96-00788R001800040001-9
415".326-6200FTWX 910-373-1246 . TELEX: 334463 . Facsimile: : 415 326-5512
.
Approved For Release 2000/08/08 -CIA-RDP96-00788R001800040001.9
I
SRI
International
Date
27 October 1981; 0835
Series
Session No.
1
Target No.
J.S. #24 .
Target
Remote Viewer
#009
Interviewer
Beacon (s)
Abstract ("Target")
Comments :
1.
Session conducted by
2.
Remote viewer and interviewer blind as to target location
and activity of interest.
3.
Viewer described construction, a building, planned for
laboratories
N.c. Putty
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001
Laboratory
onI .
1
TA-RDP96-00788R001800040001-9
-
SRI
International
Date
29 October 1981; · 0900
Series
Session No.
1
Target No.
J.S. #25
Target
Remote Viewer
#009
Interviewer
Beacon(s)
Abstract ("Target")
Comments :
1. Session conducted by
2.
Remote viewer and interviewer blind as to target location
and activity of interest.
3. Viewer described a facility dedicated to a single purpose,
technological, high use of cooling water.
N.c. Patty
H. E. Puthoff, Ph .D. , Radio. Physics Laboratory
Approved For Release 2000/08/08-20JA-ROP96-00788R001800040001-9
SRI International
-- 115. 726-5512
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
SRI
International
Date
7 December 1981; 1012
Series
:
Session No.
Target No.
J.S. #26
Target
" ..
Remote Viewer
#009
Interviewer
Beacon (s)
Phrase "Target"
Comments :
Session carried out by
N.c. Pathof
H. E. Puthoff, Ph.D., Radio Physics Laboratory
ApproSRHInternation2000/08/08 : CIA-RDP96-00788R001800040001-9
-33 Ravenswood Ave. . Menlo Park, CA 94025 15 326-620020 TWX: 910-373-1246 . TELEX: 34463 . Facsimile: 415 326-551
=
-
-
1
Approved For Release 2000/08/08 : CIA-RDP96-00700000TO002:
1
SRI
International
-
Date
10 December 1981, 1010. (Scan 1); 1050 (Scan 2)
Series
Session No.
Target No.
J.S. #27
Target
Remote Viewer
#009
Interviewer
Beacon(s)
Phrase "Target"
Comments :
Session carried out by.
=
-
1
-
N.C. Pathof
H. E. Puthoff, Ph.D., Radio Physics Laboratory
SRWptemnationalRelease 2000/68/08 : CIA-RDP96-00788R001800040001-9
333 Ravenswood Ave. . Menlo Park. CA 94025 415 -326-6200 TWX: 910-373-1246 · TELEX: 334463 . Facsimile: 415: 326-5512
------ ----
-
-
1
1
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
SRI
International
Date
13 December 1981; 0917
Series
Session No
1
Target No.
J.S. #28
Target
Unknown locations:
12/10/81, 1000; 12/11/81, 1000, afternoon, evenir
12/17/81 (Future RV), morning, noon, dusk, evenin
Remote Viewer
#009
Interviewer
#026
Beacon (s)
Abstract (Target date A, B, C; Time 1, 2, 3, 4)
Comments :
1. List of target dates, times, given to interviewer at session
start
locations corresponding
to those dates and times requested. No further description
of task given.
2.
Remote viewer and interviewer blind as to target significance
and activity of interest.
3.
Mid-session calibration experiments with Nat'l Geographic targe
material (Stuttgart, Arkansas; Gibralter) yielded good results,
indicating remote viewer generally "on-line."
4.
In addition to descriptions of locations, viewer described an
individual (and a group) who seemed to be associated with the
locations of interest.
N.c. Patty
H. E. Puthoff, Ph.D., Radio Physics Laboratory
SRI International
36
Approved For Rétease 2000/08/08 : GIA_RDP96-00788R001800040001-9
910-373-1246 . TELEX: 334463 . Facsimile: 415 326
7
-
-
-
-
Date
14 December 1981, 1230 (Session 1); 1405 (Session 2); 1523 (Session 3)
Series
Session No.
1, 2, 3
Target No.
J.S. #29
Target
18-20 August 1981
Remote Viewer
#002
Interviewer
H. Puthoff,
Beacon (s)
CRV (Coordinate Remote Viewing)
Comments :
1.
Sessions carried out
coordinates and dates of interest
brought to session
2.
Remote viewer blind as to target location and activity of interest.
3.
On-line check calibration trials utilizing Nat'l Geographic
target materials yielded good results, indicating remote viewer
generally "on-line" for remote viewing.
