November 1981
FY'81
DOD
GRILL
FLAME
PROGRESS
REPORT
SG1J
Prepared by:
Presented at :
End-of-Year GRILL FLAME Meeting
Defense Intelligence Agency
25 November 1981
WARNING NOTICE - Intelligence Sources
and Methods Involved
CLASSIFIED BY:
DIA-DT
REVIEW ON :
20 November 2001
SRI/GF-0004
This document consists
of 77 pages.
Copy No.
9
ARMY review
completed
DIA review
completed.
SECRET
- NOT RELEASABLE TO FOREIGN NATIONALS -
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
DOD GRILL FLAME PROGRESS REPORT
TABLE OF CONTENTS
I
PROGRAM STATUS
1
II
PROJECT TASK
·
14
III
CONDENSED PROJECT RESULTS REPORT
.
50
IV
OPERATIONAL REMOTE VIEWING TASKS (FY'81)
.
64
V
INTELLITENCE SUMMARY
72
·
VI
GRILL FLAME FINANCIAL STATEMENT.
74
ii
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
I
PROGRAM STATUS
End-of-Year (FY'81) Grill Flame Progress Report
1.
Introduction
We have now completed FY'81 and are ready and anxious to begin work
on the FY'82 projects. In fact efforts have already begun on some of the
tasks. Before we proceed, however, we should reflect on the FY'81 work.
It is not necessary to review all the problems but we should take note that
the problems did take their toll. As a result we are not as far along in
the program as we had hoped.
This program was initially perceived as having the following
characteristics (see Figure 1) :
A three-year contract
· Adequate funding
· Timely funding
On-site monitor
The idea was to give the researchers time enough, money enough and the
security needed to accomplish the task we proposed. We succeeded with
adequate funding and an on-site monitor but failed to provide the other
two. By far, the most damaging was the lateness of FY'81 funds. There
is no need to recount the ups and downs of the FY'81 budget as many of you
were instrumental in helping solve the problems.
So much for what we did not accomplish. A more pleasant activity is
to look at what has been accomplished.
· Training (Figure 2)
.
Intelligence (Figure 3)
1
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1 I
CONFIDENTIAL
PROGRAM
AS
INITIALLY
PERCEIVED
1.
THREE
YEAR
CONTRACT
2.
ADEQUATE
FUNDING
2
FIGURE 1
3.
TIMELY FUNDING
4.
ON-SITE
MONITOR
CONFIDENTIAL
-
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1 I
RV
ENHANCEMENT
PROGRAM
(PROGRESS, FY'81)
. CRV ENHANCEMENT PROCEDURE DEVELOPED
BY
25X1
- RESEARCHED ALL 6 STAGES
- OVER 200 CRV PRACTICE TRIALS
- GOOD
RELIABILITY THRU STAGE 3,
INTO STAGES 4 & 5
00
FIGURE 2
.
PROCEDURE TRANSMITTED BY SWANN TO 3
EXPERIENCED
REMOTE VIEWERS
- OVER 60 CRV PRACTICE TRIALS EACH
- GOOD RELIABILITY THRU STAGE 3
·
PROCEDURE TRANSMITTED TO 1 NOVICE REMOTE VIEWER (END FY'81)
- OVER 50 CRV PRACTICE
TRIALS
- GOOD
RELIABILITY THRU STAGE 2
-
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SG1B
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Page Denied
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
· Audio Analysis (Figure 4)
· Targeting (Figure 5)
· DBM System (Figure 6)
· Countermeasures (Figure 7)
In terms of the three-year plan, the first year (FY'81) was to look
at several of the variables. Enhancing remote viewing through training
was one of the more important tasks. This will be necessary if the tech-
nology is transferred to the DoD and used on a large scale. During the year,
three people received the training and indications are that they indeed
improved their reliability.
In the targeting program, coordinate, beacon
and associational methods were investigated. This work has only just been
completed and the results will be available in the year-end technical
report. In the audio analysis task a method of discriminating between
good and bad data was sought. The results of this work will also appear
in the final technical report.
Preliminary evidence suggest that it is
a person specific response.
To conclude, you should have copies of both my adminstrative report
and a technical report on each of the tasks.
FY'82 Program
1.
Introduction
It is still the goal of the FY'82 program to establish a highly
reliable operational capability. Thus far, the funding has been
better than last year and funds are currently available for FY'82 work.
