SUN STREAK - Annual Report
1987 (U)
TO:
(Dr. Vorona)
DT
1.
(S/SK/WNINTEL)
The mission of the SUN STREAK Prototype
Operational Group (POG) remained dedicated to the application of
the psychoenergetic process of Remote Viewing (RV) as a Human
Intelligence (HUMINT) collection methodology to unilaterally
collect foreign intelligence information or, through appropriate
cuing, provide a basis for a sister discipline to prompt a
specific collection effort on behalf of the Department of Defense
(DOD) and other US intelligence community agencies when all other
systems have failed.
2.
( S/SK/WNINTEL)
The POG is comprised of professional
intelligence officers, a group of highly self-disciplined
personnel dedicated to the collection of foreign intelligence
through the application of unique methodology conducted under
strict, controlled conditions. The attached annual report
reflects the scope of this extensive effort with its perceived
highlights of accomplishments and attendant shortfalls.
3.
(S/SK/WNINTEL)
Efforts involving the penetration of
inaccessible targets in terms of persons, places, things, or
events, were normally successful. Remote viewing efforts
conducted to predict the occurrence or non-occurrence of future
events resulted in generally erratic and unreliable results.
Remote viewing efforts conducted to locate persons (hostages) or
things (documents) based on a known point of focus (operational
data) are to date, encouraging but not conclusive.
Efforts to
favorably resolve the basic issues of the so-called "search
problem" are ongoing.' Prototype taskers related to Military
Plans and Intentions and to Terrorism were drafted;
their
implementation remains to be scheduled for pursuance in a
training mode during the coming year.
WARNING NOTICE:
SENSITIVE
INTELLIGENCE SOURCES AND
METHODS INVOLVED
HANDLE VIA SKEET CHANNELS ONLY
SPECIAL ACCESS REQUIRED
CLASSIFIED BY:
DIA/DT
OADR
Approved For Release 2000/08/07 : CIA-RDP96-00788R001000380003-8
DECLASSIFY BY:
OPTIONAL FORM NO. 10
(REV. 1-80)
GSA FPMR (41 CFR) 101-11.6
5010-114
:
1
.
-
Approved For Release 2000/08/07 : CIA-RDP96-00788R001000380003-8
4.
(U) Personnel are enthusiastic, morale is high, and the unit
is looking forward to greater successes from the challenges of
the new year.
SG1J
1 Enclosure
SUN STREAK Annual Report
cf :
DT
SG1J
-
0
Approved For Release 2000/08/07 : CIA-RDP96-00788R001000380003-8
L.
;
1
Approved For Release 2000/08/07 : CIA-RDP96-00788R001000380003-8
SUN STREAK ANNUAL REPORT - 1987
1.
(S/SK/WNINTEL)
The nature and scope of the POG operational
and training activities are reflected in the following reports:
a.
The Operational Project Report at TAB A.
b.
The Utility Assessment Report at TAB B.
c.
The Viewer Production Report at TAB C.
d.
The Personnel Training Report at TAB D.
2.
(S/SK/WNINTEL)
Interviewer, departed the unit during the
reporting period.
Incoming personnel were
To date two
vacancies authorized by the current IDA and identified as a GS-
0132 OPT 13, and that of a US Army CPT, remain vacant. The
search for suitable candidates to fill the vacancies is ongoing.
3.
( S/SK/WNINTEL)
During the reporting period, procedures were
established to cross-train all remote viewers in both modes of
remote viewing, specifically:
Coordinate Remote Viewing (CRV) ;
and, Extended Remote Viewing (ERV) .
The required training time
for a remote viewer to become operational was reduced from two
years to six months.
the first candidate to be
SG1J
SG1J
successfully trained under the revised training schedule, is
currently operational.
has completed Stage IV of
CRV training.
She will have completed Stage V and Stage VI of
her training by mid-February 1988. In mid-February 1988, Ms
will be trained in the ERV methodology.
Ms.