4.
Remote viewer described a
training camp;
N.C. Patty
H. E. Puthoff, Ph.D., Radio Physics Laboratory
SRI International
37
333 PAYSSTOVed For Release 2000/081080 CIA RDP96.00788R001800040001-9
1326-5512
-
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
SRI
International
®
-
-
Approved For Release 2000/08/08 : CJA-ROD06.00788R001800040001-9
SRI
International
Date
14 December 1981, 1650
Series
Session No.
1
Target No.
J.S. #30
Target
Remote Viewer
#002
...
Interviewer
H. Puthoff,
Beacon (s)
Hidden picture in envelope
Comments :
1. Sessions carried out at
2.
Remote viewer blind as to identify of target person and his
activities of interest.
+
3.
Pre- and post-op calibration trials with Nat'l Geographic
.
materials (Sierra Madre and Tel Aviv, respectively) yielded
good results, indicating remote viewer generally "on-line"
for remote viewing.
4.
Remote viewer profiled subject of interest.
N.S. Patton
H. E. Puthoff, Ph.D., Radio Physics Laboratory
SRI International
38
333 Ravenswood Ave. . Menlo Park, CA 94025 ___ 415 326-6200 . TWX: 910-373-1
10046-00788R001800040004-9nile: 415 . 326-551
Approved For Release 2000/08/0
-
1
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
SRI
International
-
Date
15 December 1981, 0857
Series
Session No.
1
Target No.
J.S. #31
3
Target
Remote Viewer
#002
Interviewer
H. Puthoff,
Beacon (s)
Comments:
Session carried out at
Coordinates and date of interest
brought to session
Remote viewer blind as to target location and activity of interest.
On-line-check calibration trials utilizing Nat'l Geographic target
materials (listed below)* yielded good results, indicating remote
viewer generally "on-line" for remote viewing.
Remote viewer described a social event
with people
awaiting some event. Nothing of note (precognitively) is to happen.
Waikiki, Corrientes, Mt. Everest, Turku Archipelago,
University of Spain, Central Park, NYC. Midcheck: Bodrum.
Cape Cod.
N.C. Pathof
H. E. Puthoff, Ph.D. , Radio Physics Laboratory
-
SRI International
39
333 RaveApproved For Release 2000/08/08 TOIA RDP96-00788R00180004000 1295512
i,
-
-
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
SRI
International
Date
18 December 1981, 1445
Series
Session No.
1
Target No.
J.S. #32
Target
Remote Viewer
#009
Interviewer
H. Puthoff
Beacon (s)
Comments :
N.C. Pathfl
H. E. Puthoff, Ph. D. , Radid Physics Laboratory
ApproSRFinterelation2000/08/08 : CIA-RDP96-00788R001800040001-9
1
3.33 Ravenswood Ave . Menin Park CA 94025 . 415 326-6200 . TWX: 910-373-1246 . TELEX: 834463 . Facsimile: 415 . 326-55.
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
SRI
International
Date
17 January 1982
Series
Session No.
4
Target No.
J.S. #32
Target
Remote Viewer
#009 (Group)
Interviewer
none
Beacon(s)
Comments :
1. On 17 January 1982, RVer turned over to H. Puthoff
a compilation of inputs from RVers labeled Apple, Baker, Char
Delta, Theta, Lambda, Epsilon, and Pi. The dates of individu:
remote viewings spanned the dates 15 December 1981 - 12 Januar
1982.
2. Compilation carried
18 January 1982.
N.C. Patty
H. E. Puthoff, Ph.D., Radio Physics Laboratory
SRI International
41
333 Ravenswood Ave. . Menlo Park, CA 94025 . 415 326-6200 . TWX: 910-373-1246 . TELEX: 334463 . Facsimile: : 415| 326-5512
"Approved For Release 2000
RDP96-00788R001800040001-9
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
SRI
International
Date
7 January 1982, 0700
Series
Session No.
1, 2
Target No.
J.S. #33
Target
"Letters" author (unknown)
Remote Viewer
#002 (Participant "A"), #622 (Participant "B")
Interviewer
none
Beacon (s)
"Letters" author
Comments :
1.
Remote viewers #002 and #622 were asked to describe, and if
possible determine the location of, the anonymous author of
a series of
letters
2.