The FY'82 SOW calls for at least three remote viewers to be trained to a
level that is acceptable for operational tasks. To do this work on the
development of RV enhancement will continue. Concurrently Army will be
sending training candidates for Stages I through III to SRI to be trained.
5
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
---
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1 L
CONFIDENTIAL
AUDIO
ANALYSIS
HIGHLIGHTS
6
FIGURE 4
· EXISTING DATA BASE WAS REANALYZED
. A TARGET-INDEPENDENT
AUDIO /LINGUISTIC
MEASURE
CORRELATES WITH RV ACCURACY
CONFIDENTIAL
-
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1 I
TARGETING
TASK:
TO INVESTIGATE TARGET ACQUISITION STRATEGIES, INDIVIDUAL
DIFFERENCES RELATED THERETO
TARGETING MODES UNDER INVESTIGATION:
· BEACON/PHOTOGRAPH
7
FIGURE 5
· COORDINATES
· ABSTRACT
STATUS:
TASK NOT YET COMPLETED
(AUGUST START DATE)
DATA COLLECTION COMPLETED (48 TRIALS FROM 4 RVers)
PRELIMINARY SCAN OF DATA INDICATES THAT:
. 3 OF 4 RVers APPEARED TO EXHIBIT RV FUNCTIONING
. POSITIVE RESULTS WERE OBTAINED TO SOME DEGREE
IN ALL CONDITIONS
CONCLUSIONS AWAIT DETAILED ANALYSIS
-
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
I
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
CONFIDENTIAL
DBMS FEASIBILITY --- HIGHLIGHTS
CO
FIGURE 6
1.
OFF-THE-SHELF SYSTEMS INADEQUATE FOR COMPLETE RV ASSESSMENT
2.
DBMS DEVELOPMENT LANGUAGE IDENTIFIED
(FORTH)
3.
TURN-KEY DBMS IDENTIFIED FOR A SPECIFIC TASK IN CRV RELIABILITY
PROGRAM
-
CONFIDENTIAL
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
-
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
COUNTERMEASURES
HIGHLIGHTS
(1)
LITERATURE SEARCH (1970-1980) FOR EVIDENCE
OF MENTAL INTRUSION
9
FIGURE 7
(2)
SUGGESTED
POSSIBLE
COUNTERMEASURES
RV -- INTRUSION DETECTION
- RANDOM NUMBER
GENERATORS
- TEMPERATURE MEASURING DEVICES
RP -- DISTANCE
EFFECTS
-
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
i
However, before we get too far into plans for FY'82 work we should
again look at the historical factors that drive our FY'82 program and take
a look at the missions of the sponsors. Both the FY'82 and the FY'83
programs are firmly based upon these missions.
FY' 82 Grill Flame Program
1.
History
In April 1980 it was determined that there should be a joint DoD
program in the Grill Flame area. In FY'81 the participants were DIA and
INSCOM. The two organizations had different goals and these two sets of
goals made for a very rocky year.
The two sets of goals were:
(1)
DIA -- Increase the reliability of remote viewing and
explore training people to do remote viewing.
(2)
INSCOM -- As they already had an in-house capability they
wanted to examine several variables that would lead to
improving their operational data.
These two goals led to separate tasks during FY'81. DIA placed most
of its resources in the RV enhancement task and Army supported work on
targeting and audio analysis.
2.
Mission (DIA)
At this time it would be appropriate to look at how the missions of
DIA and Army relate to the Grill Flame objectives. The DIA essentially
has, in this regard, three objectives (Figure 8).
(a)
Prepare for developing in-house capability
(b)
Countering the application of psi phenomena
against the United States.
(c)
Follow development of psi in foreign countries
10
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
B
CONFIDENTIAL
GRILL
FLAME
PROGRAM --- DIA
IN-HOUSE
EFFORT
INTELLIGENCE
PROTECT
USSR
RV ENHANCEMENT
FY'81
COUNTERMEASURES (FY'82)
11
FIGURE 8
FY' 81
CHINA
FY'82
i
ACQUIRE DATA
RV EVALUATION
DBM
DBM
( INTELL)
FY'82
OPERATIONAL SITES
FY' 82
AT LEAST TWO MORE
UNDETERMINED STUDIES
DURING FY'82
CONFIDENTIAL
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
STUDIES
FY'82 --- ARMY
L
L
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECKEI
3.
FY'82 Program as it Applies to these Missions
(a) In-house operational unit
(1)
Devise a training method
.
Part of DIA FY'81 program
. Part of Army FY'82 program
(2) Develop data handling system
.
