Project Interloper

CIA STARGATE release

CIA-RDP96-00788R001700280015-9

Opens with: STATEMENT OF WORK: PSYCHOENERGETICS

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

21 pages, machine transcribed from the CIA’s released scan.

Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
SECRET
STATEMENT OF WORK: PSYCHOENERGETICS
(THREAT TO US AND POTENTIAL APPLICATIONS)
Classified
DIAJOT-1
Declassify on
Review
21 July 2020
Extended by DLALOT
Reason 2-301-c-3546
Approved For Relbad200300RECITRDP56-0788001/60280/525-1)
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
1
SECRET
:
STATEMENT OF WORK: PSYCHOENERGETICS
( THREAT TO US AND POTENTIAL APPLICATIONS)
1. General
The objective of this effort is to investigate in detail certain
psychoenergetic phenomena that have potential military applications.
Emphasis will be on evaluating application potential and limitations of
such phenomena, and to evaluate the significance of foreign work, particularly
as it may pose a threat to the US.
Major emphasis will be on evaluating remote viewing phenomena and in
particular, targeting aspects, via coordinate or other methods. Related to
this are training methods, methods of enhancing reliability and repeat-
ability of the phenomena.
2.0 Specific Tasks (FY 81)
2.1
Train two selected Army personnel in the remote viewing technique.
2.2 Determine if speech and auditory analysis techniques can be used
to calibrate descriptions provided during operational remote viewing sessions.
2.3 Train one Army designee on tracking techniques.
2.4 Initiate studies to determine if physiological monitoring can
be used to calibrate accuracy of descriptions provided during operational
remote viewing sessions.
2.5 The following tasks will be performed to assist in evaluating
foreign work:
2.5.1 Simulate and evaluate foreign remote viewing investigations.
. 2.5.2 Describe the potential to remotely view secure facilities,
examine potential for communications, explore resolution ability, resolve
alpha-numeric targets.
2.5.3 To evaluate the potential of remote viewing as a threat to
US security and to avoid technological surprise the following tasks will
be accomplished.
2.5.4 Determine if classified data can be accessed, and determine the
limitations of remote viewing.
SECRET
ENCLOSURE 3 (S-1922/DT-1)
Approved For Release 2003/09/16 : CIA RDP96-00788R001700280
-
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
-
:
SECRET
2.6
The following task will be undertaken to explore the applications
potential of remote viewing:
2.6.1 Evaluate the use of remote viewing to locate target objects or
people.
2.6.2 Evaluate the use of remote viewing for event detection and to
locate events.
2.6.3 Evaluate the use of remote viewing for vectoring or tracking.
2.6.4 Evaluate the use of remote viewing to detect the presence or
absence of targets.
2.6.5 Evaluate the potential of camouflage, concealment and deception
as countermeasures to remote viewing.
2.6.6 Investigate the effects of the following variables on the
remote viewing phenomena. (a) accuracy. (b) degree of resolution,
(c) affect the sensory inputs (feel, smell, touch, etc.)
2.6.7 Other areas relating directly to the application of the
phenomena to operational targets would include (a) methods of enhancements,
(b) targeting aspects (coordinates, other abstracts, places names, etc. ),
(c) potential data errors, (d) training and selection of sensors.
2.7
Determine remote viewer capability to do the following:
SG1
A
2.8
It is anticipated that during all three fiscal years there will
be quick reaction tasks levied on the contractor. These will generally
be of high priority and from high levels and therefore, should receive
prompt attention.
3.0
Specific Tasks (FY 82)
3.1
The impact of the most critical variables affecting remote viewing
will be further investigated.
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
`DCT
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
-
SECRET
3.2
Remote viewing will be applied to operational targets and the
results evaluated in regard to accuracy, timeliness, types of target
and size of target.
3.3
Work on contermeasures will be continued and the detection
of remote viewers at the target will be attempted.
3.4 Apply knowledge gained in FY 81,
to real operational targets. Additional
Specific tasks Tor FY 82 will be issued in the last quarter of FY 81
and will be based largely on results of work done in FY 81.
4.0
Specific task (FY 83)
Additional Specific task for FY 83 will be issued in the last
quarter of FY 82 and be largely determined by the results of work in
FY 81 and 82.
