CIA STARGATE release
CIA-RDP96-00788R000200420001-4
Opens with: NOT RELEASABLE TO FOREIGN NATIONALS
Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.
18 pages, machine transcribed from the CIA’s released scan.
Approved For Release 2000/08/07 SECRET NOT RELEASABLE TO FOREIGN NATIONALS ORCON CD-02 1 INSCOM GRILL FLAME .. . . . . PROGRAM SESSION REPORT CLASSIFIED BY: MSG, DAMI-ISH 051630Z JUL 78 REVIEW ON! June 2000 Capy 1 of 2 copies GRILL FLAME Approved For Release 200010 CDL T RDP96-00788R000200420001-4
. Approved For Release 2000/08 -7 : CR DP96-00788R000200420001-4 SUMMARY ANALYSIS REMOTE VIEWING (RV) SESSION CD-02 1. (S) This report documents a remote viewing (RV) session conducted in compliance with a request for information on a target area of interest. 2. (S) The viewer had no trouble locating and describing the target area. Ambient room noise did not disturb the viewer. The viewer expressed his confidence in his imagery. 3. (S) .The protocol used for this session is detailed in the document, Grill Flame Protocol, AMSAA Applied Remote Viewing Protocol (S), undated. 4. (S) Following is a transcript of the viewer's impressions during the remote viewing session. At TAB A are drawings made by the viewer reference his impressions of the target site. At TAB B is target cuing information provided the viewer at the time of this session. At TAB C are analyst's comments. SECRET Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
NOT RELEASABLE TO FOREIGN NATIONALS Approved For Release 2000/08/67 . CJA-RDR96-00788R000200420001-4 SECRET MEMORANDUM FOR THE RECORD 4 June 1980 SUBJECT : Session CD-02 Cuing Data SG1A 1. (S/NOFORN) This was #01's fourth session against (Project 8003a). Previous sessions were CCC25, CCC33, and CCC41. Prior to this session, #01 was shown an aerial photo of the target installation which had all marginal information concealed from view using opaque paper masking (ref session CCC41). On this photo, the targeted building (that to immediate SE of long production building at mensurated coordinates was circled in black grease pencil. The SG1A target structure was clearly pointed out to #01 by the analyst as being the building next to the structure #01 had previously targeted in session CCC41. (S/NOFORN) This was #66's fourteenth session against Project 8003a. #66 also interviewed during session CCC98. Although that session was against a different geographic area, it did result in relative data regarding the type of equipment being sought. Therefore, #66 may have suspected the true nature of targeting as being interconnected with that of session CCC98. 3. (C/NOFORN) A copy of attached Intelligence Report in MFR format dated 23 May 80 was provided to the SED action officer by LTC Watt on 28 May 1980. Kennethv Belt. KENNETH V. BELL Project Analyst CLASSIFIED BY MAA DAMI-ISH ESCLASSIFY ON OR June 2000 REVIEW ON EXTENDED BW REASON GRILL FLAME SECRET Approved For Release 2000/08/07/. CIALRDP96-00788R000200420001-4
NOT RELEASEABLE TO FOREIGN NATIONALS Approved For Release 2000/08/07 CARD06-00788R000200420001-4 2 ORCON DEPARTMENT OF THE ARMY US ARMY INTELLIGENCE AND SECURITY COMMAND FORT GEORGE G. MEADE, MARYLAND 20755 Nİ DEP IAFM-OPS-HU-SA 23 May 1980 MEMORANDUM FOR THE RECORD SG1A SUBJECT : Unconfirmed Information re. Activity at SG1A 1. (U) The following information applies: a. (S/NOFORN) Source provided the following information regarding exterior observations of a structure at subject installation ( Inclosure 1) : (1) (S/NOFORN) The exterior of the structure consists of metal walls having high windows up the sides. The building (appeared) large enough (in height) to accommodate two storys, but only had one story inside. (2) (S/NOFORN) One side of the building faces a longer building across a narrow area surfaced with thick, hardened concrete. This side of the building (which faces the other building) has large sliding doors and slightly inclined ramps accessing it. Windows in this side of the building are located just under the eaves of the structure. The eaves are approximately 25 feet above the hardened concrete area. (3) (S/NOFORN) The building was described as a "plant type" of struc- ture, (appearing) to constitute merely one "plant" within a group of "plants". Source observed a "hum" of activity and steam powered equipment. Source deduced that activity at this "plant is based on raw material which comes from a nearby foundary. b. (S/NOFORN) Source provided the following information