Part of DIA FY'82 program
(3) Develop evaluation methodology
·
Part of DIA FY'82 program
· Needed to answer, should we?
·
Needed to provide a constant check on how the
program is functioning.
(b)
Guard against phenomena being used against the United States
(countermeasures ) .
· Explored in FY'81 program
· Will be further explored in FY'82 if funds are available
(c)
Intelligence
(1)
Intelligence production
.
USSR study prepared in FY'81
China plus others will be produced in FY'82
(2)
Automated intelligence file
· Quantitative examination of foreign work in
the psi area.
4.
Mission (INSCOM) (Figure 9)
Improve RV of operational targets.
(a)
FY' 81
· Targeting
· Audio Analysis
(b) FY'82 - Training
.
12
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
1
CONFIDENTIAL
GRILL
FLAME
PROGRAM --- ARMY
IMPROVE
EXISTING
CAPABILITY
13
FIGURE 9
TARGETING
(FY 81)
AUDIO
ANALYSIS
(FY 81)
TRAINING
(FY'81) -- DIA
(FY'82)
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
CONFIDENTIAL
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
II
PROJECT TASK
The tasks completed in FY'81 were:
. RV Reliability and Enhancement Evaluation
.
Intelligence Assessment -- USSR
· Database Management Feasibility
·
Countermeasures
· Audio Analysis
· Targeting
Project task sheets describing these projects are included in this report.
Personnel, financing, project description and results are included in the
task sheets.
:
14
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
!
SGFOIA2
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Page Denied
Next 2 Page(s) In Document Denied
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
DEVKEI
Attachment #1
Statement of Sponsor's Expectation
1.
Improve, through practice, the reliability of remote viewing.
2.
Work with selected individuals to gain better and more reliable
data from remote viewing sessions.
3.
Continue research on any facet of remote viewing that offers promise
of being improved by training.
4.
Work toward the development of a training program that will accommodate
future DoD needs.
18
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Attachment #2
Verbal Description of Project
SRI International is tasked with working toward the development of
training procedures that will accommodate future DoD needs. Under investi-
gation is a training procedure developed by an SRI remote viewer consultant,
The procedure focuses on improving reliability of remote viewing
25X1
by controlling those factors that tend to introduce noise into the RV
product.
The
procedure is based on the observation that, with the appli-
cation of a "stimulus" (e.g., the reading of a coordinate) there appears
to be a momentary burst of "signal" that enters into awareness for a few
seconds and then fades away. It is at this point that imagination appears
to be triggered to fill in the void, producing noise due to associational
and analytical overlays.
25X1
The techniques designed to handle the above noise problem involve (a)
repeated coordinate presentation and quick-reaction response on the part
of the remote viewer to minimize imaginative overlays, (b) the use of a
specially-designed acoustic-tiled featureless room with homogeneous coloring
to minimize environmental overlay, and (c) the adoption of a limited monitor
role behavior to minimize monitor overlay.
The training proceeds through a series of six stages of proficiency,
hypothesized to correspond to six stages of increasing contact with the
target site. These are outlined in the following table.
19
SECRET
-
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
Stage
Example
(1)
Major gestalt
(2)
Sensory contact
(3)
Dimension, motion, mobility
(4)
Quantitative aspects
Land surrounded by water, an island
Cold sensation, wind-swept feeling
Rising up, a panoramic view
Three large buildings, clustered
together as a facility
(5)
Special qualitative aspects
Scientific research, live organisms
(6)
Significant analytical aspects
Scientific research, live organisms
BW preparation site
During FY'81 these procedures under development by
are being
25X1
transmitted in theory classes to three other experienced project remote
viewers, Nos. 009, 131 and 504. In addition, all four remote viewers
participate in practice sessions consisting of extensive targeting on
sites around the world by coordinate remote viewing (CRV), with feedback
being given on the basis of material available from National Geographic
magazines, world aeronautical charts, etc. Both the program leader
25X1
and DIA COTR
observe the theory class and act as monitors for
several of the RV sessions in order to monitor the progress of the training
program.
"Exams" on the progress of the training program are then provided
by operational RV tasks (see Section III) .
25X1
20
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
E
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
Attachment #3
Project Diary (major developments)
1.
Continued improved results are forthcoming from the training
sessions.
2.
Three viewers trained through Stage III.
3.
First novice trained produced exceptional results.
4.
Deeper insight into the RV phenomena is being accomplished in the
training/research.
