Project Interloper

CIA STARGATE release

CIA-RDP96-00788R000500030014-0

Opens with: Interim verbal report to Project 8035 analyst, 10 October 1980

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

1 page, machine transcribed from the CIA’s released scan.

Approved For Release 20 . 08:07
IA-RDP96-00788R000500030014-0
ODLUKE
Interim verbal report to Project 8035 analyst, 10 October 1980.
Target was the thirSGlAthe list provided telephonically.
Geo coordinates wer
Following is gist of the description provided:
a.
A column of fire going straight up.
b.
A desolate, but rolling area with the ground opening
into a mound.
C .
Several large holes over a wide area, four or five.
d.
Slight border of green on the left.
e .
A metal domed shape like an old hangar, made of metal.
f .
Approximately four very heavy fork lift type vehicles
working inside the hangar-type building.
g .
Looked like a big storage area for huge pipes 3'-4' in
diameter.
h.
Feeling that what was being looked for was already gone.
Directed= to go back in time and look for that which was being sought.
a .
A rocket vehicle of some sort, poised to take off, in
the ground.
b.
Time of acquisition of target :
approximately 12 days prior
to 09 October 1980.
Directed to return to the warehouse/hangar type building and present
time.
a .
Same large cylinders, feeling of maintenance.
b.
Move to 12 Oct 80 - large cylinder gone.
c.
15 Oct -
working on something smaller.
d.
18 Oct - assembly of a front portion to the main portion.
e .
18 0ct
feeling of final assembly. There are three
section to the""thing"
·
f.
The front is the "carrier", the center is the power source,
the tail is the fuel, having almost a "needle" nose cone,
which later appeared more rounded.
Directed to follow the device forward in time.
a .
Device rolled out of warehouse on several carriers to the
field.
(no appreciation for distance)
b.
No people going on it.
c.
Research, picture taking.
d.
Time to launch from the last day of future (18 0ct 80)
+ 2 days for movement ( 0/A 20 0ct 80)
+ 2-3 days for launch (0/A 22 - 23 0ct 80)
NOTE :
Activity level was most intense during the period in which
the three section were being assembled, circa 18 0ct 80.
aronCT
Approved For Release 2000/08ZUPA-RDI 90-00788R000000030014-0

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.