Project Interloper

CIA STARGATE release

CIA-RDP96-00788R000300090001-0

Opens with: MATERIAL UTILIZED

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

3 pages, machine transcribed from the CIA’s released scan.

8015
20 May 1980
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300090001-0-
ASSETS USED
SESSION .
SOURCE
TARGETING
MATERIAL UTILIZED
KNOWLEDGE PROVIDED TO
FEEDBACK TO SOURCE
INTERVIEWER FOR SESSIONSGAFOLLOWING SESSION
DATES
KEY RESULTS PROVIDED
BY THE SOURCE
ANALYST
COMMENTS
CD-12
#19.5
Name of individual
Name and address of
The source previously 20 May 80
The source described
Information and
SG1A
SG1
and the require-
lived and attended
the last address as a
photos provided by
last known address:
ment. (Locate and des-
school in Miami, FL.
single story flat roofed
the tasker indica-
SG1A
cribe present location of
masonary multi-family
ted that the last
SG1A
dwelling with a decor-
known address is a
ative facade that is
two story masonary
higher than the bldg.
multi-family dwel-
and curbed, like false
ling with a facade
front. The new loca-
that is curved like
tion of Pablo is across
the drawing made by
NW 2nd st. Right two
the source. It is
blocks on corner. Near
tall phone pole. It
NOTE: Project was terminated by the tasker after
was described as a sand-
the second session on this
project was completed.
wich shop with signs in
The tasker did not have the means to provide
Spanish.
His drawings
more extensive support to
the project and also
show the last known
learned that the problem was not in their area
address to be in the
of responsibility.
center of the block,
the fifth house from
a
the corner. Pablo is
demented, dangerous.
0
E
DATE PROJECT NUMBER CLOSED:
1 July 1980
TASKING AGENCY:
OPS roup, INSCOM
SG1A
CLASSIFIED BY:051636Z JUL 78
MSG, HQDA (DAMI-ISH)
REVIEW ON: Jan 2001
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300090001-0
SECRET GRILL FLAME
SESSION , FORWARDED
I.CULL:
8015
20 May 80
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300090001-0
-
ASSETS USED
TARGETING
DATES
SESSION
SOURCE
MATERIAL UTILIZED
KNOWLEDGE PROVIDED TO
INTERVIEWER FOR SESSION
FEEDBACK TO SOURCE
FOLLOWING SESSION
SESSION
FORWARDED
KEY RESULTS PROVIDED
BY THE SOURCE
ANALYST
COMMENTS
CD-12
(cont )
is west of the
last known address.
See attached.
DATE PROJECT NUMBER CLOSED :
20 May 1980
TASKING AGENCY:
OPS Group, INSCOM
CLASSIFIED BY:051630Z JUL 78
MSG, HQDA (DAMI-ISH)
REVIEW ON:
Jan 2001
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300090001-0
SECRET GRILL FLAME
Approved For Release 2000/08/07+CIARDP9600788RO00300000200
ASSETS USED
SESSION _ SOURCE
TARGETING
MATERIAL UTILIZED
KNOWLEDGE PROVIDED TO
INTERVIEWER FOR SESSION
FEEDBACK TO SOURCE
FOLLOWING SESSION
SESSION
FORWARDED
KEY RESULTS PROVIDED
BY THE SOURCE
ANALYST
COMMENTS
CD-13
#10.5
Address:
SGIA
The interviewer knew the
The source had pre-
20 May 80
The source thought that The tasker did not
SG1A
name
and
viously lived and
the new residence of
or could not provide
the address.
This is the
attended school in
SG1A
was west of Ken-
any confirmation
first session he has con-
SG1A
dal or Sunny Land near
lon any of this data.
Sunny Land shopping
center. Modern small
NOTE: The project
house built in 50's.
was terminated after
Pablo also described
this session. The
as working in a 17
problem is not in
story bldg. in old
the taskers area of
downtown, looks like
responsibility.
the Federal bldg. as it
appeared in 1960. May-
be an investigation.
Thinks a lot, looks for
NOTE: The source made a statement for the record
things.
after the session that indicates that his response
may have been colored by his belief that management
would not ask him to do anything that is contrary
to 380-13. The source had
not previously reported
on personnel in CONUS.
DATE PROJECT NUMBER CLOSED:
1 July 1980
TASKING AGENCY:
OPS Group, INSCOM
CLASSIFIED BY:051636Z JUL 78
MSG, HQDA (DAMI-ISH)
REVIEW ON: Jan 2001
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300090001-0
SECRET GRILL FLAME
ducted on this project.
DATES

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.