4.1
Many of the factors that enhance or inhibit various
psychoenergetic phenomena will have been explored during the first and
second year concerning applying the phenomena to operational and intelligence
targets. During the fiscal year the emphasis will be on incorporating
and integrating the phenomena into the intelligence process.
4.2
Selection and training criteria for remote viewers will be
fully developed.
4.3 Interpretation of data derived from the remote viewing by
intelligence analysts.
4.4 Ways to integrate remote viewing data into the intelligence
cycle will be developed.
4.5 Ways and means of incorporating remote viewing phenomena into
military operations will be investigated.
5.
Specific Requirements
5.1 Approximately thirty-three (33) percent of the overall effort
should be directed to satisfying tasks on analytical techniques and
training subjects.
5.2 Approximately thirty-three (33) percent of the overall effort
should be directed to satisfying tasks on evaluation of foreign work and
specific intelligence assessments.
Approved For Release 2003109/16 : CIA RDP96-00788R001700280015-9
3
SG1
A
SG1A
I
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
SECRET
will There
be enough ?!
Not Needed
he dove COTR
5.3 Approximately thirty-three (33) percent of the overall effort
should be directed to satisfying tasks on the applications potential
of remote viewing.
6.
Security Requirements :
The overall classification is Top
Secret.
SI/SAO billets at these access levels will be required by three
personnel.
7.
Deliverables: The contractor shall provide the following.
7.1
Monthly status reports to include major accomplishments,
problems encountered and fiscal status.
7.2 Quarterly Technical Reports to highlightaccomplishments and
detail progress on the task designated for examination during the
quarter will be completed by the contractor.
7.3 A final report at the conclusion of the contract will be
submitted.
8.
The principal Contractor Monitor will be the single point of
contract for both the contractors and participants. He will interpret
the requirement to the contractor and interpret and provide the results
to the funding participants.
1. Take requirement an istated
distinti so to requests
2.
NO !
SECRET
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
4
Approved For Release- 2003/09/16 : CIA-RDP96-00788R001700280015-9
MILESTONE CHART:
NOVEL INTELLIGENCE TECHNIQUE
FY-81
($450K)
FY-82 ($450K)
FY-83
($450K)
Q1
Q2
Q3
04
Q1
Q2
Q3
04
Q1
Q2
03
04
$450K
$450K
$450K
-
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
-
2.0 Specific Task
for FY 81
3.0 Specific Task for
FY 82
4.0 Specific Task
for FY 83
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
SECRET
MISCELLANEOUS ITEMS
APPROXIMATE STARTING DATE:
Upon receipt of contract award.
A contract of 36 months' effort is anticipated with deliveries as follows :
MONTHLY STATUS REPORT: Four copies shall be submitted to the Primary
Contract Monitor no later than 10 working days after the first of each month,
for the prior month, throughout the contractual period. The initial report is
due within 10 days of the first of the month following the award of the contract.
PROGRAM PROGRESS BRIEFINGS: Briefings shall be of an informal nature and
shall be held at the end of each quarter. Specific time and place to be deter-
mined by the contractor monitor. The contractor shall furnish copies of
informal charts, viewgraphs and other aids as may be needed. The informal
briefing shall consist of a contractor presentation and informal discussion
among contractor, funding agencies and other government personnel as
appropriate.
QUARTERLY TECHNICAL REPORTS (Draft): Five copies to the COTR by the start
of each quarter for each of the specific sub-tasks.
The principal will provide
comments within 15 working days.
FINAL TECHNICAL REPORTS: Fifteen copies to the COTR no later than 30 days
after receipt of comments on technical report draft.
FINAL REPORT: Ten copies and camera ready reproducible master shall be
submitted to the COTR 30 days after receipt of DIA comments.
QUICK REACTION REPORTS: As required. Two copies will be delivered to the
COTR.
-
-
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
Nº
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
vøyą
1
ECRET
GOVERNMENT FURNISHED PROPERTY/EQUIPMENT
Government furnished property or equipment to be provided to the
contractor will primarily consist of reports, data, and documents
which will be provided on a loan basis. Contractor access to other
DIA facilities in Washington, D.C., and such other related intelligence
facilities as may be necessary will be arranged by the DIA contract
monitor.
DON'T
Understr.
why ?
INSPECTION AND ACCEPTANCE
SG1J
Inspection, acceptance, and delivery of reports will be at the
Defense Intelligence Agency, ATTN: DT-1A. Washington, D.C., 20301
Contract Monitor will be
Acceptance will be based on a determination by the Contracting Officer's
Technical Representative (COTR) that the contractor is performing in
accordance with the tasks specified in the Statement of Work.
