Project Interloper

CIA STARGATE release

CIA-RDP96-00788R001500120001-3

Opens with: LTC Brian Buzby

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

3 pages, machine transcribed from the CIA’s released scan.

.
Approved For Release 2093/09/09 - CIA-RDP96-00788R001500120091
SRI internatio
ional
Memo
23 185
To :
LTC Brian Buzby
From :
Location : G-219
Subject :
28 February 1985 Buzby Letter, Reply to
Cc :
H. Puthoff
In response to your review of FY'84 projects, and possible variances between SRI performance and
contractual requirements, I have looked over the final reports with regard to contract requirements,
and I am satisfied that all requirements have been satisfactorily met and fulfilled. The following
point-by-point summary should provide clarification of the elements in question.
ESU 83-134, reference the possibility that Phases I and II were only partially accomplished and Phase
III not conducted: In Phase I, personality testing was applied to proven RV personnel in SRI and
client programs as required, the SRI (and other) viewers listed in Table 1, p. 14, the client viewers in
Table 4, p. 21. Discussion as to profiles to identify personnel for RV aptitudes are provided in Section
V, pp. 13-25. Thus, the requirements for Phase I were met in full. In fact, following the close of the
effort, profiling of an additional ex-client RVer was arranged, and this data will also be provided in an
addendum to provide the client with as complete a data base as possible.
In Phase II, SRI was to compare self-report testing against the identified PAS profiles to determine
the accuarcy of such "self-report" pre-screening materials. The MBTI (self-report) test results listed
in Tables 3 and 4, and the accompanying discussion, satisfy this requirement. The study concluded
that this most promising self-report test (MBTI) was inadequate to the task. As to the second part of
the Phase II requirement (to apply identified profiles against a general test population to segregate
talented from untalented RVers), and the Phase III requirement to then test these against actual RV
targets, this activity was carried out with a group labeled SRI RV trainees (Table 3, p. 20); the
predicted best-profile RV trainee (#807) yielded the best test results, with lesser results provided by
individuals with profiles associated with nonpredicted RV performance. Thus, the Phase II and III
requirements were also met.
ESU 83-145, reference that the final report did not include separate enclosures for each trainee with
requested information: I have examined the S.O.W. in detail a number of times and have failed to
find any statement concerning separate enclosures. If the intent of the reference to such is that the
track records of individual trainees be differentiated one from another, this is provided to the degree
it can be in Tables 2-4, which indicate the levels of individual-trainee efforts to achieve mastery of
each of the Stages, I-III. Beyond level-of-effort required, no further differentiation can be made, in
that all trainees achieved the skill plateaus expected with little difference in reliability/accuracy.
ESU 83-147, reference that the final report did not contain a summary of literature search, nor data
on the lack of investigation of weather and lunar cycles: It is the case that no separate summary of the
literature search was provided; rather, references to and discussion of relevant findings were simply
noted where appropriate in the text and an extensive (125-item) bibliography provided for further
detailed reading.
Approved For Release 2003/09/09 : CIA-RDP96-00788R001500120001-3
Date :
15 April 1985
SG1J
SG1J
Approved For Release 2003/09/09 : CIA-RDP96-00788R001500120001-3
With regard to the list of items suggested for investigation in the S.O.W. (which included weather and
lunar cycles), it was assumed that the named items were representative but not exclusive of areas of