21
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SGFOIA2
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Page Denied
Next 2 Page(s) In Document Denied
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECKEI
Attachment #1
Statement of Sponsor's Expectation
Review current literature and report findings.
Report will form the
basis for an expanded effort in the next fiscal year.
--.
25
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
Attachment #2
1.
Short Verbal Description
SRI International was tasked to conduct an exploratory investigation
on possible RV countermeasures. For FY'81 the entire effort consisted of
scientific critiques of pertinent literature, including :
· Assessment of the various proposed physics models
of psychoenergetic functioning with regard to their
respective countermeasure potential.
· Critiques (from a possible intrusion perspective) of
the papers that claim the existence of psychoenergetic
effects on physical devices.
2.
Summary of Completed Work
On a separate program, we completed a literature search on random
number generator (RNG) experiments. In more than 10 years of such
experiments, it has been claimed that individuals are able mentally to
influence RNG devices. A critique of these papers remains to be completed.
3.
Current Status
Task completed.
1
26
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SGFOIA2
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Page Denied
Next 2 Page(s) In Document Denied
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
Attachment #1
Statement of Sponsor's Expectation
Develop concepts and materiel to determine if RV data base can be
computerized for easy access and manipulation.
30
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
.. ....
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
Attachment #2
1.
Short Verbal Description
SRI International is tasked with developing a database management
system (DBMS) that is applicable both to operational RV data and to RV
target management.
TEMPEST
A DBMS is a stand-alone computer program that allows a user to design
easily a management tool. The resulting system consists of English
language instructions that are tailored to the particular application.
While it is possible to ascertain interesting trends by casual
examination of the raw data transcripts, this type of informal inspection
does not easily provide detailed, multi-variable analysis. A DBMS will
optimize further collection assignments, and enhance proper utilization
of RV'er resources.
In an operational RV DBMS application, client analysts will complete
assessment sheets similar to the prototype shown in Table 1. Then, a
data entry person will enter this information into the computer in an
identical format.
A program manager will then be able to access this data and to view
it from a wide variety of different perspectives, by means of sorting and
logical searching routines.
31
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
:
SG1A
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Page Denied
Next 10 Page(s) In Document Denied
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECREI
T
I
Attachment #1
Statement of Sponsor's Expectation
Develop audio analysis techniques that can, under operational conditions,
separate the correct from the incorrect statements concerning data available
from taped viewer descriptions of remote viewing problems.
43
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
€
Attachment #2
1.
Verbal Description of Project
The goal is to separate correct from incorrect data available from
taped viewer descriptions of remote viewing sites, through the use of
semantic (linguistic) and audio analysis techniques, and to provide
selective editing under operational conditions. The a priori identification
2
of correct and incorrect data on the basis of gating by pre-established
audio and semantic indicators of accuracy could provide increased reliability
from RV data.
Persons experienced in interviewing subjects in remote viewing ex-
periments have observed that affect, tone, and certain linguistic patterns
in speech behavior of a given subject varies from session to session and from
moment to moment within a session.
Interviewers often express the opinion
that they make use of such clues in forming an early impression of the
probable accuracy of the comments made in a particular session or in
particular parts of a session.
Such an impression is often confirmed by
feedback.
The study proposed here is specifically directed at finding measures
of speech behavior that are correlated with the accuracy of a remote
viewer's comments.
44
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
i
SGFOIA2
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Page Denied
Next 2 Page(s) In Document Denied
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
Attachment #1
Statement of Sponsor's Expectation
Develop techniques which will indicate what is required for target
acquisition and whether or not these techniques or abilities are individual
in nature.
.
48
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
:
Attachment #2
1.
Short Verbal Description
We have carried out a four-month study to investigate the subject of
target acquisition.
In this study both what information is necessary
for target acquisition, and whether there are individual differences with
regard to this factor, are of interest.
Three targeting modes are under investigation:
beacon/photograph
targeting, where the viewer is given a photograph of a person (otherwise
unknown to him) located at the site; coordinate targeting, where the
viewer is given geographical coordinates of the site to be described; and
abstract targeting, where the viewer is simply told that a site exists which
needs a description. As tenuous as the latter two approaches may seem to be,
there is evidence in the field that results can be obtained under such con-
ditions.
Data collection has been (48 trials from 4 remote viewers) completed.
A preliminary scan of the data indicates that 3 of the 4 remote viewers
appeared to exhibit RV functioning, with positive results being obtained
to some degree in all conditions.
Precise conclusions, however, await detailed analysis.
49
:
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
III
CONDENSED PROJECT RESULTS REPORT
50
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
. ...