TECHNICAL PROPOSALS
A technical proposal will be required. The originating office requires
the contractor to provide an addendum to any information required by
the contracting officer which details the contractor's methodology,
schedule, and manpower loading in meeting the contractual requirements.
Such information should be submitted to DIA/DT-1A for evaluation prior
to negotiations.
OTHER
The classification of the contract is SI/SAO. Reports issued under
this contract shall contain the following acknowledgements:
This study was supported and monitored
by the Defense Intelligence Agency of
the Department of Defense under Contract No.
GOVERNMENT FURNISHED DATA
Data required by the contractor will be requested in writing from
the COTR. The COTR will maintain a record of all government documents
transferred to the contractor and will ensure their return when the
contract terminates.
SCORET
Approved For Release 2003/09/16: CIA-RDP96-00788R001700280015-9
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
1
SECRET
IS De ARmy
NOT INSIM
Prepared to
1
fund 150ke ea yR .?
FUNDING
FY 81 - 450K
FY 82 - 450K
FY 83 - 450K
renewable
1. Contract should
le for 1 year .
SECRET
Approved For Release 2063/09/10 : CIA-RDP06-00788R001700280015-9
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
1
SECRET
ATTACHMENT 1
CONTRACTOR REPORT CONTENTS
A.
Monthly Status Report
The Status Report shall be in letter form and, generally, should not
exceed three (3) pages in length. Its primary purpose is to inform
the contracting participants of significant events, accomplishments,
and problems associated with the progress of work. The report shall
represent a narrative summary of the work underway and shall be prepared
to address the topics outlined below. Any of the topics below may be
covered noting such comments as "none", "not applicable", or "no
significant change" when appropriate. (The report shall not be used
to document technical progress or contain technical charts, graphs,
or formulas. Such data belong in technical reports.)
RESEARCH PROGRAM PLAN. A brief statement of the program's
objectives and the plan for research shall be included under this topic.
MAJOR ACCOMPLISHMENTS AND SIGNIFICANT EVENTS. A brief description
written in nontechnical terms, of any findings or accomplishments that
should be brought to the attention of the contracting agency or DIA
management shall be included under this topic. The accomplishment
of major milestones or the occurrence of technological breakthroughs
shall be reported.
5
PROBLEMS ENCOUNTERED. This topic shall include difficulties which
have affected, or could affect, the progress of the work. These would
include problem areas of management significance such as: personnel,
facilities, contracts, funds, strikes, disasters, etc. Significant
problems of the technical nature shall also be included, in brief,
nontechnical terms.
FISCAL STATUS.
1.
Amount currently provided for contract.
2.
Expenditures and commitments to data.
3.
Estimated funds required to complete the work.
4.
Estimated date of completion of work.
ACTION REQUIRED BY THE CONTRACTING AGENCY. Generally this topic
will include assistance required in resolving "Problems Encountered."
:RET
Approved For Release 2003/09/16: CIA-RDP96-00788R001700280015-9
VANtractor
by Reports
will be overcome
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
SECRET
FUTURE PLANS. A brief statement of any significant change which
is planned in the course of the work or any new item considered to
be of interest to management shall be included under this topic.
B, TECHNICAL REPORTS.
1. These reports will present a concise and factual discussion
of technical findings and accomplishments during the period. The
report should be of technical publication quality, including appropriate
subject matter reference.
2. Each Technical Report will include a report summary. This
summary, prominently identified, should normally not exceed a few
pages. The purpose of the projects must be specified, together with
a description of important equipment purchased or developed, if any,
and the conclusions reached by the contractor. The most important
single feature of this summary is that it must be meaningful to readers
who are not specialists in the subject matter of the contract.
The requirement for careful preparation cannot be overemphasized
as this summary will often provide the basis for decision on the
continuity of the project. The contractor must recognize that his
achievements are quite often surveyed by Department of Defense staff
who function at a level that precludes a thorough review of detailed
reports.
Where appropriate, references should be made to more detailed
sections of the report in order to guide those who may be prepared to
spend the additional time required to develop a more complete and
professional understanding of the accomplishments.
The report summary should include the following information for
each major portion of the work:
1.
Technical problem.
2.
