Project Interloper

CIA STARGATE release

CIA-RDP96-00788R000500020001-5

Opens with: Memorandum For the Record

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

4 pages, machine transcribed from the CIA’s released scan.

Approved For Release 2000/08/07 : CIA-RDP96-00788R000500020001-5
1
Memorandum For the Record
14 Oct 80
Subject: analyst Discussions; Report re.
Session D-74
1. (C/NOFORN) On 9 October 1980, the
(incl 1)
cundersigned prepared an outline of The
results of session D-74. The outline
was left with Project Manager with
request to report the data tele-
phonically To
CORDON
10 October 1980 (ale to pron commit-
ment of undesigned To another
project ). Due to intensive work load
of Project Manager, data was not
Called in 2
ou 10
October 1980 .
2 (S/NOFORM) Undersigned was
informed by Project Manager of status
of proposed verbal report
During AM of 14 October 1980. act
Approved For Release 2000/08/07 : CIA-RDP96-00788R000500020001-5
Approved For Release 2000/08/07 : CIA-RDP96-00788R000500020001-5
1900 hours
contacted
at his
$G1J
14 October 1980, Undersigned
1
SG1A
SG1J
office at guy phone # 7165. and
provided him a verbal report
de. inclosede 1 contents. I.
indicated he'd have to
Check further at the Target area to
determine if any area near the
gro coordinates matched the
description provided.
cindicated the cylinders could be
interpreted as airplanes, thereby
cindicating the target was an
anfield type gestalt.
3. (S/NOFORN)
requested coverage within the
chest few days on the
Second set of geographic coordinates.
SG1A
chose buon
Approved For Release 2000/08/07 : CIA-RDI
5
Approved For Release 2000/08/07 : CIA-RDP96-00788R000500020001-5
concentrate on the time frame
beginning 18 October through Leved
3 day lucrements, The reason for this
request is to determine if there.
les any Increase in gestalt
activity levels at This new
target which might correlate
In the perceived increase in
activity at target 0-74
coordinates, which was reported
In occurs on or about the
18 October 1980 time frame.
JeanetAV Bell, f.
CPJ, MI
.
Approved For Release 2000/08/07 : CIA-RDP96-00788R000500020001-5
4
Approved For Release 2000/08 fre
CA RDP96-00788R000500020001-5
Session D-74
Interim verbal report to Project 8035 analyst, 10 October 19
Target was the third on the list provided telephonically.
Geo coordinates were:
SG1A
Following is gist of the description provided:
a.
A column of fire going straight up.
SG1A
b.
A desolate, but rolling area with the ground opening
into a mound.
c.
Several large holes over a wide area, four or five.
d.
Slight border of green on the left.
e .
A metal domed shape like an old hangar, made of metal.
f.
Approximately four very heavy fork lift type vehicles
working inside the hangar-type building.
g .
Looked like a big storage area for huge pipes 3'-4' in
diameter.
h.
Feeling that what was being looked for was already gone.
Directed= to go back in time and look for that which was being sought.
a .
A rocket vehicle of some sort, poised to take off, in
the ground.
b.
Time of acquisition of target:
approximately 12 days prior
to 09 October 1980.
Directed to return to the warehouse/hangar type building and present
time.
a.
Same large cylinders, feeling of maintenance.
b.
Move to 12 Oct 80 - large cylinder gone.
c.
15 Oct - working on something smaller.
d.
18 Oct - assembly of a front portion to the main portion.
e .
18 Oct - feeling of final assembly. There are three
section to the""thing"
f.
The front is the "carrier", the center is the power source,
the tail is the fuel, having almost a "needle" nose cone,
which later appeared more rounded.
Directed to follow the device forward in time.
a.
Device rolled out of warehouse on several carriers to the
field.
(no appreciation for distance)
b.
No people going on it.
c.
Research, picture taking.
d.
Time to launch from the last day of future (18 0ct 80)
+ 2 days for movement ( 0/A 20 0ct 80)
+ 2-3 days for launch (0/A 22 - 23 0ct 80)
NOTE :
Activity level was most intense during the period in which
the three section were being assembled, circa 18 0ct 80.
Approved For Release 200urvor
WHATADAP96-00788R060500020001-5
SEUNET
Kenne Bellit
·

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.