Project Interloper

CIA STARGATE release

CIA-RDP96-00787R000700110017-7

Opens with: Dad, we telepathy. let Me try again after meeting

Warning: text for all documents has not been verified. Errors are possible. Check the original by document ID on CREST.

2 pages, machine transcribed from the CIA’s released scan.

1
Dad, we telepathy. let Me try again after meeting
before any data is given luni.
Suggested Protocol for Operational Remote -Viewing Exercise
SG11
two variations : @ that
> NOTE: At the 27 fre 14 meeting (k agan telephoneelly ne 25 firme)
strugle urgia
maki a ve ticket MIR before going to SAY the all that he now Pulant ala
the installation & give it to the bone; (2) that all ist named trommerfits/ oisseurings/ fago models to
goes to SRI
Remote viewing, operational.
SG11
sent to DO for evaluation by NDIC before
Experiment:
SG11
ILLEGIB
Target:
Technical facility.
ILLEGIB
Purpose:
To obtain technical information sufficient to differentiate
among possible alternative technical processes of interest.
SG11
.
Plan:
Mr P. Price
at SRI
8 -12 July, 1974
Carry out a remote-viewing experiment on client-designated
operational target of interest with minimum information
supplied to subject (compatible with designating target
unambiguously).
Program:
SG11
Provide coordinative,
(b)
locate on map, No drawings
or pictures for first
plexe.
SG11
will mathe (c )
phpsexing present, will
concluante tapes, transcriptie
after the decisione without
Confronting Mr. Price
Viewer moves into real-time viewing. Knowledgeable
participant listens to viewer description, lightly
questioning if necessary, in an effort to calibrate
viewer description on the basis of information known
a priori to participant but not to viewer.
Move into phase of more leading questioning, if necessary,
again providing as little cueing as possible so as to
maximize uncued information flow from viewer. Purpose
of this phase is to permit viewer to originate freely
while being guided into area of technical interest. This
is to permit relevant but unprejudiced viewing on the part
of the viewer and continuing calibration on the part of
ILLEGIB
SG11
complete-a coordinator
$ 10% + wannacry : this
. -
SG11 .
Provided
judges
(d)
initial response contains
some real information,
"I" will be implemented
and Price made witting
of U.S. Government Instellenthe knowledgeable participant.
and
rôle.
1. Le (c) Break operation of real-time viewing at this point.
Depending on results, provide viewer with minimal
additional information, e. g., floor plan, process of
interest, etc., to permit two-or three-day period of
relatively unbiased but focussed generation of spontaneous
impressions by viewer.
1
(a) Experiment is to be carried out with participation of
person knowledgeable of structure of target facility
and technical processes of interest.
Provide viewer with target location, by street map
if possible, and provide viewer with picture or drawing
of target facility containing only enough information to
permit visual recognition during target acquisition.
SG11
1
Approved For Release 2000/08/07 : CIA-RDP96-00787R000700110017-7
(f)
Discuss data to date with viewer, and then resume real-
time viewing, providing viewer with additional known
information in order to maximize possible information
retrieval, recognizing that the additional information
supplied to the viewer at this point is at the cost of
calibration within the experiment.
(g)
If and when appropriate, follow experiment with evalua -
tion as to quality of results (to degree possible, recogniz-
ing issues of sensitivity).
SG11
9
July
SG11
10-12
July
will arrive
Palo alto, Ca & be available for evaluating
the first data. Whenever data in judged
to contain a significant amount of
unambiguous data,
will introduce
hunself as Government intelligence
and arme Mr Price of devious internet,
Will continue to question Mr. Price and
Que as necessary to be accurathe
has located the exact target building.
wis If and when Mr. Price has located
exact target, he will be asked questions
provided by
SG11
?
after text, transcript will be provided to
NPIC to weare all physical plant descriptions.
a) unambiguously correct
A) ambizione
-
May 31, 1974
Approved For Release 2000/08/07 : CIA-RDP96-00787R000760110017-7

Follow along

New documents and dispatches as they publish. The newsletter is the one place to keep up.