CIA STARGATE release
CIA-RDP96-00788R000600300017-6
Opens with: AIRCRAFT CRASH - ECUADOR
Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.
8 pages, machine transcribed from the CIA’s released scan.
Approved For Release 2004/02/04 : CIA-RDP96-00788R000600300017-6 AIRCRAFT CRASH - ECUADOR DTG 17 FEB 81, Approx. 0700 Local TYPE UHIH, 1973 Model TAIL NUMBER 73 - 21711 CALLSIGN ARMY 711 CREW SGFOIA3 193rd INF BDE 193rd INF BDE SVC CO 7th SFG APPROX. LOCATION 0422 South 7911 West ( Was on flight between LOJA, Ecuador and VALOR, Peru ) Approved For Release 2004/02/04 : CIA-RDP96-00788R000600300017-6
PO Box 482, Fort Worth, Texas 76 4 Telephone: (817) 280-2011 PRESIDENT: James F. Atkins SENIOR VICE-PRESIDENTS: Hans Weichsel Jr (Product Development) L. M. ( Jack') Horner (Marketing & Programmes) Robert R. Lynn (Research & Engineering) VICE-PRESIDENTS: Edwin L. Farmer (Finance) John Finn (Industrial Relations) James C. Fuller (Public Relations) . William L. Humphrey (General Manager, Amarillo Facility) Dwayne K. Jose (Commercial Marketing) Clifford J. Kalista (Asst to Senior V-P, Marketing & Programmes) Gainor J. Lindsey (Administration) Joseph Mashman (Special Projects) R. K. (Dick) May (Operations) Phil C. Norwine (Government Marketing) Warren T. Rockwell (Washington Operations) Frank M. Sylvester (International Marketing) Ted R. Treff (Treasurer) Reflecting the fact that Bell Helicopter Company was the largest operating division of Textron Ine, the com- pany's name was changed to Bell Helicopter Textron on 1 January 1976. Production at Fort Worth is concerned primarily with military and commercial single- and twin-engined versions of the turbine-powered UH-1 Iroquois, the AH-1 HueyCobra armed helicopter developed from the UH-1, and military and commercial versions of the Model 206 JetRanger. The Bell 47, in continuous production in the USA for more than 25 years, after receiving the first helicopter Approved Type Certificate from the CAA or. 8 March 1946, is no longer in production by Bell. Versions of the UH-1 are built under licence by Agusta in Italy and Fuji in Japan (which see). Bell also has licence agreements with the Republic of China, covering co- production of Model 205 general-purpose helicopters. and with the government of Australia, covering the pro- duction of Model 206B-1 Kiowas for the Australian Army. Prime contractor in Australia is the Common- wealth Aircraft Corporation (which see). Since 1958, when Bell's Model XV-3 tilt-rotor research aircraft achieved the first full in-flight conversion by a machine of this configuration, Bell engineers have con- tinued research in this field and have completed recent US Army/USAF/NASA contracts to investigate proprotor and folding proprotor technology. The contracts included manufacture and wind tunnel testing of examples of both types of rotor. Towards the end of 1972, Bell and one other company received contracts from NASA and the US Army for the design of a tilt-rotor VTOL research vehicle. In May 1973 Bell announced that its Model 301 proposal had been selected for development. Two examples were ordered, with the US Army designation XV-15. During 1972 Bell achieved a major breakthrough in the elimination of vibration in helicopters with what is known as the nodalisation concept. flight test data and analytical results suggesting that 70 to 90 per cent vibration isolation was practicable. This concept is based on the scientific fact that any beam subjected to vertical vibratory forces, such as those induced by a rotor. will develop flexing to produce a wave form. Points of no relative motion. called the nodal rotor-induced vibration. Flight tests of a Model 206 Jet- Ranger with its fuselage suspended from a nodalised beam were so convincing that Bell decided to utilise this 'Noda-Matic' technique on new production helicopters. beginning with the Model 2061. LongRanger and Model 214. Bell Helicopter Textron is responsible for management of Bell Operations Corporation, newly formed to co- operate with