General methodology (e.g., literature review, laboratory
experiment, survey, field study, etc. ).
3. Technical results.
4.
Implications for further research (if any).
5.
Special comments (if any).
Approved For Release 2001/09/18 : CIA-RDP96-00788R001700280015-9
2
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
1
SECRET
MIPR CONTROL PROVISIONS AND GUIDANCE
1.
Funds cited may be used only for the project delineated in the
attached statement of work.
2. It is estimated that for this project $450K per year for three
years is required.
3. The total MIPR estimate shall not be exceeded by the purchasing
office.
4.
. Changes in purpose, scope or desired results from those delineated
in the attached Statement of Work must be approved by the Primary
Contractor Monitor.
5.
The primary Contractor Monitor for this project is:
SG1J
0
Approved For Release Quy 109 16: CARDP 96-00788R001700280015-9
must be
*
Approved
by The
Action officers
GRILL FLAME
Committee
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
CONFIDENTIAL
NOVEL INTELLIGENCE COLLECTION TECHNIQUE (U)
JUSTIFICATION FOR SOLE SOURCE PROCUREMENT WITH
SRI INTERNATIONAL
1. (C) Sole source procurement must be initiated for the award of the contract
to SRI International of Menlo Park, CA, for FY 1981.
2. (S) In order to fulfill the objective of this Statement of Work, the contractor
is required to have a high degree of technical competence in the analysis and
evaluation of advanced threat techniques. There is no doubt that SRI has the
background and expertise desired for the specific advanced threat of interest.
SRI is a recognized leader in this particular field of analysis and evaluation,
and has performed similar work for other US Government agencies over the past
few years. Their previous work, under Contract DNA 001-78-C-0274, will form a
highly meaningful data base which will greatly enhance the value and effectiveness
of this contractual effort.
3. (C) The effort involved for a new contractor to research the same level of
capability and expertise that SRI currently possesses for this area of analysis
and evaluation would be too time consuming and uneconomical to acquire and
develop. To acquaint a new contractor in this area of expertise would require
several years simply to achieve the present level of expertise and competence
possessed by SRI.
4. (C) The performance of SRI on similar DIA, Army and Air Force contracts in
FY 1976, FY 1977, FY 1978, FY 1979, and FY 1980 is judged as outstanding, fully
justifying them as a sole source. The SRI researchers implemented numerous
innovations to maximize output of these prior year contracts, and were able to
utilize additional resources at SRI without added cost to the Government.
5. (C) The capabilities and characteristics delineated above, especially the SRI-
funded development of sources and data base, ensure that SRI International alone
has the qualifications to satisfy the requirements set forth in the Statement of
Work, especially within the compelling time frame of this contract.
Approved For Release 2010#15 ACTA-RDP96-00788R001700280015-9
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
SG1J
DIA LOGISTICS/SUPPORT PLAN
Novel Intelligence Collec-
PROJECT TITLE
tion Techniques
PROJECT SPONSOR
ELEMENT DT-1A
TELEPHONE
SG1J
Λ.
EQUIPMENT MAINTENANCE PLAN, Support Element: RTS-6
1. Internal Maintenance
a.
Personnel
b. Training (No equipment required. This is exclusively a study
contract.)
c.
Spare Parts
d.
Maintenance Facilities
e. Test and Support Equipment
f.
Technical Data
2. Contractor Maintenance
a.
Periodic prevention maintenance and repair
+
b. On call maintenance only
B.
SUPPLY SUPPORT, Support Element: RTS-6 (No supply support required.)
1. Consumables (Include complete description and estimated cost. )
-
a. Source
b. Expected Usage
c. Lead Time
d. Cube of required stocks
2. Equipment Storage
C
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
-
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
SECRET
C. EQUIPMENT TRANSPORTATION HANDLING, Support Element: RTS-6 (No equipment
required, this is exclusively a study contract. )
1. Weight and dimensions of equipment/furniture
2. Destination buildings and rooms
3. Expected delivery date(s)
D. FACILITIES, Support Element: RTS-6 (No Government facilities utilized.)
1. Utilities and dates required (power, water, air conditioning, telephone
other.)
2. Space and construction requirements and dates required
3. Location
4. Physical security
5. Health, environmental and safety implications
E. PERSONNEL AND TRAINING, Support Element: RPM-1 (No DIA personnel involved
other than contract monitor. )
1. Number of civilian and military personnel involved
2. Type and explanation of changes desired
a. New or revised civilian positions. (No new positions required.)
b. New or revised military positions
3. Required training civilian and military personnel
a. Internal
b.
