Project Interloper

CIA STARGATE release

CIA-RDP96-00788R000300040009-7

Opens with: MATERIAL UTILIZED

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

7 pages, machine transcribed from the CIA’s released scan.

.
SG1A
roved For Release 2000/08/07 : CIA-RDP96-00788R000300040009-7
8009 (C)
25 March 1980
SEGRET
ASSETS USED
SESSION
SOURCE
TARGETING
MATERIAL UTILIZED
KNOWLEDGE PROVIDED TO
INTERVIEWER FOR SESSION
FEEDBACK TO SOURCE
FOLLOWING SESSION
DATES
SESSION
FORWARDED
KEY RESULTS PROVIDED
BY THE SOURCE
ANALYST
COMMENTS
CCC59
#31
a. Target Coordinates.
Same as Viewer.
Viewer was told he
3 Apr 80 21 Apr 80 Viewer reported a boat
Information was
b. Viewer was instruct
had a minimal amount
construction facility
reported to the ITAC
ted that tgt was com-
of correlary infor-
under a canvas com.
Analyst and the
pletely covered. He
mation about the
clearly not at the
methodology utilized
was asked to:
target.
target .
was discussed. It
(1) Describe cover
was decided that
construction.
the same method of
(2) Describe what,
NOTE :
THIS WAS
toting would be
if anything, was
used again to ascer-
covered.
tain if target
c.
Purpose:
to
could be achieved
determine if there are
with a different
trucks present in
viewer.
parking area.
(Knowledge unknown to
Viewer & Facilitator)
CCC61
#08
Same as above.
Same as above.
Viewer was told he
3 Apr 80 21 Apr 80
Viewer reported a mis-
Information was agan
did not have any
sile launch facility
discussed with ITAC
correlation to the
with approximately 3
Analyst and since
target - but may
floors, under a con-
this was the second
have correctly des-
crete overhang.
clear miss - a new
cribed another tgt
targeting method
SG1A
DATE PROJECT NUMBER CLOSED:
26 October 1980
TASKING AGENCY:
ITAC
Estimates Division
CLASSIFIED BY :051636Z JUL 78
MSG, HQDA (DAMI-ISH)
REVIEW ON:
17 Nov 2000
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300040009-7
SEGRET GRILL FLAME
SG14
SG1A
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300049009-ch 1980
"DATE:
SEGRET
ASSETS USED
SESSION , SOURCE
TARGETING
MATERIAL UTILIZED
KNOWLEDGE PROVIDED TO
INTERVIEWER FOR SESSION
FEEDBACK TO SOURCE
FOLLOWING SESSION
DATES
SESSION , FORWARDED
KEY RESULTS PROVIDED
BY THE SOURCE
ANALYST
COMMENTS
in the vicinity of
was discussed
the given coordintes.
which would even
further restrict
information avail-
able to the
Remote Viewer.
CD07
#31
a. UTM Coordinates.
Same as Viewer.
GF Analyst told
14 May 80 19 May 80 a. Large rectangular
a.
Analyst states
b. An advanced time &
viewer that based
building. Not very
description of
date window was tar-
on his information
high.
site is plausible.
geted of 0800 hrs,
provided - he felt
b. Approached by a
b. Analyst stated
22 May 80.
he could say that he
curved road.
there was no activity
c. Viewer was asked
was at the tgt.
c. No windows. Blank
at the site as well.
to:
walls.
(1)
Describe target
SG1A
d. 5 or 6 loaf shaped
(2)
Describe act-
NOTE:
THIS WAS
buildings colocated
ivity.
w/no windows & slots at
(3)
Comment on
each end.
level of activity.
e. Viewer stated struc-
tures were not fully
occupied & no activity.
DATE PROJECT NUMBER CLOSED:
26 October 1980
TASKING AGENCY:
ITAC
Estimates Division
CLASSIFIED BY:051636Z JUL 78
MSG, HQDA (DAMI-ISH)
REVIEW ON:
17 Nov 2000
SG1A
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300040009-7
SECRET GRILLFI
SG1A
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300040009-7
PROJECT NUMBER:
8009 (C)
ENTRY DATE:
25 March 1980
SEGRET
ASSETS USED
SESSION
SOURCE
TARGETING
MATERIAL UTILIZED
KNOWLEDGE PROVIDED TO
INTERVIEWER FOR SESSION
FEEDBACK TO SOURCE
FOLLOWING SESSION
DATES
SESSION
FORWARDED
KEY RESULTS PROVIDED
BY THE SOURCE
ANALYST
COMMENTS
CD08
#36
Same as above w/diff-
Same as Viewer.
Note the
Viewer was told by