Copies of letters dated July of 1981 (2), August 1981, and
November 1981 were sent to #002
; also
hand delivered to Puthoff
15 December 1981.
on
3. The remote viewers' renderings were turned over to H. Puthoff
at SRI, who then telexed it
on
11 January 1982.
N.S. Patil
H. E. Puthoff, Ph. D. , Radio Physics Laborator
SRI International
42
333 Ravenswood Ave. . Menlo Park
Approved For Release 2000/08/085: CIA-RDP96/00788R004800040001-9
T
I
T
T
acsimile: 415 32
Approved For Release 2000/08/08 ; CIA-RDP96-00788R001800040001-9
SRI
International
=
Date
1 March 1982; 0853 (Scan 1)
Series
Session No.
Target No.
J.S. #34
Target
Remote Viewer
#002
Interviewer
H. Puthoff
Beacon(s)
Comments:
1.
Coordinates given to Puthoff
this date.
2.
Remote viewer and interviewer blind, as to target location
and target activity of interest.
3.
Calibration trials with known target materials indicated
remote viewer "on-line.
**
*
Presession calibrations: Gavin's Point Dam,
N.F. Pathol
H.E. Puthoff, Ph.D. , Radio Physics Laboratory
SRI International
43
3 .Approved For Release 2000008 SA REP96 0078800018000400019 5512
-
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
-
SRI
International
Date
1 March 1982, 1058 (Scan 2)
Series
Session No.
Target No.
J.S. #34
Target
Remote Viewer
#002
Interviewer
H. Puthoff
Beacon (s)
Comments :
1. Continuation of scans begun this date.
2.
Remote viewer and interviewer blind as to target location
and target activity of interest.
3.
Calibration trials with known target materials indicated
remote viewer "on-line."*
*
Presession, Golden Gate Bridge, San Francisco, CA; postsession,
Stanford Radiotelescope.
1
1
N.C. Pathof
H. E. Puthoff, Ph.D., Radio Physics Laboratory
App:Slel InterRatiosa2000/08/08 : CIA4RDP96-00788R001800040001-9
333 Ravenswood Ave . Mento Park, CA 94025 . 415 326-6200 . TWX: 910-373-1246 . TFI FX. 33446? . Farcimile: 415. 326-5512
Approved For Release 2000/08/08 - CIA-RDP96-00788R00180004000
SRI
International
Date
2 March 1982, 0944 (Scan 3)
Series
Session No.
Target No.
J.S. #34
Target
Remote Viewer
#002
Interviewer
H. Puthoff
Beacon (s)
CRV
-
Comments :
1.
Continuation of scans begun 1 March 1982.
2.
Remote viewer and interviewer blind as to target location
and target activity of interest.
3.
Calibration trials with known target materials indicated
remote viewer "on-line,"
*
*
Presession, Dulles Intern'l Airport, dish antenna in Australia,
Gallup, NM Natural Gas Co.
-
N. C. Pathfl
H. E. Puthoff, Ph.D., Radio Physics Laboratory
45
SRI InternationRelease 2006/08/08 .- CIA-RDP96-00788R001800040001
2157926-5512
1333 Ravenswood Ave. . Menlo Park. CA 94025
415 ,326-6200 ) TWX: 910-373-1246 . TELEX: 334463 Facsimile.
--
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
SRI
International
Date
24 March 1982, 0940 (Scan 4)
Series
Session No.
Target No.
J.S. #34
Target
Remote Viewer
#002
Interviewer
H. Puthoff
Beacon (s)
CRV
Comments :
1. Continuation of scans begun 1 March 1982.
2.
Remote viewer and interviewer blind as to target location
and target activity of interest.
3.
Calibration trials with known target material indicated
remote viewer "on-line."*
*
Presession:
Pittsburgh Civic Center; Kariba Dam, Zimbabwe.
Postsession:
Indian Point Nuclear Plant.
-
1
-
N.C. Pathof
H. E. Puthoff, Ph.D., Radio Physics Laboratory
SRI International
46
Approved For Release.2000/08/08 :GIA: RDP96.00788R001800040001-9
TELEX: 334463 . Facsimile: 415 326-55
L
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-
SRI
International
Date
5 May 1982, 0950 (Scan 5)
Series
Session No.
Target No.
J.S. #34
Target
Remote Viewer
#002
Interviewer
H. Puthoff
Beacon(s)
CRV
Comments :
1.
Continuation of scans begun on 1 March 1982.
2. Remote viewer and interviewer blind as to target location
and target activity of interest.
3.
Calibration trials with known target material indicated
remote viewer "on-line. "*
Presession:
Steel Plant, Aliquippa, PA.
Postsession:
O' Hare International Airport.
N.S. Patil
H. E. Puthoff, Ph.D., Radio Physics Laboratory
SRI International
47
333 RavApproved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
910-373-1246 · TELEX: 334463 · Facsimile: 4151 326-5512
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800020009
SRI
International
1
-
Date
6 May 1982, 0933 (Scan 6)
Series
Session No.