the government of Iran in establishing a helicopter manufacturing industry in that country. Further details of this programme can be found under the entry for Iran. Approximately 9,000 people were employed by Bell at the beginning of 1977. The company has produced more than 22,000 helicopters. udnadia( / Har, designe con viens is Although basically similar to the earlier Model 204 (see 1971-72 Jane's), the Model 205 introduced a longer fusel- age, increased cabin space to accommodate a much larger number of passengers. and other changes. The following military versions have been built: UH-1D. This U'S Army version of the Model 205 Iro- quois has an 820 kW (1.100 shp) Lycoming T53-L-11 turboshaft, 14.63 m (48 ft) rotor, normal fuel capacity of 832 litres (220 US gallons) and overload capacity of 1,968 litres (520 US gallons). Relocation of the fuel cells increases cabin space to 6-23 m3 (220 cu ft), providing sufficient room for a pilot and twelve troops, or six litters and a medical attendant, or 1.815 kg (4,000 lb) of freight. First YUH-1D flew on 16 August 1961 and delivery to US D Bell UH-1H Iroquois, with additional side view of UH-1N (bottom) (Pilot Press) Approved For Release 2004/02/04 : CIA-RDP96-00788R000600300017-6
BELL-AIRCRAFT: USA 237 Bell UH-1H Iroquois of the Brazilian Air Force (Ronaldo S. Olive) Max level and cruising speed 110 knots (204 km/h; 127 mph) Econ cruising speed at 1,735 m (5,700 ft) 110 knots (204 km/h; 127 mph) Max rate of climb at S/L 488 m (1,600 ft)/min Service ceiling 3,840 m (12,600 ft) Hovering ceiling in ground effect 4,145 m (13,600 ft) Hovering ceiling out of ground effect Single-rover general-purpose helicopter. 335 m (1.100 ft) Range with max fuel, no allowances, no reserves, at S/L 276 nm (511 km; 318 miles) BELL MODEL 205A-1 The Model 205A-1 is a fifteen-seat commercial utility helicopter developed from the UH-1H. with 1,044 kW (1,400 shp) Lycoming T5313A turboshaft, derated to 932 kW (1,250 shp) for take-off. It is designed for rapid con- version for alternative air freight, flying crane, ambulance, rescue and executive roles. Total cargo capacity is 7-02 m3 (248 cu ft) including baggage space in tailboom, with 2-34 m (7 ft 8 in) by 1-24 m (4 ft 1 in) door openings on each side of the cabin to facilitate loading of bulky freight. External load capacity in flying crane role is 2.268 kg (5.000 lb). The ambulance version can accommodate six litter patients and one or two medical attendants. Normal fuel capacity is 814 litres (215 US gallons): optional capacity is 1,495 litres (395 US gallons). The description of the Bell UH-1H applies also to the Model 205A-1, except for the following details: TYPE: Fifteen-seat commercial utility helicopter. ELECTRONICS AND EQUIPMENT: Standard equipment includes vertical gyro system, 5 in gyro attitude indi- cator, gyro compass, master caution panel, bleed air heater. force trim hydraulic boost controls, soundproof headliner, dual windscreen wipers. cabin and ene'ne fre WEIGHTS: Weight empty, equipped 2,370 kg (5,226 lb) Normal T-O weight 4,309 kg (9,500 1b) Max T-O weight, external load 4,763 kg (10,500 1b) PERFORMANCE (at normal T-O weight): Max level speed from S/L to 915 m (3,000 ft) 110 knots (204 km/h; 127 mph) Max cruising speed at S/L 110 knots (204 km/h; 127 mph) Max cruising speed at 2,440 m (8,000 ft) 96 knots (179 km/h; 111 mph) Max rate of climb at S/L 512 m (1,680 ft)/min Max vertical rate of climb at S/L 259 m (850 ft)/min Service ceiling 4,480 m (14,700 ft) Hovering ceiling in ground effect 3,170 m (10,400 ft) Hovering ceiling out of ground effect 1,830 m (6,000 ft) Range at S/L, at max cruising speed 270 nm (500 km; 311 miles) Range at 2,440 m (8,000 ft) at max cruising speed, no reserves 298 nm (553 km; 344 miles) BELL MODEL 206B JETRANGER II In the Spring of 1971, Bell began delivery of the Model 206B JetRanger II, which subsequently replaced in pro- duction the lower-powered Model 206A JetRanger, of which 660 were delivered. Military 206B-1 Kiowas assembled in