:
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
END OF YEAR REPORT
PROGRAM:
RV RELIABILITY, ENHANCEMENT, AND EVALUATION
1. Sponsor's Expectation
SOW Reference
Experiments
Results
Improve, through practice,
the reliability of remote
viewing (RV).
2.3.4, 2.3.5
2.3.6, 2.3.8
2.3.9, 2.4
CRV training leader
worked on developing six-stage
training procedure under inves-
tigation, by himself serving as
RVer for over 200 training
trials on sites from around the
globe. Data for feedback and
analysis provided by Nat'l
Geographic materials, World
Aeronautical charts, etc.
All six stages researched.
In RV training trials, high-
reliability data obtained
through Stage 3; reliability
through Stage 5 increasing with
effort.
SECRET
51
Work toward the development
of a training program that
will accommodate future
DoD needs .
1.
Use of repeated coordinate
presentation and quick-
reaction response to mini-
mize imaginative elaboration
overlay.
2.
Use of acoustic-tiled homo-
geneously-colored feature-
less room to minimize en-
vironmental overlay.
3.
Adoption of a strictly-
proscribed limited monitor
role to minimize monitor
overlay.
The generation of shorter
transcripts with higher signal-
to-noise ratios, and increasing
reliability by all RVers appears
to confirm that approach pro-
vides a workable methodology
for handling sources of noise,
and improving accuracy and
reliability.
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
25X1
Work with selected indi-
viduals to gain better and
more reliable data from
RV sessions.
Continue research on any
facet of RV that offers
promise of being improved
by training.
The procedures developed to
handle "noise" in RV converged
to:
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
2.
In addition the following discoveries were made:
(a)
The multistage approach to data acquisition inherent in the training procedure under study appears to
be successful in "slowing down" the incoming data, thereby providing some safeguard against natural
tendencies toward premature interpretation and analysis on the part of the RVer.
(b)
The use of pre- and post-operational session "Nat'l Geographic" calibration trials appear generally
to provide useful indicators for bracketing the quality of data obtained in the operational task.
(c) Knowledge of the hypothesized multistage process of site acquisition appears to provide some predictive
value with regard to the quality of RV result, in that data not emerging in the staged order tends to
have a higher percentage of overlay.
3.
Based upon the sponsor's stated needs and our discoveries during the fiscal year a program for FY'82
was developed.
SECRET
53
FY'81 Program
Results
FY'82 Follow-On
Six-stage training
process in development
Progress observed as noted
above.
RVers trained through
various stages
Techniques transmitted, with
apparent increase in accuracy
and reliability.
Continue RVer training, especially with
inexperienced viewers, to determine efficacy of
proposed approach.
RVer outputs examined,
first-generation evalua-
tion sheets developed
Beginnings of quantified
analysis of RV product.
Operational tasking begun
Useful results obtained
Continue development through Stage 6
SECRET
Develop in-depth evaluation procedures for quan-
tifying RV product, and for checking effects of
unknown parameters (e.g., effects of feedback or
lack thereof.)
Increase operational tasking to obtain measures
of accuracy and reliability "in the field."
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
END OF YEAR REPORT
PROGRAM:
RV RELIABILITY, ENHANCEMENT, AND EVALUATION (continued)
1.
Sponsor's Expectation
SOW Reference
Experiments
Three experienced project RVers
(#009, #504, #131) participated
in theory classes, and in
practice RV training trials
(over 60 each) on around-the-
globe sites.
Toward the end of the FY'81
effort, the first inexperienced
RVer (#622) entered the train-
ing track, generating over 50
RV training trials.
A first-generation series of
evaluation sheets were developed
for use by analysts in providing
numerical estimates of various
aspects of the RV product gen-
erated in operational RV (see
Section III).
During the FY'81 effort, ex-
perienced RVers #002, #009,
#131, and #504 provided data in
response to operational require-
ments, Tasks JS #8 through
JS #22.
Results
Experienced RVers brought through
Stage 3. High-reliability data
obtained through Stage 2 into
Stage 3. Some difficulty
experienced in "retraining" mode
which required shifts in overall
style by experienced RVers, but
this did not appear to interfere
with performance.
Inexperienced RVer brought up to
producing high-reliability data
through Stage 1, into Stage 2.
No difficulty experienced in
becoming familiarized with
codified training procedure.
SECRET
Evaluation sheets for some of the
tasks are beginning to come in,
providing useful feedback to con-
tractor analysts and RVers, and
providing a basis for computerized
data base management (DBM) of the
operational data base.