SG1J
an accomplished and experienced Extended Remote
Viewer, is in Stage III of CRV cross-training.
It is anticipated
that she will complete Stage IV of her training in late January.
During the reporting period, procedures requiring the preparation
of post session-summaries and the submission of sketches as
conceptual representations in support of remote viewing activity,
were established.
In an effort to instill self-confidence and
self-discipline, experienced remote viewers were encouraged to
conduct sessions without the assistance or presence of a monitor
or interviewer.
This form of independent remote viewing known as
"Solo Remote Viewing", has proven surprisingly successful to
date. The concept of "Solo Remote Viewing" will be pursued
during the coming year.
The results of Project 8717 reflect the
first operational effort where solo viewing was used in about
eight of the sixteen total number of sessions conducted.
The
results are encouraging; a high degree of correlation among
viewers surfaced during the course of these sessions against the
target.
Approved For Release 2000/08/07 : CIA-RDP96-00788R001000380003-8
SFORET
SG1J
SG1J
SG1J
SG1J
SG1J
Approved For Release 2000/08/07 : CIA-RDP96-00788RQ01000380003-8
4. (S/SK/WNINTEL)
An estimated
130 sessions conducted by six
viewers under a Utility Assessment known as Project "P", revealed
a near total inability to predict future events. Except for a
few and isolated, eye-catching successes, there was no evidence
of consistency or reliability in the results obtained from remote
viewing efforts conducted in a predictive mode. Remote Viewing
"the future" does not appear to be feasible or a marketable
aspect of this program at this time. However, a utility
assessment known as Project N-1 and conducted to determine a
remote viewer's ability to determine the substantial content of a
document stored at the DIAC, appeared successful. The ancillary
descriptions of the DIAC as the target storage site prompted the
levy of a second and similar task with the added facet of
attempting to determine the identity and location of the target
building where the document is stored. This activity is being
pursued under Project N-2.
If successful, POG may be gaining
meaningful insight on how to best resolve the issue of the so-
called "search problem. " Tenative taskers were established in an
effort to collect information related to enemy Plans and
Intentions and to International Terrorism as intelligence
targets. The perceived ideal tasker in such instances, requests
foreign intelligence information about individual (s) suspected of
a specific activity (ies)
within a given time window(s). Tasking
specificity may be the key element in this effort. Hopefully it
will provide the point of focus needed to determine an unknown
from known data.
5.
(S/SK/WNINTEL)
A training project is being established to
further test the feasibility and desirability of remote viewers
to remote view in a solo mode.
The training scenario provides
for remote viewers to view an event of historical and
intelligence significance. In response to direct tasking, each
remote viewer will be called upon to unilaterally remote view a
distinct facet of the target. Remote viewers will then
coordinate the results of their findings with other team members
in an effort to resolve the problems. Duplicative tasking will
be avoided as much as possible. Where one remote viewer will be
tasked to report on target personalities, a second will be tasked
against related political activities, a third against military
forces, etc. activity etc.
-
Approved For Release 2000/08/07 : CIA-RDP96-00788R001000380003-8
0
:
Approved For Release 2000/08/07 : CIA-RDP96-00788R001000380003-8
6.
(S/SK/WNINTEL)
The scope of the POG remote viewing effort
for 1987 is well documented. An effort to determine the results
of the effort in terms of accuracy and timeliness was
accomplished internally. The intelligence value and use of the
end product remains to be determined through the receipt of
intelligence evaluations prepared by requirement originators and
other intelligence community customers in response to tasking.
SG1J
5 ENCLOSURES
TABS A-D As stated
above
TAB E -Training Precis
:
1
0
0
Approved For Release 2000/08/07 : CIA-RDP96-00788R001000380003-8
SECRET
Approved For Release 2000/08/07 : CIA-RDP96-00788R001000380003-8
OPERATIONAL PROJECT REPORT
PROJECT
SOURCES
SESSIONS
COMPLETED
EVALUATION
8605*
5
10
Ongoing
N/A
8609-A
1
2
Ongoing
N/A
8701
4
12
11 Jun 87
Pending
8702
4
.