Australia are to Model 206B standard. Power plant of the Model 206B JetRanger II is the Allison 250-C20 turboshaft, which Bell was able to install with minimal modification of the original airframe to meet requests for higher performance under hot-day/high- altitude conditions. This enabled Bell to offer modification kits to convert Model 206As to JetRanger II standard, simultaneously with production of new aircraft. The uprated power plant increases power-limited air- : field units began on 9 August 1963. The CH-1D superseded in production for the US Army by the 1 H. but 352 UH-1Ds were built subsequently under ce in Germany for the German Army and Air Force. . contracter was Dornier. i- 1H. Following replacement of the original T53-L- poshaft & the 1,044 kW (1,400 shp) T53-L-13. the ed versionof the Model 205 produced by Bell for the Army wascre-designated UH-1H. Deliveries of an series of 319 aircraft for the US Army began in mber 196. Subsequent orders included 300 more e Army in January 1971, and nine for the RNZAF. ional ordros for a total of 560 UH-IHs were placed ~1-73. AR add-on contract for 54 more UH-1Hs, d at $11.00million, was awarded in September 1974. represented the final order for the US Army, and Ties werecompleted in 1976. Production of the H continued in 1977 to satisfy export orders. der a liceoing agreement concluded in 1969, the Flic of Cina produced 118 UH-1Hs for the nalist Chiese Army, with much of the manufactur- id assemb@ process being carried out at Taichung, ·118. Simmar to UH-1H, for Mobile Command, jian Armed Forces. First of ten delivered on 6 March Originally designated CUH-1H. ·1H. It was announced on 4 November 1970 that a .: had been received from the USAF for 30 HH-1H t (general) similar to the UH-1H) for use as local escue hel Copters. Deliveries were completed during commer &@1 Model 205A-1 is described separately. following details refer specifically to the military H: : SYSTEM: @Ovo-blade all-metal semi-rigid main rotor interchangeable blades, built up of extruded minium sors and laminates. Stabilising bar above at right angles to main rotor blades. Undersiung hering a hub. Two-blade all-metal tail rotor of r\ comb Omstruction. Blades do not fold. . DRIVE: Haft-drive to both main and tail rotors. ismissionCoating 820 kW (1,100 shp). Main rotor 294-32-8 AGE: Copyentional all-metal semi-monocoque cture. U'RFACE: Sthall synchronised elevator on rear fusel- connecod to the cyclic control to increase allow- CG travel. NG GEAR: Tubular skid type. Lock-on ground hand- wheels and inflated nylon float-bags available. PLANT: One 1,044 kW (1,400 shp) Lycoming L-13 turboshaft mounted aft of the transmission ip of the fuselage and enclosed in cowlings. Five connected rubber fuel cells, total capacity 832 litres U'S gallons). Overload fuel capacity of 520 US "s obtained by installation of kit comprising two itre (150 U'S gallon) internal auxiliary fuel tanks onnected with the basic fuel system. "ODATION: Cabin space of 6-23 m3 (220 cu ft) pro- sufficient room for pilot and 11-14 troops, or six and a medical attendant, or 1,759 kg (3,880 lb) of * Crew doors oper forward and are jettisonable ase 2004/02/04: CIA RDP96-00788R000600300017-@ JF
Costa RicferMENT
Approved For Release 2004/02/04 : CIA-RDP96-00788R000600300017-6
@STA ROSA
1 Chilla
OGualtaco
A Bellavista
O
Guanazan
Doña
th charms
Pacha
SAegre
OLAde Cumbe
AR ENILLAŞ
Piedras
Ayapamba
Meway!
SARABURO
0 ZARUMA
F
PINAS D
Ocurfinacapa
S. Lucas
Marcabeis
S.Roque
O Salati
Santiago
28 OP MAYO
Balzas
---
-
- ELRosario
solamar
Guadalupe
Sta Rutina O
Chaquarpamba
ELCIGTEDY
1
faluambi
Buenavista
a Zambi
Cumbaraza
+ + + + -
AL AMOR
La Toma
LOJA
ZAMORA
GELICAO
CATACOCHA
Taxiche
Pindal() {}
A
Malacatus
SCruzpamba
Sacapalca
Q vilcabamba
Paletillas
Purunuma
-
GONZANAMA
Yangana
X
Quilanga
Colaisaca
Zozgranga
RCARIAMANGA
Zapotilq.
Sabiango
Achupallas
+ +
MACARA
Otacamoros
×
Valladolid
Amaluza
,
Opalanda
×
Palanama
Referral Review by
NIMA/DOD
ZUMBA X
Chito
EL Chorro ?
La Chonta
Purabamba
ZAMOR.