Target No.
J.S. #34
Target
Remote Viewer
#002
Interviewer
H. Puthoff
Beacon (s)
CRV
Comments :
1. Continuation of scans begun on 1 March 1982.
-
2. Remote viewer and interviewer blind as to target location
and target activity of interest.
3.
Calibration trials with known target materials indicated
remote viewer "on-line."
*
*
Presession: MacArthur Bridge, St. Louis. Postsession: Rock
Creek Dam.
N.c. Patal
H. E. Puthoff, Ph.D., Radio Physics Laboratory
SRI International
48
ApprovedForRelease-2000/08/08 :- GIARDR96-00788R001800040001-Fax< 15.70
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
SRI
International
Date
7 May 1982, 0931 (Scan 7)
Series
Session No.
Target No.
J.S. #34
Target
Remote Viewer
#002
Interviewer
H. Puthoff
Beacon(s)
CRV
Comments :
1.
Continuation of scans begun 1 March 1982.
2.
Remote viewer and interviewer blind as to target location
and target activity of interest.
3.
Calibration trials with known target materials indicated
remote viewer "on-line."*
**
Presession:
Moses Power Plant, Niagra Falls; U. N. Bldg., NYC.
Postsession:
Rondo I Radar Dish, Palo Alto, CA.
N.F. Path
SRI International
H. E. Puthoff, Ph.D., Radio Physics Laboratory
49
333 Ravenswood Ave. . Menlo Park, CA 94025 415: 326-6200 - TWX: 910-373-1246 . TELEX: 334463 . Facsimile: 415: 326-5512
Approved For Release 2000
RDP96-00788R001800040001-9
-
1
1
-
-
-
-
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
SRI
International
Date
11 May 1982, 0905 (Scan 8)
Series
Session No.
Target No.
J.S. #34
Target
Remote Viewer
#002
Interviewer
H. Puthoff
Beacon(s)
CRV
Comments:
1. Continuation of scans begun 1 March 1982.
2.
Remote viewer and interviewer blind as to target location
and target activity of interest.
3. Calibration trials with known target materials indicated
remote viewer "on-line."*
*
Presession: Pahlavi Dam, Iran. Postsession: Pulp Plant,
Newfoundland.
N.S. Patil
H. E. Puthoff, Ph.D., Radio Physics Laboratory
SRI International
50
Approver For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
9 0-373-1246 . TELEX 334463 · Facsimile 415 326-5512
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
-
1
SRI
International
-
1
Date
18 May 1982, 0849 (Scan 9)
Series
Session No.
Target No.
J.S. #34
Target
Remote Viewer
#002
Interviewer
H. Puthoff
Beacon(s)
CRV
Comments :
1. Continuation of scans begun 1 March 1982.
2.
Remote viewer and interviewer blind as to target
location and target activity of interest.
3.
Calibration trials with known target materials
indicated remote viewer "on-line."
*
*
Presession: Pit 6, Shasta County Dam, CA. Postsession:
Terrebonne Bay Oil Wells.
-
£
1
-
N.G. Pathof
H. E. Puthoff, Ph.D., Radio Physics Laboratory
51
SRI Internationalelease 2000/08/08 : CIA-RDP96-00788R001800040001-9
Approved Fol
333 Ravenswood Ave . Menlo Park. CA 94025 . 415 326-6200 . TWX: 910-373-1246 · TELEX: 334463 · Facsimile: 415 326-5512
·
-
-
-
-
1
Approved For Release 2000/08/08 : CIA-RDP96-00788R001800040001-9
SRI
International
Date
19 May 1982, 0901 (Scan 10)
Series
Session No.
Target No.
J.S. #34
Target
Remote Viewer
#002
Interviewer
H. Puthoff
Beacon (s)
CRV
Comments :
1.
Continuation of scans begun 1 March 1982.
2.
Remote viewer and interviewer blind as to target location
and target activity of interest.
3.
Calibration trials with known target materials indicated
remote viewer "on-line."*
*
Presession:
Puunene Mill, Maui; Pit 7, Shasta County Dam, CA.
Postsession:
American Museum of Natural History, NYC;
Erie Mining Co.
N. F. Patty
H. E. Puthoff, Ph.D., Radio Physics Laboratory
SRI International
52
333 Ravenswood Ave. . Menlo Park. CA 94025 415 326-6200 . TWX: 910-373-1246 . TELEX: 334463 . Facsimile 415 326-5512
Approved For Release 2000/08/68
6-00788R001800040001-9

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.