Project Interloper

CIA STARGATE release

CIA-RDP96-00788R000200420001-4

Opens with: NOT RELEASABLE TO FOREIGN NATIONALS

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

18 pages, machine transcribed from the CIA’s released scan.

Approved For Release 2000/08/07
SECRET
NOT RELEASABLE TO FOREIGN NATIONALS
ORCON
CD-02
1
INSCOM
GRILL FLAME
.. .
.
.
.
PROGRAM
SESSION
REPORT
CLASSIFIED BY: MSG, DAMI-ISH
051630Z JUL 78
REVIEW ON!
June 2000
Capy 1 of 2 copies
GRILL FLAME
Approved For Release 200010
CDL
T
RDP96-00788R000200420001-4
.
Approved For Release 2000/08 -7 : CR DP96-00788R000200420001-4
SUMMARY ANALYSIS
REMOTE VIEWING (RV) SESSION CD-02
1. (S) This report documents a remote viewing (RV) session conducted
in compliance with a request for information on a target area of interest.
2. (S)
The viewer had no trouble locating and describing the target
area.
Ambient room noise did not disturb the viewer.
The viewer expressed
his confidence in his imagery.
3. (S)
.The protocol used for this session is detailed in the document,
Grill Flame Protocol, AMSAA Applied Remote Viewing Protocol (S), undated.
4. (S) Following is a transcript of the viewer's impressions during
the remote viewing session. At TAB A are drawings made by the viewer
reference his impressions of the target site. At TAB B is target cuing
information provided the viewer at the time of this session. At TAB C
are analyst's comments.
SECRET
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
NOT RELEASABLE TO FOREIGN NATIONALS
Approved For Release 2000/08/67 . CJA-RDR96-00788R000200420001-4
SECRET
MEMORANDUM FOR THE RECORD
4 June 1980
SUBJECT :
Session CD-02 Cuing Data
SG1A
1.
(S/NOFORN) This was #01's fourth session against
(Project 8003a). Previous sessions were CCC25, CCC33, and CCC41. Prior
to this session, #01 was shown an aerial photo of the target installation
which had all marginal information concealed from view using opaque
paper masking (ref session CCC41). On this photo, the targeted building
(that to immediate SE of long production building at mensurated coordinates
was circled in black grease pencil. The
SG1A
target structure was clearly pointed out to #01 by the analyst as being
the building next to the structure #01 had previously targeted in
session CCC41.
(S/NOFORN)
This was #66's fourteenth session against Project 8003a.
#66 also interviewed during session CCC98. Although that session was
against a different geographic area, it did result in relative data
regarding the type of equipment being sought. Therefore, #66 may have
suspected the true nature of targeting as being interconnected with that
of session CCC98.
3. (C/NOFORN) A copy of attached Intelligence Report in MFR format
dated 23 May 80 was provided to the SED action officer by LTC Watt on
28 May 1980.
Kennethv Belt.
KENNETH V. BELL
Project Analyst
CLASSIFIED BY MAA DAMI-ISH
ESCLASSIFY ON
OR
June 2000
REVIEW ON
EXTENDED BW
REASON
GRILL FLAME
SECRET
Approved For Release 2000/08/07/. CIALRDP96-00788R000200420001-4
NOT RELEASEABLE TO FOREIGN NATIONALS
Approved For Release 2000/08/07 CARD06-00788R000200420001-4 2
ORCON
DEPARTMENT OF THE ARMY
US ARMY INTELLIGENCE AND SECURITY COMMAND
FORT GEORGE G. MEADE, MARYLAND 20755
Nİ
DEP
IAFM-OPS-HU-SA
23 May 1980
MEMORANDUM FOR THE RECORD
SG1A
SUBJECT :
Unconfirmed Information re. Activity at
SG1A
1. (U) The following information applies:
a.
(S/NOFORN)
Source provided the following information regarding exterior
observations of a structure at subject installation ( Inclosure 1) :
(1) (S/NOFORN) The exterior of the structure consists of metal walls
having high windows up the sides. The building (appeared) large enough (in
height) to accommodate two storys, but only had one story inside.
(2) (S/NOFORN) One side of the building faces a longer building across
a narrow area surfaced with thick, hardened concrete. This side of the building
(which faces the other building) has large sliding doors and slightly inclined ramps
accessing it. Windows in this side of the building are located just under the
eaves of the structure.
The eaves are approximately 25 feet above the hardened
concrete area.
(3) (S/NOFORN)
The building was described as a "plant type" of struc-
ture, (appearing) to constitute merely one "plant" within a group of "plants".
Source observed a "hum" of activity and steam powered equipment. Source deduced
that activity at this "plant is based on raw material which comes from a nearby
foundary.