Contract
4. Personnel relocations
a. Work site locations involved
b. Travel and transportation (TDY/PCS)
F. INFORMATION SYSTEMS, Support Element: RSO (No ADP equipment required.)
1. Systems concept including milestones
2. Software requirements
a. Systems design/development
b. Systems engineering
c. Data base/applications
Approved For Release2
SPOR APP96-00788R001700280015-9
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
3.
Hardware
a.
Mainframes
b.
Front end processors
c.
Terminals
4. Required funding
a. Hardware
(1) R&D
(2) Procurement
(3) O&M
b. Software
(1) R&D
(2) O&M
G.
PUBLICATIONS AND GRAPHICS, Support Element: RTS-5
1.
Publications (None required. All provided by contractor.)
Number of publications and textual pages per publication needed
b.
Processing time allowable for each publication
c. Number of maps, photographs, illustrations for each publication
2.
Briefings
a.
Number and length of separate briefings to support project
b.
Security classification of briefings
H.
COMMUNICATIONS, Support Element: RCM (No communications equipment used. )
1.
System concepts
2.
Hardware requirements
a.
COMSCC equipment
b. Communications equipment
c.
Installation materials
3.
Responsibilities/tasks
4.
Funding
SECRET
Approved For Release 2003/09/16 - CIA RDPOG
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
SECRET
5. Life cycle support
6. Training requirements
7. Tools and test equipment
8.
Manning
9.
Documentation
10.
Security classification
PROCUREMENT PLAN, Support Element: RTS-6 (Include complete description and
estimated cost.) (No procurement required. )
1. Equipment, furniture, administrative equipment (copying equipment, type-
writers, etc.)
a. Competitive sources
b. Required delivery schedule
C. Installation of equipment
d. Initial spares and components
J. SECURITY SERVICES, Support Element: RSS (DIA/DT COTR will have security
cognizance.)
1. Security clearances and security classification guidance
2.
Physical security
a. Monitor security during developmental phases
b. Other physical security requirements
3. Safeguarding information/documents (Material to be secured in existing
vaulted area by contractor.)
4.
Contractor security
a. Required classified storage (SI/SAO vaulted area) (Existing)
b. ARFCOS mailing address (N/A)
c. Access to classified data files (to be furnished by COTR)
d. Authority to publish codeword documents (Codeword studies to be
furnished by COTR)
e. Courier authority (Not allowed)
f. Required access to classified information by contractor personnel
not directly involved in program, e.g., management, marketing, purchasing personnel
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
SECRET
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
SECRET
5.
TEMPEST Security (DIAR 50-31) (Not applicable.
This is a study effort
only.)
a. Provide TEMPEST and RED/BLACK engineering guidance.
b. Assist and support Directorates in developing TEMPEST requirements
for inclusion in procurement specifications
c. Review equipment/system procurements to insure inclusion of TEMPEST
requirements
d. Arrange and monitor DIA TEMPEST tests
e. Accredit equipment/systems which are in compliance with the National
Policy on Control of Compromising Emanation
K. CENTRAL REFERENCE, Support Element: RTS-2 (No effect on existing support
provided to DIA/DT.)
1. Acquisition
2. Storage and retrieval
3. Translation
4.
Dissemination
-
Approved For Release 2003/09/16 ; CIA-RDP96-00788R001700280015-9
SECRET
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
DEPARTMENT OF DEFENSE
ACT SECURIT . CLASSIFICATION SPECIFICATION
VERFAHRENEYE OF THE DO INDUSTRIAL SECURITY MANUAL
APPLY TO ALL SECURITY ASPECTS OF THIS
EFFIAT, THE FACILITY CLEARANCE REQUIRED IS:
CONTRACT NUMBER CHUTNEY
IDENTIFICATION NUMBER
( Prime contracts trus: be shown
for all auchcontraste)
DATE TO DE
COMPLETED
THIS SPECIFICATION 13.
"See "VOTS" below. Il item & or c ta'
a!vi enter date for item a)
PRINK CONTRAST NUVDER
X
ORIGINA _ (Complete
dare in all codes)
s+ ift .-
Is for mub .ont: *: ting
bevord triving well
5. REVISEC
(supersede#
all provicy?
specificationa)
REVISION DATE
NO.
