Ing. Contract
Aug 6-10, 1984
MEMO TO Hal
FROM
I .Swann
Subject: Stage 1 training completions (Preliminary report)
All four client-selected trainees who had embarked on S-1
at the beginning of the year, finished S-1 on or about July 20, 1984.
The greater part of the training took place at the New York office.
Each of the trainees achieved competence in learning the technicalities
of S-1. The training was enthisiastically received. Each wished to
go on to S-2, which, at this writing, has already commenced.
File
In terms of the quantity of simulated sites that were necessary
for each trainee to achieve S-1,
The following takke chart illustrates the number of simulated
sites that were necessary for each trainee to achieve S-1:
S1
S-1, phase one
S-1, pase two
TOTAL
CC:
26
26
43
69
BR
26
49
35
PS
48
48
87
ED
49
49
99
Total simulated site sessions
340
The large overal count of necessary simulated training sites is
somewhat in excess of what we expected.
Our expectations, and thus the
DRAFT
Approved For Release 2001/04/02 : CIA-RDP96-00788R001500110034-8
SRI 1970 8/79
1
DRAI
pproved For Release 2001/04/02 : CIA-RDP96-00788R001500110034-8
estimated timing for S-1 that was indicated in our proposals, was
somewhat less. This time requirement was based upon the work of five
previous trainees in the original prototype project, which was
terminated in November 1983.
The amount of simulated sites necessary
for these five to complete S-1 is as follows:
S-1, phase one
S-1, phase 2
Total
MA
35
16
51
JT
29
18
47
HP
15
28
43
JV
48
27
Total simulated site sessions
216
75
.
In addition to these five prototype trainees above, our estimation
of time and sites necessary to achieve S-1 also rested upon the overall
results of two preciomeke earlier client selected trainees, as follows:
S-1, phase one
S-1, phase 2
Total
TM
28
25
53
RC
28
26
54
·
Total simulated site sessions
107
The averages for the three groups are as follows:
Five prototype trainees:
54
sites necessary
First cliented selected group
53
sites necessary
Second client-selected group:
85
sites necessary
All three training programms were dilivered exactly the same, with
the same orientation and theoritical lectures, and the same coaching and
instruction during practical work, modified only by having to take into
account the individualities of each trainee, as has been our policy.
In fact, the environment af in which the last group worked was much
different from the environment at SRI in Menlo Park, due to the fact
that there were no upsets at all, and the environment was benign and
peaceful.
DRAFT
Approved For Release 2001/04/02 : CIA-RDP96-00788R001500110034-8
:
SRI 1970 8/79

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.