b. (S/NOFORN) Source provided the following information regarding interior
observations of the same structure ( Inclosure 1):
(1) (S/NOFORN) Upon accessing the interior of the structure from the
reinforced concrete area between the building and the longer building opposite,
a large "bay" area is entered. A large "S" shaped assembly area occupies nearly
all of this "bay".
(2) (S/NOFORN) The area of this "bay" is described as having heat,
'machines, high pitched whining noises, impact hammering on thick steel, and
heavy metal machining. The "bay" was described as a complicated, multiple
step manufacturing area where a raw form resembling a turret for an armored
vehicle is finished to a certain point. These turrets were initially described
as resembling "globs of steel" of a "thick pancake" shape having holes in their
tops and "stubby boom pipe or tube affairs" on their ends. The steel was desc-
ribed to be of varying thicknesses (8" to 16") depending upon the area of the
turret at which it was located.
CLASSIFIED BY:
HQDA(DAMI-ISH) Msg,
td 051630Z Jul 78
REVIEW ON:
23 May 2000
SECRET
Approved For Release 2000/08/07 4 SIA-RDP96-00788R000200420001-4
Approved For Release 2000/08/07 [ C/A-RDH96-00788R000200420001-4
SG1A
IAFM-OPS-HU-SA
SUBJECT: Unconfirmed Information re. Activity at
23 May 1980
SG1A
(3) (S/NOFORN)
Source stated that two (apparent) functions occur
within the building. Within the "bay" area, finishing work and check out of
turret assemblies is accomplished. Interconnecting turret parts are properly
fitted and finished through a measuring and seating process. Each component is
identified with a number, correlated to its related components (like an
individual turret assembly), and sent to another part of the plant. Continuity
of the "matched" parts is thereby maintained throughout the assembly process.
At the other end of the building, objects resembling gun tubes were X-rayed for
defects, metallurgical quality control, and purity.
c. (S/NOFORN) Source provided the following information regarding the
turrets (Inclosure 2) which were observed within the building:
(1) (S/NOFORN) Three different turrets were observed, two of which
were essentially similar and appeared to be different variants of the same model
(A] & A,, Inclosure 2 & 3). A third turret (B, Inclosures 2 & 3) was signif-
icantly different in size and contour.
(2) (S/NOFORN) Turret Aj was described as a "humpbacked" turret which
had something resembling a counterbalance on its rear. Turret A, had no such
extension, but rather had a "cut-out" appearing area on its rear which extended
around the side. Source reported the major differences between turrets Aj and
A2 to be that turret Aj had a "harder" turret and a "bigger" barrel (Inclosure
4), but that visually they appeared nearly the same except when viewed from the
side. Source observed more Aj turrets in the building than A2 or B turrets.
(3) (S/NOFORN)
Source stated turrets A1 and A2 were fitted to chassis
which were essentially similar in appearance, except that the chassis corres-
ponding to turret Aj appeared to be "more raked" than that which corresponded
to turret A2 (Inclosure 5).
(4) (S/NOFORN)
Source stated that the components turret B, barrel B,
and chassis B (See Inclosures 2,3,&4) appeared to correspond to an older model
tank being refurbished. The A1 and A, tanks and components, however, appeared
to be undergoing original assembly.
The B tank had a narrower "snout" on the
turret, a barrel length about 2/3ds that of the Aj and A2 tank, and a chassis
and track portion which was also approximately 2/3ds the size of the Aj and
A2 tanks. Additionally, source stated the B tank had a smaller and lighter
engine, and that its turret only had 14" of frontal steel whereas the Aj and
A2 models' turrets were identical in frontal hardness; each having between
16" to 17" of frontal armor.
d. (S/NOFORN)
Source provided the following additional data:
(1) (S/NOFORN) Construction of the barrel/turret assembly is a mult-
iple step process of 20-21 days. The (main gun) tube is the fastest component
completed. Production is occasionally delayed to wait for turret completions,
which is more critical from a quality point.
Approved For Release 2000/08/
SECRET
CIA-RDP96-00788R000200420001-4
2
Approved For Release 2000/08/07 / CIA RDP96-00788R000200420001-4 SG1A
SECRET
SG1A
r
IAFM-OPS-HU-SA
SUBJECT: Unconfirmed Information re. Activity at
23 May 1980
(2) (S/NOFORN)
Source stated the "building next door" (see Inclosure