. NEO- EST FOR @'
REQUEST FOR GAS
OR RIO POA QU
IDENTIFICATION NUMBER
4. QUE DATE
c.
FINAL
DATE
In them af How-on contract :
X Yes
If YES, complete the following:
DNA001-78-C-0274
No.
13 APR 79
c Accountability for classified material on preceding contract
PRECEDING CONTAS : " NUMBER
DATE COMPLETED
1
18 18
1. to not, transferred to this follow-on contract.
Name, Address & Zip Code of Prime Contractor
SRI International
333 Ravenswood Ave.
Menlo Park, CA
b. FSC Number
c. Name, Address & Zip Code of Cognizant Security Office
San Francisco, Defense Contract
Administration Services Region
866, Malcolm Boad
Burlingame-
c. Name, Address & Zip Code of Cognizant Security Office
b. FSC Number
[c. Name, Address & Zip Code of Cognizant Security Quice
When actuel performance Is at a ictation other than that specified. identify such other location in ftes IS.
S. General identification of the Procurement for which this specification upplied
S&T Intelligence Study/Analysis
Are there additional security requirements established in accordance with paragraph 1-114 or 1-115. 15k?
pertinent contractual document . 1 !! en 15
Are any elements of this contre" curside the inspection responsibility of the cognizant security office?
"em 15 and identify spr . . fr. ... as '+ +lemen's
ACCESS RECU' REMENTS
YES
NO
ACCESS REQUIREMENTS (Continued)
YES NC
J. Access to SENSITIVE COMPARTMENTED INFORMATION.
k.
Accent to other Special Access Program Information
(Specify in item 15).
Receipt of classified d. comer's or otfor materie!
is reference toly by ferstation).
X
Receipt and generation of classified documents
or other material.
X
Fabrication/Modification / Storage of classified hardware.
X
Graphic arts services paty
X
Access to [PO information.
X
Access to RESTRICTED DATA.
X
Access to classified COMSEC information.
Cryptographic Access Authorization required.
xx
X
Pafor all questions pertaining to contract security classification specification to the official named below (NORMALLY. theu ATO (item toe)
EMERGENCY, direct with welten retard of Inquiry and response to ACO) (the prime contractor for sub: untraite).
. Twoul'as afica
mewho ! in this sen fication and attachments romance! ben
"Poty Directorate for Scientific and
Technical Intelligence
. Anse Intelligence Agency.
. Activity name attvas Zip Cole, telephone number and office symbol
Defense Intelligence Agency
ATTN: DT-1A
Washington, D.C. 20301
'SG1
SG1J
"Approved For Release-2003/09/164-CIA-RDP96-00788R001700280015-9
es sindlte alen In eccopierce alex t'te pravis. :
254
FOITION OF LAPA 71 15 COCOL CTE. . ALSO REPLACES DE FORMA 254. WHICH IS OBSOLETE
6. DoDAAli Number of Provaring Xclid
Identified in Item 96d.
Y ..
No. H YES, Identify the
XC NO. W TES. expiaăn in
Access to Classified Information Only at other
contractor/Government activities.
×
1.
Access to ['. S. classified information outside the U. S.
Panuma Canu! Zone. Puerto Rico, U. S. Possessione
and Trust Territories.
m.
Defense Documentation Center of Defense Information
Analysis Conter Services may be requested.
n. Classified ADP processing will be involved.
6. REMARKSI
po.
DATE
1. FIRST TIEN · . SCON ' RACT NO
b.
Name, Address & Zip Code of First Tiet Subcontractor
b. PSC Number
Name, Address & Zip Code of friend Tier Subcontractor, or
facility associated with IF9. ATT OR RFQ .
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
find constate it projecto even though such informationand considered and astifled, shall not be released for public
be provided by the Industrial Security Manual (paragraph Ser and Appendix I.C.
*+ 5 .britted for approval prior to releast
Euroc?
Thr. - @*
'Spe:i:y .:
ONE.
NO EXCEPTIONS
to the Directorate For Freedom of Information and Security Review, Office of the Assistant Secretary of Defense (Public Affairs) . for review in
: rendance with meregraph do of the Industrial Security Manual.
· To the case of ran Dor Ures Apertion str footnote, paragraph 50, ladas ziel Security Versd'
averit, Classification Specifications for this solicitation contract are Identified below "X" applicable box'es) and supply attachments as required).