investigation to be pursued. Once the research was underway, it was SRI's considered scientific
judgment that detailed investigation of solar flare activity (not included in the original list) was more
likely to provide data of note (as it did) than could be obtained from an analysis of weather and lunar
cycles. Therefore, given the fixed-level-of-effort nature of the contract, this substitution was made,
and, given the results, it appears to have been a most profitable choice given the overall goal of the
task.
ESU 83-144, reference no specific recommendations or proposal for a training program: The results
of the investigation showed that although search strategies of several types yielded significant positive
results, it would be premature to lock on to a specific training technique to the exclusion of others at
this point, as several of the contenders showed remarkable potential. Since they are so different, one
from another (computer "mouse" dowsing, spatial/temporal computer search, map dowsing with
physiological-sensation-in-fingers approach, one-shot versus statistical averaging approaches, etc.),
there is no clear-cut way to integrate them into an amalgamated training regimen; hence, the
recommendation for further investigation of the alternative techniques before recommendations as to
a specific training program.
Reference the requirement to provide a list of equipment purchased in support of the contract:
Attached is a printout of purchases on the contract, which total $62,647.30. In addition, a number of
purchases were made by SRI (but not charged to contract) in order to pursue contract activities at the
SRI/NY office. These items are as follows:
0
5 Gray chairs cube-shaped
1 Edison fan
8 Chairs, cane webbed
1 Panasonic portable cassette tape recorder, Model RQ-2103
1 Pollenex Pure Air "99"
4 Light tracks
15 Light heads for track lighting
1 Sofa, off-white
1 Loveseat, off-white
2 Secretarial chairs, dark gray
9
2 2-drawer file cabinets
1 Podium, gray
1 Table, gray
1 Table, natural wood
I trust this provides the clarification sought with regard to possible variances between S.O.W.s and the
final reports. If further details are required, please let me know.
Approved For Release 2003/09/09 : CIA-RDP96-00788R001500120001-3
-
PY09
( PROG: SPY/D/0180)
PROJECT-PROPERTY INVENTORY
DATE 03-05-85
PAGE
364
PROJECT-06600
0
TAG NO SFX .NO U N ..
SYSTEM CDE
.. MODEL ... SERIAL NUMBERT
HUNDER
AGENCY:CD NK TAG
NAME
YR SITEBLGWFROOM IST CLS VCHR CUR DATE
73 0001
02/84
22,407.00
610
Y
05550
G 004 35793
CONTROLLER
5101-00
0-8837 EQUATORIAL COMM 83 885
6625
GA
33
0002
02/84
2.975.00
610
610
x
=
G 004 35796
PRINTER. A
DP
82162A
2228587315 HEWLETT-PACKARD 85 001
7025
G
219
GN
73
0006
03/84
37%-20010
610
x
G 00435805
AIR PURIFI
G435805MON
E
UA
NONF UNASSIGNED
4460
36 013
GA
33
0004
03/84
149.95
610
610
6 004 35813
NED V5.20
OPE
G1166
48405 GERBRANDS
6730
84 001 ₽ # 111
GM
33
0009
08/84
4.490.00
610
610
6 00435826
COMPUTER,
PERSONAL
PC JR
0067-0029406 :0M
84 888
GN
73
0010 07/84
1,039.00
610
610
6 004 35827
COMPUTER,
PERSONAL
PC JR
0067-0032564 TRĄ
34 888
6N
73
0010 07/84
1.039.00
610
X
JA
7042
610
6 004 35828
COMPUTER.
PERSONAL
PC JE
0067-0056212 1RM
7042
84 888
GN
73
0010
07/84
1.039.00
610
610
X
UA
6 004 35853
ANALYZER
4202
284842 CANBERRA IND
6625
84 001 P N 111
33
0008
06/84
14.631.35
610
610
G 004 35905
PRINTER
IPVII
84050014 INTERLEAF
5860
84 001 G
220
GM
33
0010
08/84
14.500.00
610
610
X
*** TOTAL NO. OF ITEMS-
10
*** TOTAL ACQUISITION COST
62.270.30-
62,641.50
FOOTNOTE: * DENOTES THAT THE PURGE DATE HAS BEEN SET
₹
120
UA
2444P SUN MICRO SYS.
7010
83 001
6
220
G
610
UA
0
..... ACQUISITION ..
.
COST
USE
6 006 35791
COMPUTER.
DIGITAL
UA
x
X
UA
UA
7042
G
0
UA
. .. MANUFACTURER ... ... LOCATION .. P TP FIN PROP
AORG ACCT!
UORG
Approved For Release 2003/09/09 : CIA-RDP96-00788R001500120001-3

Follow along