A
Timbara
×
EL Progreso
mercadillo
Guachanama
Pozal
Nambacola
0
Mangahurcu
+
Sabrange
Changaimina
. O. Ta quil
Vicentina
olmedo
EL Limo
O.S. Pedro
(Conganama
1
CRYRIS!
T&> BUA
Nieves"
LADatını
-
Cochaputa
1
Manu
Celen
-
Tenta
Purdancial
E
PCapiro
Guaiel
0
1
ʻ
0
chuquiribentba
Nanguina
OrangeQ
Q EL Prado
L. Guerrero
Approved For Release 2004/02/04 : CIA-RDP96-00788R000600300017-6
Y a susudel
PASAJE Q
Cua 55.22
Jimbura
×
QutuanaJIZA HINCHIP Approved For Release 2004/02/04 : CIA-RDP96-00788R000600300017-6 OPYRCH T C LEYENDA 0 PARROQUIAS O CASERIOS CABECERAS CANTONALES CAPITAL DE PROVINCIA CAPITAL DE LA REPUBLICA 544 ESTACIONES DE RADIO SISTEMA VHF E.R.T.T. E. IX-196 3 ESC:1:1000000 REVISIONES RED DE LAS COMUNICACIONES TELEGRAFICAS TELEFONICA S Y DE RADIO DEL ECUADOR Leonidas Carrera DIBUJADO POR Alfonso Zabala DIRECTOR TECNICO Capitan de Fragata Gabriel Jarrių DIRECTOR GENERAL Approved For Release 2004/02/04 : CIA-RDP96-00788R000600300017-6 1 LIMITE PROVINCIAL +++++++ LIMITE INTERNACIONAL SISTEMA DE COMUICACIO - NES HF-BLI
CPYRGHT Approved For Release 2004/02/04 : CIA-RDP96-00788R000600300017-6 Bell's 214ST: the powerful new super transport getting ready to join the Bell Air Mobile team A new, super transport helicopter, with more horsepower, increased troop carrying capacity, and able to deliver heavier loads faster and higher than ever ... even on the hottest days ... Bell's 214ST twin adds a whole new operational capability to military forces. Now in test, the 19-place 214ST is being hailed as the advanced manpower, ordnance and logistics mover needed for the 1980s. Joined with the 206 for reconnaissance and command and control, the AH-1 Cobra for fire support, and the UH-1H and 214B medium transports, this newest, most powerful Bell super transport presents an unequalled air mobile team for total force deployment in any weather, in any environment. peacekeepers the world over depend on Bell HELICOPTER Approved For Release 2004/02/04 /GIA-RDP96-00788R000600300017-6 While 1 directi the he movo ; devolt Light (LAME Com proye. tor fur avionk 1974 sion t. contrai senter that !!! airfran respo: In S. ed Gy. airfran; scale : Group chosen contrat tems A gave .: ment : LAMP :: momer Harold LAMP crucial agrees gram :. Year 1: Capit~1 In c Hawk . (Utility comput product run for Black | Althe first pro
Approved For Release 2004/02/04 : CIA-RDP96-00788R000600300017-6 ------ . .. UH-IH (1973) TAIL # 73-21711 17 FEB 81 @ 0700 LOCAL TIME CREW: SGFOIA3 Approved For Release 2004/02/04 : CIA-RDP96-00788R000600300017-6
Approved For Release 2004/02/04 : CIA-RDP96-00788R000600300017-6 First town to be visited: 1. Las Aradas 04 degrees, 21 minutes, 45 seconds South 79 degrees, 23 minites, 50 seconds West Closer to the center of greatest interest: 2. La Laja 04 degrees, 26 minutes, 05 seconds South 79 degrees 27 minutes, 30 seconds West (4) 3. The four corners of the area to be searched: 1. 04 degrees, 27 minutes, 30 seconds South (2) 79 degrees, 26 minutes, 25 seconds West 2. 04 degrees, 27 minutes, 30 seconds South 79 degrees, 24 minutes, 50 seconds West (3) 3. 04 degrees, 30 minutes, 00 seconds South 79 degrees, 24 minutes, 50 seconds West V 4. 04 degrees, 30 minutes, 00 seconds South 79 degrees, 26 minutes, 25 seconds West 4. Center of the area of greatest interest 1. 04 degrees, 28 minutes, 30 seconds South 79 degrees, 25 minutes, 40 seconds West (1) Approved For Release 2004/02/04 : CIA-RDP96-00788R000600300017-6