Any narrative of classification guldetsì furnished shall be annotated or have information appended :: clearly and precisely Identify each element of
information which requires a classification. When a classification guide is utilized, that portion of the guideis) pertaining to the specific contractual
tott may be extracted and ' _mished the contractor. When a total guide(s is utilized, rach in Stardual portion of the guide(s) which pertains to the
contractual offert shall be clearly identified in Item 14b. The following information must be provided for each item of classified information identified
in an extract or guide:
1) Category of classification.
(II) Date of event for declassification or review for declassification, and ( !!! ) The date or event for downgrading
1
. If applicable).
.
The official named In Item 12b. is responsible for furnishing the contractor copies of all guides and changes thereto that are made a part of this
specification. Classified information may be attached or furnished under separate cover.
:"= A completed narrative is (1)
:X] streched. or (2) [.] transmitted under separate cover and made a part of this specification.
[b. The following classification guide(s) Is made & part of this specification and Is (!) - attached, or (2)
J transmitted under soparete
cover. (List guides under ftem 15 or in an attachment by tille, reference number and date).
.. ] Service-type contract/ subcontract. (Spectly Instructions in accordance with ISR/ ISM, as appropriate.).
Cid. "X" only if this is a final specification and Item 6 is a "NO" answer. In response to the contractor's request dated
retention of the idemsalad classified material is authorized for a period of
1 .. Annual review of this DE Farm 254 is required. It "X'd", provide date such review is due:
Remarks (Whenever possible, 'Clustern proper classification, declassification, and If applicable, downgrading instructions).
Access to compararented intelligence information will be required in performance of
the contract work. The Defense Intelligence Agency (RSS), Washington, D.C. 20301, will
exercise supervision aver Contractor's secure areas and the material held by the
Contractor. DCASR is relieved of security supervision and inspection of compartmented
intelligence material released to the Contractor. The Defense Intelligence Agency will
hake the necessary arrangements for security investigation and access authorization for
contractor personnel engaged in the performance of this Contract.
Foreign national employees of the Contractor or subcontractor(s) are not authorized
access to classified information resulting from or used in the performance of this
Contract.
c. The Contractor shall notify the COTR in writing no later than five (5) days after
receipt of the Contract of the following information regarding the individuals assigned
to work on this contract:
· (1) Name
(2) Date and Place of Birth
(3) Social Security Number
(SEE CONTINUATION SHEET)
€
Contract Security Classification Specifications for Subcontracts issuing from this contract will be approved by the Office named in Item the below, or
hy the prime contractor. as authorized. This Contract Security Classificmion Specification and attachments referenced herein are approved by the User
Agency Contracting Officer of his Representative named in item lob below.
. LQUIRED DISTRIBUTION:
Prime Contractor (Item Ta)
'X] Cognixen' Security Office (liem 7c)
Administrative Contracting Office fitem 16e)
X Quetas Assurance Representative
X. Coxelvene Security Officer (i.et Ye)
Mantyor (ltem 1 !!:
b. Typed name and title of approving official
c. Signature
1. Approving
Stats states and Zip Code
Approved For Release 2003/09/16 - CIA-RDP96-00788R001700280015-9
-
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9
DD Form 254 (Continued)
(4) Certification of clearance investigation and clearance,
date clearance granted, and name of agency granting clearance.
d. Final classification of the information generated under this
Contract is the responsibility of DIA (DT-IA). Information generated
under this Contract is subject to the guidelines contained in DoD
Regulation 5200. IR, dated 2 November 1978, which implements EO 12065
which became effective 1 December 1978. Technical reports classified
as high as TOP SECRET SI/SAO will be provided the Contractor by DIA
and other DoD activities, and other DoD contractors for use in
connection with this Contract. These reports may be retained for the
duration of this Contract unless no longer needed. Upon termination of
this Contract, the reports shall be returned to the sender (if required)
or destroyed in accordance with current security regulations. If these
documents are to be retained beyond the ending date of this Contract,
written justification must be forwarded to and authorization given by
the Contracting Officer.
e.
ATT copies of final documents generated by the Contractor
under this Contract, except those retained by the Contractor, will be
transmitted = DIA (DT-1A) for further dissemination. No other
distribution is authorized.
Approved For Release 2003/09/16 : CIA-RDP96-00788R001700280015-9

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.