Although bulk of formal evalua-
tion materials not yet returned
to contractor, client feedback
to date indicates that a number
of viewings were considered
successes .
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
52
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
END OF YEAR REPORT
PROGRAM:
COUNTERMEASURES
1. Sponsor's Expectation
SOW Reference
Experiments
Results
Determine the degree to
which countermeasures exist
for intrusions by mental
means alone.
As requested
by On-site
COTR
Literature search and analysis
of laboratory experiments pub-
lished in refered journals.
CM exists for all intrusions
involving remote perturbation
Recommend those counter-
measures from part 1 above
for further investigation.
As requested
by on-site
COTR
CM for information gathering
intrusion is inconclusive from
the literature, however, the
possibility of intrusion
detection exists.
Random number generators and
temperature measuring devices
appear to be the best candidates
for further study.
SECRET
1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
54
SECRET
-
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1 1.
2.
In addition the following discoveries were made:
(a)
From a review of the data base it was impossible to determine if remote perturbation (RP) exists.
(b)
RP metal bending is observed virtually only when subject is in physical contact with target.
(c)
With few exceptions claimed RP effects occurred only when the subject was in close proximity to
the target (approximately 1 meter).
3.
Based upon the sponsor's stated needs and our discoveries during the fiscal year a program for FY'82
was developed.
SECRET
55
FY' 81 Program
Results
FY'82 Follow-On
Literature search and
analysis of laboratory
experiments published in
scientific journals.
(a)
If remote perturbation
exists at all, RP effects
can, in almost all cases,
be shielded by distance.
RP and intrusion experiment based upon random
number generators and temperature sensing
devices.
(b)
Intrusion detection may
be possible.
-
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
END OF YEAR REPORT
PROGRAM:
FEASIBILITY OF COMPUTER DATABASE MANAGEMENT OF PSYCHOENERGETIC MATERIAL
1. Sponsor's Expectation
SOW Reference
Experiments
Results
Develop concept and material
to determine if RV data base
can be computerized for easy
access and manipulation.
Mid-year
Report
Show application of existing
DBMS to two types of RV data
types .
350 targets in DBMS demonstration
of RV analysis inadequacy of
existing systems for our needs.
Assess feasibility of in-
house DBMS
Verbal re-
quest by COTR
Survey of existing DBMS.
Assessment of problems of in-
house development.
Location of simplified develop-
ment language (FORTH) and DBMS
tools to allow for ease of DBMS
design.
SECRET
56
Recommend self-contained
DBMS for simplified target
identification and
management.
Verbal
request by
COTR
Search for existing coordinate
data-base survey of small
systems.
SG1J
No existing coordinate data base
existing. Recommendation of
stand-alone system for develop-
ment and maintenance of target
acquisition system.
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
L
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
2.
In addition the following discoveries were made :
None
3.
Based upon the sponsor's stated needs and our discoveries during the fiscal year a program for FY'82
was developed.
SECRET
57
FY'81 Program
Results
FY'82 Follow-On
In-house DBMS
DBMS FORTH language
$30K hardware expansion of existing system.
Develop a complete RV assessment DBMS including
tree search capability.
Simplified DBMS
2 stand alone systems
$5K purchase of an Apple II+ system with $275
DBMS software. This system will handle all
target requirements for DBM.
-
SECRET
TEMPEST
-
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SG1A
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Page Denied
Next 1 Page(s) In Document Denied
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
L
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1 1
-
1
END OF YEAR REPORT
PROGRAM:
Audio Analysis
1. Sponsor's Expectation
SOW Reference
Experiments
Results
Develop audio analysis
techniques that can, under
operational conditions,
separate the correct from
the incorrect statements
concerning data available
from typed viewer descrip-
tions of RV problems.
SOW #2.1
Using improved transcript-
evaluation procedures, an
existing data base was
reanalyzed to determine the
degree to which linguistic/
auditory measures are correlated
with known estimates of RV
accuracy.
A target-independent index appears
to correlate with RV accuracy.
SECRET
60
1
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
I
=
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1 1.
L ...
2.
In addition the following discoveries were made :
None
3.
Based upon the sponsor's stated needs and our discoveries during the fiscal year a program for FY' 82
was developed.
SECRET
61
FY'81 Program
Results
FY'82 Follow-On
Feasibility study to
examine potential use-
fulness of linguistic/
auditory measurers in RV
transcript evaluation.