14 May 80 19 May 80 Information was report-
ITAC Analyst did
erent time windows.
Interviewer has additional GF Analyst that there
ed by phone to ITAC
not provide a
(0800 hrs, 18th & 26th
knowledge of first Viewers
did not appear to be
Analyst. Information
formal or written
of May 1980)
comments & feedback.
any correlation to
in no way corresponded
response as the
the target during
to the target.
session did not pro-
his session .*
duce any corres-
NOTE: THIS WAS
SG1A
ponding target info.
CD09
#32
Same as above, w/a
Same as Viewer, as well as
Viewer was told that 14 May 80 19 May 80
a. Large cleared area.
Plausible site
different targeting
having knowledge of info.
there was info pro-
b. Small building w/no
description.
time/date of 0800 hrs,
provided by viewer during
vided by him that
windows.
b. . There was no
22 May 80.
sessions CD07 & CD08.
correlated to some
c. Constructed to hide activity on-going.
degree with his
or hold something.
target.
d. Looks like an un-
finished construction
SG14
job. Although fully
NOTE: THIS WAS
operational it is com-
pletely deserted.
e. No on-going acti-
vity. No people present
*Viewer was greatly disturbed by noise and had little concentration during this session.
DATE PROJECT NUMBER CLOSED:
26 October 1980
TASKING AGENCY:
ITAC
Estimates Division
CLASSIFIED BY:051630Z JUL 78
MSG, HQDA (DAMI-ISH)
REVIEW ON:
24 November 2000
SG1A
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300040009-7
SECRET GRILL FLAME
- -....
SG1A
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300040009-7
8009 (C)
"BATE:
25 March 1980
SECRET
ASSETS USED
SESSION
SOURCE
TARGETING
MATERIAL UTILIZED
KNOWLEDGE PROVIDED TO
INTERVIEWER FOR SESSION
FEEDBACK TO SOURCE
FOLLOWING SESSION
DATES
SESSION
FORWARDED
KEY RESULTS PROVIDED
BY THE SOURCE
ANALYST
COMMENTS
CD18
#08
a.
Target UTM's.
Facilitator had same infor-
None.
22 May 80|
23 May 80
a.
Huge smoke stacks
No feedback has
b.
Projected target
mation as viewer and was
or very large brick
ever been received
time/date of 2400 hrs.
also directed to ask
chimney.
for this session
26 May 1980.
viewer a 3rd question
b. Large transhipment
from ITAC Analyst.
c.
Questions:
during the session without
depot w/many spur
(1)
Describe tgt ..
the viewer being aware
type railroad tracks
(2) Describe tgt
that it was a planned
entering area.
activity.
question. Question was:
c. Many empty flatbed
d. This was second
Describe condition of the
railway cars next to
time targeted for this
target.
shed type structure.
viewer.
d. Many vehicles under
SGIA
shed. Stacked one on
NOTE :
TARGET WAS
another. Large
wheeled, probably
amphibions. APC type
vehicles with small
gun tubes from a front
shield. Smaller tank
type vehicle.
e. Tread on smaller
tank reported narrow.
f. Not much activity.
Activity pending or a
SG1A
DATE PROJECT NUMBER CLOSED:
26 October 1980
TASKING AGENCY:
ITAC
Estimates Division
CLASSIFIED BY :051630Z JUL 78
MSG, HQDA (DAMI-ISH)
REVIEW ON:
24 Nov 2000
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300040009-7
SECRET GRILL FI
SG1A
Approved For Release 2000/98/07) : CIA-RDP96-00788R000300049009-71980
SECRET
ASSETS USED
SESSION
SOURCE
TARGETING
MATERIAL UTILIZED
KNOWLEDGE PROVIDED TO
INTERVIEWER FOR SESSION
FEEDBACK TO SOURCE
FOLLOWING SESSION
DATES
SESSION
FORWARDED
KEY RESULTS PROVIDED
BY THE SOURCE
ANALYST
COMMENTS
readiness for activity.
Would increase early
morning hours of
26 May 80. Flat cars
would than be loaded
and convoy would pro-
ceed a great distance
as from border to bor-
der.
CD26
#8.5
a. UTM Coordinates.
a. Same as Viewer.
None.
28 May 80
2 Jun 80
a. Metal bridge across
No feedback has
b. Specific time/date
b. Following questions
See note
ravine. Center span
ever been received
targeted was 2400 hrs,
directed for during
below)
could be raised.
for this session