12
15 Jun 87
Pending
8704
15
19 Jun
87
Pending
8706
2
5
18 Jun 87
Pending
8708
3
6
19 Jun 87
Pending
8709
4
17
25 Aug 87
Pending
8710
4.
23
29 Jul 87
Pending
8711
4.
24
6 Aug 87
Pending
8712
4
26
10 Sep 87
N/A
8713
4.
18
19 Nov 87
Pending
8714
5
13
14 Dec 87
Pending
8715
4
16
15 Oct 87
Pending
8716
4
7
22 Nov 87
Pending
8717
4
11
Continuing
8718
4
8
4 Nov 87
Pending
(OA)
8719
5
7
10 Nov 87
Pending
(OA)
232
SG1A
Project 8605 is a utility
assessment conducted to determine
SG1A
remote viewer ability to
**
Project 8609-A is a revisit
SG1A
(NOTE: )
This report is cumulative in nature and reflects total
(results to date for CY '87)
Approved For Release 2000/08/07 : CIA-RDP96-00788R001000380003-8
)
Approved For Release 2000/08/07 : CIA-RDP96-00788R001000380003-8
UTILITY ASSESSMENT REPORT
PROJECT
VIEWERS
SESSIONS
UTILITY
D
1
3
Useful
G
5
10
Useful
I-3
6
12
Of Value (Verbal )
M
6
17
Useful
N
2
!
5
Useful
N-1
4.
11
:
Oral Eval
:
N-2*
4
10
Continuing
0
3
9
Useful
P **
6
74
No Intel Value
Q
1
3
Useful
R
2
2
Undetermined
156
0
*
Additional
tasking involves the conduct of a search problem.
**
Project "P" is a utility assessment designed to determine a
remote viewer's ability and propensity to collect foreign
intelligence in a predictive mode.
A new protocol with built-in
feedback capabilities, was initiated in mid-June 1987 with the
consent and knowledge of the participants.
Target correlation in
both instances was weak and ranged from 13 to 18 percent.
Approved For Release 2000/08/07 : CIA-RDP96-00788R001000380003-8
.
Approved For Release 2000/08/07 -: CIA-RDP96-00788R001000380003-8
·
REMOTE VIEWER PRODUCTION REPORT
VIEWER
OPERATIONAL
SESSIONS
UTILITY
ASSESSMENTS
TRAINING*
SESSIONS
TOTAL
SESSIONS
003
65
33
26
124
011
44
32
55
131
018
43
28
15
86
021 **
12
20
5
37
079
52
33
76
161
095
4
0
79
83
099
2
0
0
2
101 **
10
10
3
23
232
156
259
647
*
Training sessions include lectures and drills.
**
Viewer 021 and Viewer 101 were reassigned during the reporting
period.
0
)
Approved For Release 2000/08/07 : CIA-RDP96-00788R001000380003-8
.:
Approved For Release 2000/08/07 : CIA-RDP96-00788R001000380003-8
1987 TRAINING RECAP
VIEWER
CRV (a)
ERV (b)
ORV (c)
ARDBA (d)
SOLO
TOTAL
003
18
2
1
2
1
24
011
46
0
0
0
2
48
018
10
1
1
1
1
14
021
4
3
1
1
0
9
079
55
29
3
1
2
90
095
71
0
0
0
0
71
!
101
0
2
0
1
0
3
204
37
6
6
6
259
(a)), Coordinate Remote Viewing
(b) Extended Remote Viewing
(c) Object Remote Viewing
(d) Abstract Referents Discrimination of Binary Alternatives
*See the Training Presis, attached as TAB E, for a complete
explanation of each technique.
0
Approved For Release 2000/08/07 : CIA-RDP96-00788R001000380003-8
1
..

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.