regarding interior observations of the same structure ( Inclosure 1): (1) (S/NOFORN) Upon accessing the interior of the structure from the reinforced concrete area between the building and the longer building opposite, a large "bay" area is entered. A large "S" shaped assembly area occupies nearly all of this "bay". (2) (S/NOFORN) The area of this "bay" is described as having heat, 'machines, high pitched whining noises, impact hammering on thick steel, and heavy metal machining. The "bay" was described as a complicated, multiple step manufacturing area where a raw form resembling a turret for an armored vehicle is finished to a certain point. These turrets were initially described as resembling "globs of steel" of a "thick pancake" shape having holes in their tops and "stubby boom pipe or tube affairs" on their ends. The steel was desc- ribed to be of varying thicknesses (8" to 16") depending upon the area of the turret at which it was located. CLASSIFIED BY: HQDA(DAMI-ISH) Msg, td 051630Z Jul 78 REVIEW ON: 23 May 2000 SECRET Approved For Release 2000/08/07 4 SIA-RDP96-00788R000200420001-4
Approved For Release 2000/08/07 [ C/A-RDH96-00788R000200420001-4 SG1A IAFM-OPS-HU-SA SUBJECT: Unconfirmed Information re. Activity at 23 May 1980 SG1A (3) (S/NOFORN) Source stated that two (apparent) functions occur within the building. Within the "bay" area, finishing work and check out of turret assemblies is accomplished. Interconnecting turret parts are properly fitted and finished through a measuring and seating process. Each component is identified with a number, correlated to its related components (like an individual turret assembly), and sent to another part of the plant. Continuity of the "matched" parts is thereby maintained throughout the assembly process. At the other end of the building, objects resembling gun tubes were X-rayed for defects, metallurgical quality control, and purity. c. (S/NOFORN) Source provided the following information regarding the turrets (Inclosure 2) which were observed within the building: (1) (S/NOFORN) Three different turrets were observed, two of which were essentially similar and appeared to be different variants of the same model (A] & A,, Inclosure 2 & 3). A third turret (B, Inclosures 2 & 3) was signif- icantly different in size and contour. (2) (S/NOFORN) Turret Aj was described as a "humpbacked" turret which had something resembling a counterbalance on its rear. Turret A, had no such extension, but rather had a "cut-out" appearing area on its rear which extended around the side. Source reported the major differences between turrets Aj and A2 to be that turret Aj had a "harder" turret and a "bigger" barrel (Inclosure 4), but that visually they appeared nearly the same except when viewed from the side. Source observed more Aj turrets in the building than A2 or B turrets. (3) (S/NOFORN) Source stated turrets A1 and A2 were fitted to chassis which were essentially similar in appearance, except that the chassis corres- ponding to turret Aj appeared to be "more raked" than that which corresponded to turret A2 (Inclosure 5). (4) (S/NOFORN) Source stated that the components turret B, barrel B, and chassis B (See Inclosures 2,3,&4) appeared to correspond to an older model tank being refurbished. The A1 and A, tanks and components, however, appeared to be undergoing original assembly. The B tank had a narrower "snout" on the turret, a barrel length about 2/3ds that of the Aj and A2 tank, and a chassis and track portion which was also approximately 2/3ds the size of the Aj and A2 tanks. Additionally, source stated the B tank had a smaller and lighter engine, and that its turret only had 14" of frontal steel whereas the Aj and A2 models' turrets were identical in frontal hardness; each having between 16" to 17" of frontal armor. d. (S/NOFORN) Source provided the following additional data: (1) (S/NOFORN) Construction of the barrel/turret assembly is a mult- iple step process of 20-21 days. The (main gun) tube is the fastest component completed. Production is occasionally delayed to wait for turret completions, which is more critical from a quality point. Approved For Release 2000/08/ SECRET CIA-RDP96-00788R000200420001-4 2