A target-independent index
appears to correlate with RV
accuracy for a single RV'er
in a single data base.
Follow-up study involving other RV'ers and other
data bases to determine whether results obtained
in FY'81 are generalizable.
-
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
.
L
END OF YEAR REPORT
PROGRAM:
TARGETING REQUIREMENTS
1. Sponsor's Expectation
SOW Reference
Experiments
Results
Develop techniques which
will indicate what is
required for target acquisi-
tion and whether or not
these techniques or
abilities are individual in
nature.
Three of the volunteers showed
remote viewing ability.
Good remote viewing results were
obtained in each of the targeting
modes .
Strong individual differences
were found among the viewers
with regard to their individual
preferences for targeting mode.
Mid-session feedback is not
helpful in obtaining additional
data on target elements.
-
SECRET
:
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
62
SOW - 2.4
48 RV experiments were carried
out with 4 new RV subjects.
Three targeting modes were
examined :
abstract, beacon,
and coordinate remote viewing.
In addition, 12 trials were
carried out with mid-session
feedback to the viewer.
IS THIS WHAT WE
ASKED FOR
. ...
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
I
2.
In addition the following discoveries were made:
Precise conclusions await detailed analysis, incomplete as of this date, but it would appear the RV
results can be obtained to some degree with all three targeting strategies under investigation.
WJHAT
DOES
THIS
MEAN
3.
Based upon the sponsor's stated needs and our discoveries during the fiscal year a program for FY'82
was developed.
SECRET
63
FY'81 Program
Results
FY'82 Follow-On
1. 3 targeting modes
investigated:
Await final analysis
None recommended at this point.
(a) beacon/photograph
(b) coordinates
(c) abstract
2.
48 trials with 4 RVers
were completed.
3.
Preliminary analysis
begun.
1
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
JEVALI
I
IV
OPERATIONAL REMOTE VIEWING TASKS
(FY'81)
SRI International is tasked with investigating U.S. capabilities in
applied RV, both to determine the potential for application in U.S. efforts,
and to provide data useful in assessing the threat potential of correspond-
ing Soviet applications. In response to this requirement, SRI has pursued
application tasks of interest to the intelligence community, responding to
quick-reaction requirements set by representatives involved in monitoring
the progress of the work.
The tasks carried out on the DIA program during FY'81 are listed in
the following table. Complete documentation (transcripts, messages,
evaluations, etc.) can be made available through SI/SAO channels on a need-
to-know basis.
The evaluation protocols submitted to analysts for their completion
follow the table. The returned protocols constitute the basis for
contractor evaluation, feedback to the remote viewer, and as input for the
database management (DBM) library function. Although the contractor still
awaits return of the bulk of formal evaluation materials, client feedback
to date indicates that a number of viewings were considered successes.
64
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SG1A
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Page Denied
Next 1 Page(s) In Document Denied
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
(S)
INSTRUCTIONS TO ANALYSTS (U)
(U) The information provided as enclosure to this report was obtained in
response to a collection requirement provided by
This information was acquired from a new and potentially valuable source of
intelligence. Work is currently being pursued to determine the accuracy,
reliability, and improvement potential of this source. Your remarks and
attention to the evaluation sheet will be the basis for our assessment of this
new collection technique. Therefore, the effort you expend will greatly assist
us and will ultimately result in you receiving more data of increasing accuracy
and reliability.
(U)
While formulating your judgements concerning the data, the following
comments concerning this new source of intelligence may be helpful.
(U)
Foremost, the data is likely to consist of a mixture of correct and
incorrect elements. Specifically:
(1)
(S) The descriptive elements are generally of higher
reliability than judgements or labels as to what is
being described (recreational swimming pool may be
mistaken for water purification pools, an aircraft
hull may be mistaken for a submarin. hull, etc.).
Therefore, seemingly appropriate descriptive elements
should not be rejected because of mislabeling.
(2)
(S) The data often contain gaps (in a 3-building complex,
for example, perhaps only two of the buildings may be
described, and an airfield may be added that isn't there).
Such gaps or additions should not be taken to mean that the
rest of the data is necessarily inaccurate.
(S)
Therefore, a recommended approach is to first examine the entire
information packet to obtain an overall "flavor" of the response, reserving
final judgement even in the face of certain errors, and then go back through
for detailed analysis.
(U) If you have questions regarding the data you have received or on its
evaluation please feel free to contact me at any time. Thank you.