31 May 80.
session:
b. Rough terrain,
from ITAC Analyst.
c. Specific questions
(1) Describe tgt &
w/lots of exposed rock.
were directed to be
activity.
c. Town on opposite
asked during the sess-
(2)
Pursue activity
side of bridge (south).
ion.
concerning people.
d. Object described to
d. This was second
SG1A
side and just below
time this was targeted
NOTE :
THIS TARGET WAS
bridge platform - like
by Viewer.
(CDO 8)
an old aircraft fuse-
lage cylindrical in
shape w/holes and smoke
NOTE :
ITAC Analyst was passed information via secure line since delivery could not be affected prior to 2 June 1980.
DATE PROJECT NUMBER CLOSED:
26 October 1980
TASKING AGENCY:
ITAC
Estimates Division
CLASSIFIED BY :051636Z JUL 78
MSG, HQDA (DAMI-ISH)
REVIEW ON:
24 Nov 2000
SG1A
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300040009-7
SECRET GRILL FLAME
SGTA
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300040009-7
25 March 1980
SECRET
ASSETS USED
SESSION
SOURCE
TARGETING
MATERIAL UTILIZED
KNOWLEDGE PROVIDED TO
INTERVIEWER FOR SESSION
FEEDBACK TO SOURCE
FOLLOWING SESSION
SESSION
FORWARDED
KEY RESULTS PROVIDED
BY THE SOURCE
ANALYST
COMMENTS
coming from them.
e. Size reported a
ratio of 10-1 (length
to width).
f. Men w/packs sitting
in the object.
g. No activity in area.
CD56
#14
a. Target Coordinates.
Same as viewer.
None.
18 Jun 80|19 Jun 80 a. Very rugged mount-
a. Coordinates
b.
Specified date/time
ains, deep ravine,
are good.
targeted was 1200 hrs,
bridge & tunnel ent-
b. Information
24 June.
SG1A
rance in proximity of
appears to be
c. Targeted area was
NOTE: THIS TARGET WAS
of target.
invalid.
approximately 500 x 300
b. Nothing of interest.
meters.
d. Describe target in
as much detail as pos-
sible.
CD57
#08
a. Target Coordinates.
aumeSamecinfo. as Viewer.
Viewer was advised on 19 Jun 80 20 Jun 80 a. 22 Jun 80: Source
22 Jun 80:
b.
Specific date/time
b.
Interviewer also
5 Sep 80 that portions
reported many vehicles.
Very good hit!
targeted was 1200 hrs,
knew vehicles would be
of his session were
trucks/trailers approx.
b. Tube objects
22/23/24 Jun 80.
at this target - but he
of high accuracy.
22 ton or larger in size.cannot be verified.
DATE PROJECT NUMBER CLOSED:
26 October 1980
TASKING AGENCY:
ITAC
SG1A
Estimbate Division
CLASSIFIED BY:051636Z JUL 78
MSG, HQDA (DAMI-ISH)
REVIEW ON:
24 Nov 2000
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300040009-7
SECRET GRILL FI
DATES
SG1A
Approved For Release 2989108/07 : CIA-RDP96-00788R000309940202-7 1980
SECRET-
ASSETS USED
SESSION , SOURCE
TARGETING
MATERIAL UTILIZED
KNOWLEDGE PROVIDED TO
INTERVIEWER FOR SESSION
FEEDBACK TO SOURCE
FOLLOWING SESSION
DATES
KEY RESULTS PROVIDED
BY THE SOURCE
ANALYST
COMMENTS
c. Target area is
would not pursue this info-
Many carrying tube type c. 23 Jun 80:
500 x 300 meters in
rmation unless the viewer
objects.
Plausible but
size.
brought vehicles up
b. 23 Jun 80: Effort
cannot verify.
d. Describe target in
through remote viewing.
to hide things at tgt
d.
24 Jun 80:
as much detail as pos-
by covering.
No evidence of any
sible.
c. 24 Jun 80: Effort
large scale vehicle
e. This was third
to hide or move or
departure during
time this viewer was
cover objects would be
this time frame.
targeted against this
SGIA
nearly completed. He
e. Gun emplacements
target.
NOTE: TARGET WAS
stated when asked if
are plausible.
there would still be
any vehicles present -
there wouldn't be.
Also stated very well
camouflaged guns are
at each end of area.
SG1A
DATE PROJECT NUMBER CLOSED:
26 October 1980
TASKING AGENCY:
ITAC
Estimates Division
CLASSIFIED BY:051630Z JUL 78
MSG, HQDA (DAMI-ISH)
REVIEW ON: 24 Nov 2000
Approved For Release 2000/08/07 : CIA-RDP96-00788R000300040009-7
SECRET GRILL FI
SESSION FORWARDED

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.