1) has 8 separate production lines on which the chassis are assembled. The
other building has a production cycle of from 28 to 35 days. Two of the pro-
duction lines are dedicated to the refurbishing of new (A] and A2) model
tanks which have either manufacturing quality deficiencies or have suffered
damage since their original assembly. In this area the old frames/chassis are
torn down, sand blasted, and refitted with new component parts.
(3) (S/NOFORN) The remaining 6 assembly lines are dedicated to as-
sembly of "brand new" vehicles of the Aj and A2 model types. Source stated
that during the initial part of the assembly of both models, they each appear
to have essentially similar frames/chassis. During the final 1/3d of the
assembly process, however, differences are introduced due to the two different
turrets and, possibly, different engines.
(4) (S/NOFORN)
Source estimated the main gun barrel differences to be
slight but significant between the A1 and A2 tanks. Source stated the A2 main
gun barrel appeared to be approximately 122mm, while the A1 main gun barrel
appeared to be nearer 130mm.
(5) (S/NOFORN) Source described the frontal views of both the Aj and
A, chassis ( Inclosure 5) as having a large, wide "straddling" type of stance with
a""Vee" shape on the nose. The type B tank, however, had a narrower, lower
stance with a more rounded belly-pan and less pronounced "Vee" shape.
(6) (S/NOFORN)
Source stated the A1 and A2 turrets were asymmetrical,
both having their front hatch off-set on the front left side when viewed from
the forward ( Inclosure 3).
2. (U) Comments:
SG1A
a. (S/NOFORN)
Initial estimate is that subject building may be that struc-
ture located immediately to the SE and across the street from the large multi-
storied structure located at
within the confines of
subject installation.
b. (U) Request informal evaluation and comments be provided the originator
NLT 17 June 1980.
5 Incl
as
Kennethv. Bill. f
KENNETH V. BELL, JR.
Captain, MI
Action Officer
Approved For Release 2000/08/0
SECRE96-0788R000200420001-4
3,
Reformace
MOLE -
- INSK
CHECK
000
HARDENED CONCRETE
ANSE.
REFURBISHED PROCESSES.
BLOG . PART OF
REFURBISHING AREA
TANK ASSEMBLY
111
HAMM QuiDiNe
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
InCLI
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
SIDE VIEWS
AL.
AZ.
B. 5_
FRONT VIEWS
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
Incl 2
2
TOP VIEWS
16 - 17 IN's.
STEVE
FRONT
HUMBACK
AL.
MOUNT
AZ.
16-17ING
STEEL
PLAT
G
MOUNT.
..
14 INS
SITES
MOUNT.
-
INCL 3
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
1
.
1
-
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
SIDE VIEW
AL.
A2.
B.
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
TANK TUBES
Incl 4
3
SIDE VIEW
DRIVE WHEELS
AL
L
LESS RAKED
12.
OOOO(
B.
THICKER
DECKED
0000
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
Inch 5
4
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
MOLE -
- INSK
ECK
400
ADMIN BUILDING
HARDENED CONCRETE
TANK ASSEMBLY
REFURBISHING AREA
ANSE.
BLOG . PART OF
REFURBISHING PROCESSES
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
0
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
SIDE VIEWS
AL.
AZ.
I
O
B. S
FRONT VIEWS
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
2
SIDE VIEW
AL.
-
A2.
B.
TANK TUBES
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
3
SIDE VIEW
DRIVE WHEELS
AL.
L
LESS RAKED
AZ.
B.
THICKER
DECKER
00000
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
TOP VIEWS
16 - 17 IN's.
STEEL
FRONT
HUMBACK
AL.
MOUNT
AZ.
.
16-17IN6
STER
PRINT
FLAT
MOUNT.
b
..
14 INS
SITES
MOUNT.
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
5
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
£
Approved For Release 2000/08/67 : GIA-RDP96-00788R000200420001-4
Project 8003a
090930 May 80
Session CD2
TARGET CUING INFORMATION
#1
I.
CUING DATA: (Information given to the Viewer)
a.
Shown cy of aerial photo w/extraneous areas blocked out.
SG1A
b. Geo coord:
c. Move in space/time and assess the target at 1000 hours, 9 May 1980
at the target.
II EEI:
(Information given to the Interviewer)
a.
Quick and dirty building description for verification.
b. Enter building and describe activity-move through building.
c. What is the function of this building?
d. What is most important aspect of the building function?
SECRET
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
SG1C
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.