67
SECRET
- NOT RELEASABLE TO FOREIGN NATIC
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
-
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
PSYCHOENERGETICS PROGRAM
OPERATIONAL TARGET FILE
(SRI Internal Use Only)
(U)
Project Name
(S)
Viewer
(S)
Monitor
(S)
Date
Time of Start
Time of Finish
(S)
Client
(S)
Priority
Urgent
Routine
(U) Target Key
( )
Variance from Standard Protocol
(U)
Target ID No.
( )
Information Provided by Requestor
( )
Information Provided to the Monitor
( ) Information Provided to the Source
( )
Information Requested by Analyst
(S) Date Information Delivered to Client
(S)
Additional Data Request by Client
Yes
No
(S)
Dates Additional Data Requests Met
( )
Remarks
68
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
1
(S)
SUMMARY EVALUATION SHEET (U)
(U) For the summary evaluation, please check the following boxes as to the accuracy of the submitted material.
Little
Correspondence
ACCURACY
Site Contact,
with
Mixed Results
Good
Excellent
Unknown
Not
Applicable
0
1
2
3
(S) Geographical locale descrip-
tion (terrain, water, etc.)
(S) Large-scale manmade elements
(cities, buildings, silos,
docks, railroad lines,
airfields, etc. )
(S) Small-scale manmade elements
(antennas, computers, tanks,
missiles, offices, etc.)
69
(S) General target ambience (re-
search, production, adminis-
tration, storage, troop move-
ments, naval activity, air
activity, weapons testing, etc. )
(S) Relevant specific activities
(nuclear testing, missile
firing, CBW storage, ELINT
monitoring, etc.)
(S) Personality information
(physical descriptions,
actions, responsibilities,
plans, etc.)
(S) Overall utility
None
Marginal
Useful
Very Useful
Cannot be de-
termined at this time
*
(U) Definitions for the accuracy scale:
0 - Little correspondence
Self explanatory.
1 - Site contact with
Mixture of correct and incorrect elements, but enough of the former to
mixed results
indicate source has probably accessed the target site.
2 - Good
Good correspondence with several elements matching, but some incorrect information.
3 - Excellent
Good correspondence with unambiguous unique matchable elements and relatively
little incorrect information.
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRE Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
( )
DETAILED EVALUATION SHEET (U)
Specific Transcript/Drawing Items
Evaluation
*
Reference
1. ( )
2. ( )
3. ( )
4. ( )
5. ( )
6. ( )
7. ( )
8. ( )
9. ( )
10. ( )
11. ( )
12.
( )
*
0 to 3 point scale of previous page.
70
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
(S) Additional information desired?
Yes
No
(S) Priority
Urgent
date
Routine
( )
Items
1.
( )
2. ( )
3.
( )
4. ( )
SG1J
Return to:
(DIA, DT-1A)
Bldg. 44
SRI International
Menlo Park, CA 94025
71
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SG1B
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Page Denied
Next 1 Page(s) In Document Denied
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECRET
VI
GRILL FLAME FINANCIAL STATEMENT
A.
Budget/Expenses, FY'81 (1 October 1980 - 30 September 1981)
· DIA
$300K
· Army
$130K
Total
$430K
B.
Task-by-Task Breakdown, FY'81
1.
DIA
·
RV Reliability, Enhancement, and Evaluation
$250K
·
Intelligence Assessment
$ 32K
·
Database Management Feasibility
$
8K
·
Countermeasures Feasibility
$ 10K
Total
$300K
2.
Army
.
Audio Analysis
$ 70K
Targeting
$ 60K
Total
$130K
The DIA tasks were completed on time and within budget. The Army
tasks were completed within budget with a one-month no-cost extension in
time, due to the late start (4th quarter) of the Army portion of the program.
C.
Estimated Budget/Expenses, FY'82 (1 October 1981 - 30 September 1982)
.
DIA
$330K
·
Army
$190K
Total
$520K
74
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
SECREI
D.
Estimated Expenses by Task
1.
DIA
.
Intelligence Assessment
$125K
· DBM (Operational Sites)
$ 45K
· DBM (Intelligence)
$ 25K
· RV Evaluation Method
$ 40K
· Operational RV
$ 20K
· Communication & Admin
$ 23K
· Hardware
$ 20K
· RV Enhancement
$ 2K
TOTAL
$300K
· Unspecified
30K
$330K
2.
Army
RV Enhancement
$190K
GRAND TOTAL
$520K
75
SECRET
Approved For Release 2007/11/19 : CIA-RDP96-00788R001300250001-1
... .