Approved For Release 2000/08/07 / CIA RDP96-00788R000200420001-4 SG1A SECRET SG1A r IAFM-OPS-HU-SA SUBJECT: Unconfirmed Information re. Activity at 23 May 1980 (2) (S/NOFORN) Source stated the "building next door" (see Inclosure 1) has 8 separate production lines on which the chassis are assembled. The other building has a production cycle of from 28 to 35 days. Two of the pro- duction lines are dedicated to the refurbishing of new (A] and A2) model tanks which have either manufacturing quality deficiencies or have suffered damage since their original assembly. In this area the old frames/chassis are torn down, sand blasted, and refitted with new component parts. (3) (S/NOFORN) The remaining 6 assembly lines are dedicated to as- sembly of "brand new" vehicles of the Aj and A2 model types. Source stated that during the initial part of the assembly of both models, they each appear to have essentially similar frames/chassis. During the final 1/3d of the assembly process, however, differences are introduced due to the two different turrets and, possibly, different engines. (4) (S/NOFORN) Source estimated the main gun barrel differences to be slight but significant between the A1 and A2 tanks. Source stated the A2 main gun barrel appeared to be approximately 122mm, while the A1 main gun barrel appeared to be nearer 130mm. (5) (S/NOFORN) Source described the frontal views of both the Aj and A, chassis ( Inclosure 5) as having a large, wide "straddling" type of stance with a""Vee" shape on the nose. The type B tank, however, had a narrower, lower stance with a more rounded belly-pan and less pronounced "Vee" shape. (6) (S/NOFORN) Source stated the A1 and A2 turrets were asymmetrical, both having their front hatch off-set on the front left side when viewed from the forward ( Inclosure 3). 2. (U) Comments: SG1A a. (S/NOFORN) Initial estimate is that subject building may be that struc- ture located immediately to the SE and across the street from the large multi- storied structure located at within the confines of subject installation. b. (U) Request informal evaluation and comments be provided the originator NLT 17 June 1980. 5 Incl as Kennethv. Bill. f KENNETH V. BELL, JR. Captain, MI Action Officer Approved For Release 2000/08/0 SECRE96-0788R000200420001-4 3,
Reformace MOLE - - INSK CHECK 000 HARDENED CONCRETE ANSE. REFURBISHED PROCESSES. BLOG . PART OF REFURBISHING AREA TANK ASSEMBLY 111 HAMM QuiDiNe Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 InCLI
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 SIDE VIEWS AL. AZ. B. 5_ FRONT VIEWS Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 Incl 2 2
TOP VIEWS 16 - 17 IN's. STEVE FRONT HUMBACK AL. MOUNT AZ. 16-17ING STEEL PLAT G MOUNT. .. 14 INS SITES MOUNT. - INCL 3 Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 1 . 1
- Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 SIDE VIEW AL. A2. B. Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 TANK TUBES Incl 4 3
SIDE VIEW DRIVE WHEELS AL L LESS RAKED 12. OOOO( B. THICKER DECKED 0000 Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 Inch 5 4
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 MOLE - - INSK ECK 400 ADMIN BUILDING HARDENED CONCRETE TANK ASSEMBLY REFURBISHING AREA ANSE. BLOG . PART OF REFURBISHING PROCESSES Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 0
Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 SIDE VIEWS AL. AZ. I O B. S FRONT VIEWS Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 2
SIDE VIEW AL. - A2. B. TANK TUBES Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 3
SIDE VIEW DRIVE WHEELS AL. L LESS RAKED AZ. B. THICKER DECKER 00000 Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
TOP VIEWS 16 - 17 IN's. STEEL FRONT HUMBACK AL. MOUNT AZ. . 16-17IN6 STER PRINT FLAT MOUNT. b .. 14 INS SITES MOUNT. Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 5 Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 £
Approved For Release 2000/08/67 : GIA-RDP96-00788R000200420001-4 Project 8003a 090930 May 80 Session CD2 TARGET CUING INFORMATION #1 I. CUING DATA: (Information given to the Viewer) a. Shown cy of aerial photo w/extraneous areas blocked out. SG1A b. Geo coord: c. Move in space/time and assess the target at 1000 hours, 9 May 1980 at the target. II EEI: (Information given to the Interviewer) a. Quick and dirty building description for verification. b. Enter building and describe activity-move through building. c. What is the function of this building? d. What is most important aspect of the building function? SECRET Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4
SG1C Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4 Approved For Release 2000/08/07 : CIA-RDP96-00788R000200420001-4